ML20209E678

From kanterella
Jump to navigation Jump to search
Advises That Neither Environ Assessment or EIS Necessary for 870401 Application for Amend to License SNM-1107, Incorporating Leak Test Requirements for Sealed Plutonium Sources
ML20209E678
Person / Time
Site: Westinghouse
Issue date: 04/27/1987
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20209E624 List:
References
NUDOCS 8704300097
Download: ML20209E678 (2)


Text

F~

~.

APR 2 71987 FCUF:GL DOCKET NO: 70-1151 APPLICANT: Westinghouse Electric Corporation FACILITY: Columbia, South Carolina

SUBJECT:

CATEGORICAL EXCLUSION FOR CHANGE IN LICENSE CONDITION DATED, APRIL 1,1987 By letter dated April 1, 1987, Westinghouse Electric Corporation submitted an amendment request for leak test requirements for sealed plutonium sources for License No. SNM-1107. These changes are strictly procedural in nature and will not compromise environmental protection. There is no significant increase in the potential for or consequences from radiological accidents. Therefore, in accordance with 10 CFR 51.22(c)(11), neither an Environmental Assessment nor an Environmental Impact Statement is warranted for this proposed action.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed Pvt Leland C. Rouse, Chief Fuel Cycle Safety Branch Division of Fuel Cycle, Medical, Academic, and Commercial Use Safety

_b1. _________1____[J[_h____1 /

. __I _____ "S$_____1.

_ _______1__ SI$_______5._________

DATE:044T87 :04A)/87 :04/N87 :04/1///87  : I 0FFICIAL RECORD COPY l 8704300097 870427 PDR ADOCK 07001151 t C PDR

-l

o I

NMSS/ Fuel Cycle Material FCUE FCAF File:

Dccket # lo- U SI Project #

'Other PDR /

LPOR Return to G-SS 39 t__

l l

i W