Text
3-Georgia Pcwer Company Pbst Offica Box 282 WanzsboroL Georgia 30830 -
Telephone 404 554-9961 ~
404 724-8114 Southern Company Services,Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011
.y gp g
January 8, 1987
~
- Director of Nuclear Reactor Regulation File: X3BL01 1
Attention:. Mr. B. J. Youngblood Log:
GN-1270 PWR Project Directorate #4 Division of PWR Licensing A 1
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 REF:
(1) GPC LETTER GN-1121-DATED OCTOBER 17, 1986 3
(2) GPC LETTER GN-1159 DATED OCTOBER 31, 1986 (3) GPC LETTER GN-1229 DATED DECEMBER 12,'1986 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109
.V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 i
CONFIRMATORY ITEM 36: TDI DIESEL GENERATORS
Dear Mr. Denton:
1 In. response to the SER dated August 8, 1986 concerning TDI Diesel Generators Georgia Power Company (GPC) has provided various commitmeats in the referenced letters. GPC hereby reports the ' status of those i
commitments as.follows:
I i.
The baseline ultrasonic elongation measurements of the connecting rod bolts above the crankpin have been performed.
{
2.
The torstograph test is complete and the results have been evaluated.
3.
The turbocharger thrust bearing has been inspected for signs of excessive wear.
4.
The liquid penetrant test has been performed on the turbocharger p
stationary nozzle ring.
_5.
The follower lobe on the starting air distributor has been installed.
i i
6.
The starting air distributor cam lobes and valve spools have been
. evaluated for wear.
l j.
7.
The as-installed condition of the mounting hardware for the fuel oil filters and strainers has been visually inspected.
I MO f f
1 11 8701200233 870108 L
5 PDR ADOCK 05000424, E
.s Director of Nuclear Reactor Regulation File: X3BL01 January 8, 1987 Log:
GN-1270 Page 2 l
8.
Procedures for inspection of the capscrews which hold the waterjacket to the exhaust manifold assembly support following an SSE are complete, approved and incorporated into the maintenance and sur-veillance matrix.
9.
Procedures for venting the governor lube oil system are complete and approved.
A complete response to the SER was provided in the referenced letters.
With this additional information Georgia Power Company considers this confirmatory issue to be complete.
If your staff requires any additional infonnation, please do not hesitate to contact me.
Sincerely, J. A. Bailey Project Licensing Manager JAB /ddd Attachment xc:
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig
- 5. W. Churchill, Esquire R. A. McManus M. A. Miller (2)
L. T. Gucwa B. Jones, Esquire Vogtle Project File G. Bockhold, Jr.