Provides Final Cost Figures for Marviken II Program.Funds Not Used by Project Applied to Purchase of Addl Final Repts. All Cost Figures Shown in Swedish Crowns
ML20212M858
Person / Time
Issue date: 09/30/1977
From: Slegers L
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Fabic S
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20209A640 List: ... further results
References
FOIA-85-782 NUDOCS 8701300256
Download: ML20212M858 (4)


Text

.

. c.%

  • f 3 UNITED STATES

=e 4,4 NUCLEAR REGULATORY COMMISSION /

^

WA SHINGTON, D. C. 20555 Md

%...../ SEP 3 01977 l MEMORANDUM FOR: S. Fabic, Chief Analysis Development Branch FROM: L. Slegers Analysis Development Branch

SUBJECT:

MARVIKEN II (MX-II CRT) PROGRAM FINAL COSTS With the Marviken II program completed, the final cost figures are avail-able and show a small underrun. The NRC part of the funds not used by the project have been applied to the purchase of additional final report copies. Under the terms of the agreement each participant receives one copy of the final report. The final cost figures for the USNRC part of the program are shown below. All cost figures are shown in Swedish Crowns.

1. Program costs as in original MX-II agreement 3,045,000.

(21% of 14,500,000 Scr)

2. Extra reserve funds as specified by Amend- 193,300.

ment III to the agreement.

3. Total costs of USNRC participation 3,238,000.

b= 4. The USMC has been billed to date. 3,006,179.53

5. Additional billing still to be received 121,009.68 by USNRC
6. ' Credit received by NRC for labor contributed 21,450.

to the project (Mr. Slaughterbeck)

7. Total payments to Project 3,148,639.21
8. Cost underrun 89,660.79 For the amount shown under (8) the following program documentation has been ordered by the NRC:

I 9. 20 sets of final report 80,000.

5 copies of summary and conclusion reports 1,480.

8701300256 870120 PDR FOIA l MORROW 85-782 PDR

/ /

Y'/

256

o . . .

S. Fabic 2 copies of video tapes of suppression pool video 8,000.

coverage 89,480.

This amount applied to the underrun item (8) leaves 180.79 Scr. below contracted costs. The contract management branch is asked whether their records for payments to date to the project agree with item (4) and whether, in view of fluctuating exchange rates, enough funds are ob-ligated to cover items (5) and (9) for which payment must still be made.

bQ " "7 L. Slegers - (

Analysis Development Branch Division of Reactor Safety Research cc: R. Tedesco, DSS T. Murley, RSR L. S. Tong, RSR M. Hayes, RES R. Scroggins, RSR

  • .,. + ,

SEP 3 01gn m

, r, IEMORANDUM FOR: 5. Fabic. Chief Analysis Development trench PRON: L. 51egers Analysis Development Branch

$UBJECT: IgutVIKENII(MX-IICRT)PROGRAMFINALCOSTS With the Marviken II program sempleted, the final cost figures are avail-able and show a small underren. The MC part of the funds. not used by the project have been applied to the purchase of additional final report copies. Under the teries of the agreement each participant receives one copy of the final report. The final cost figures for the Usuc part of the program are shown below. All cost figures are shown in Swedish Crowns.

1. program costs as in original let-II agreement 8.045.000.

(21% of 14.500.000 Scr) -

2. Extra reserve funds as specified by Amend- 193.3C3.

ment III to the agreement.

O

l. . 3. Total costs of Usec participation 3.r38.000.
4. The Use c has been billed to date. 8.006.179.53

.; _=-  :

. 5. Additional billing still to be received 121.009.68 5 by USNRC

}~

l

6. Credit received by NRC for labor contributed 21.450.

to the project (Mr. Slaughterbeck) .

,. 7. Total payments to project _ 3.148.639.21

^

8. Cost i h 39.660.79 b For the amount shown under (8) the following program documentation has been ordered by the M C:

. 9. 20 sets of final report 80.000.

5 copies of summary and conclusion reports 1.480. ,

f,et OPPIC E >

~

.unnaus h g

ears >

, - ,. - - +.---.-

64 s

A ..

S. Fabic m 2 copies of video tapes of suppression pool video 8.000 coverage 89.430. >

This enount applied to the underrun item (8) leaves 180.79 Scr. below contracted costs. The contract management branch is asked whether their records for payments to date to the pseject agree with item (4) and whether 11 gated in to view coverofitems fluctuating (5) and (exchange rates, enough funds are ob-g)forwhichpaymentmuststillbemade.

Original Gsgned by L.Sleges L. $legers '  ;

Analysis Development trench Division of Reactor Safety Research cct R. Tedesco. DSS T. Murity. RSR L. S. Tong RSR M. Hayes, RES R. Scroggins. RSR s

DISTRIBUTION

?;== Subj Circ Chron Branch RF -

LS RF  :

LS CY~

dF CY -

GLB CY LST CY 3

e 7'

f ]m

orrie s

  • RS&"JW RSR:W 7SR:WY '

' u ==a = = >

. l Slabv.s/ha S.Fabic/?f Bol Ant,tITIg 1 47 ears, 4/94/77 QFf /77 97 /77 h _NRC FORM Sta (9 76) NRCM 0240 W u. s. oovenwuh rmwtime orriese tore- eas4a4 , g

. - . . . - - - . _ . . -