OPERATIONS SlNMARY OCTOBER, 1986 The unit entered October at 100% Reactor power producing approximately 830 MWe gross electrical generation. The unit operated at 100% power throughout the month with power decaying to approximately 95% the last few days of October due to insufficient core reactivity (fuel depletion).
On October 31,1986 at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> plant shutdown commenced with the reactor at hot shutdown conditions at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />. As of the close of this reporting period, the plant was proceeding to a cold shutdown condition for Cycle 6 Refueling Outage.
MAJOR SAFETY RELATED MAINTENANCE During the month of October, TMI-l performed the following major maintenance:
Motor Driven Fire Puma CS-P Fire service pump FS-P-2 was removed from service due to high s1af t vibration. The pump was disassembled and internal components inspected. The upper shaf t was repaired by spray welding and the impellers and impeller shaft was balanced.
The pump was reassembled,
!nstalled, and balanced in place.
Post maintenance testing was satisfactory and the pump was returned to service.
I ze.aR
\\d
e OPERATING DATA REPORT DOCKET NO.
50-289 DATE 10-31-86 COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 OPERATING STATUS NOTES
- 1. UNIT NAME:
THREE MILE ISLAND UNIT 1
- 2. REPORTING PERIOD:
OCTOBER
,1986.
- 3. LICENSED THERMAL POWER (MWT) :
2535.
4.. NAMEPLATE RATING (GROSS MWE):
871.
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
819.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
824.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
776.
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMMULATIVE
- 11. HOURS IN REPORTING PERIOD 745.
7296.
106633.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 743.0 6268.7 40085.3 13.. REACTOR RESERVE SHUTDOWN HOURS 0.0 990.8 1874.1
- 14. HOURS GENERATOR ON-LINE 742.7 6212.3 39246.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1870830.
15576865.
94927262.
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 616630.
5126718.
31518871.
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 581415.
4818263.
29469975.
- 19. UNIT SERVICE FACTOR 99.7 85.1 36.8
- 20. UNIT AVAILABILITY FACTOR 99.7 85.1 36.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.6 85.1 35.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.3 80.6 33.7
- 23. UNIT FORCED OUTAGE RATE 0.0 4.0 60.2 i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EA"H Currently in a Refueling Outage
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
March 20, 1987
_.~
p-
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
'50-289 UNIT TMI-1 DATE ' 10-31-86 COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 MONTH:
OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWE-NET)
(MWE-NET) 1 771.
17
.793.
2 772.
18
.791.
3 781..
19 793.
4 771.
.20 792.
5 781.
21 792.
6 788.
22 787.
7 792.
23 785.
8 788.
24 786..
9 785.
25 786.
10 794.
26 820.
11 794.
27 785.
12 790.
28 781.
13 784.
29 779.
14 783.
30 755.
15 793.
31 643.
16 793.
1 h
i i
k I
O 50-289 DOCKET NO, UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME TMI-I DATE 10-31-86 OCTOBER.
COMPLETED BY C.W. Smyth REPORT MONTH TELEPHONE /717i 039_RRs1 e
e T
ra
.a
.5 ?
s fEX Licensee Eg l"3 Cause & Corrective No.
Date i
3?
i 2s5 Event u?
o-Action to
$5 5
3 ;% =!
Report a
<E U 5'
Prevent Recurrence e
u c5 1
10/31/86 S
2 C
1 N/A N/A N/A Shutdown for Refueling Outage I
1 2
3 4
F: Fon ed Reason.
Method:
Exlubit G -Instructions S' Siheduled A-l quipmen Failure ( L xplain) 1 -Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 1 Automatic Scram.
Event Reporn (LER) File INUREG-D-Regulatory Restriction 4 Oiher fliplaml 0161) 1 -Operator Training & Iicenw I ummation F Adnunistrative 5
onal 1:irur i tTplaml Isinbit I Same Source G-Operai}E s pl.im )
11 Ottier I 6
Actually used Exhibits F & 11 NUREC 0161
REFUELING INFORMATION REQUEST 1.
Name of Facility: Three Mile Island Nuclear Station, Unit 1 2.
Scheduled date for next refueling shutdown:
July 1, 1988 3.
Scheduled date for restart followirg refueling:
March 20, 1987 4.
Will refueling or resumption of operation thereaf ter require a technical i
specification change or other license amendment?
Yes If answer is yes, in general, what will these be?
Conversion to 18 month fuel cycle with associated changes to Power Imbalance, Quadrant Tilt and Rod Insertion Limits.
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
No If no such review has taken place, when is it scheduled?
To be determined.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
submitted November 3,1986 6
Important licensing considerations associated with refueling, e.g. new or different fuel design er supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 7.
The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
(a) 177 (b) 208 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The present licensed capacity is 752.
There are no planned increases at this time.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1991 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).
o GPU Nuclear Corporation Nuclear
- ,o=g:,v8o Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
November 13, 1986 5211-86-2193 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20553 Attn:
Document Control Desk
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report October, 1986 Enclosed please find two (2) copies of the October,1986 Honthly Operating Report for Three Mile Island Nuclear Station, Unit-1.
Si ncerely, I
I
. D. Hu ill i
Vice President & Director, TMI-l l
HDH:DVH:spb l
l cc: Dr. T. E. Murley Attachments 0015C I
t\\
GPU Nuclear Corporation is a cubsidiary of the General Public Utilities Corporation
..