Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Review Involved Participation of Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of March to Sept 1997
ML20199D989
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
NUDOCS 9711210077
Download: ML20199D989 (6)


Text

.y - . . . . - - , , . .~ . . .~ - - - - -

4 s j+  ; '

d g* #8%g UNITEo ST ATE S 2[t 4 f-i NUCLEAR REGULATORY COMMISSION- ,

^m _ .

/ REoloN iv :

{L- _

Tk /- 611 MY AN PL AZA oRIVE, SUITE 400 -

ARLINoToN, TE XAS 7601,8064

~

~ I19 . . . . + .8 y _,

. .g t, .a.4 Garry L. Randolphi Vice President and' -

Chief Nuclear Officer '

Union Electric Company ,

P O. Box 620. )

Fulton, Missouri 65251

SUBJECT:

- SEMIANNUAL PLANT PERFORMANCE REVIEW ;SPPR) CALLAWAY PLANT

Dear Mi. Randolph:

On October 9,1997, the NRC 8taff completed tho Semiannual Plant Performance Review (SPPR) of Callaway Plant. The staff conducts these reviews for all operating nuclear power plants to develcp an integrated understanding of safety performance. The results are used by NRC management to f acilitate planning and allocation of ir.spection resources. The SPPR for Callaway Plant involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March to i September 1997. SPPRs provide NRC management with a current summary of licensee ,

perfornvince and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Callaway Plant SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolvad in advance of inspector arrival onsite.- The enclosure details our inspection plan for the next 8 months, The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature, We willinform you of any changes to the inspection plan, if you have any questions, please contact W. D. Johnson at (817) 860 8148.

Sincerel homas P, Gwy , Dire tor Division of Reac or Pr jects  !

I

' Docket No.: 50i483 License Nos.: NPF 30 f I

Enclosure:

Inspection Plan 9711210077 971114 DR ADOOK O g3 llf

-j

$H

- =

Union Electric Company: 2-

- cc w/ enclosure: _ _ __

i*rofessional Nuclear Consulting,- Inc.

19041 Raines Drive Derwood, Maryland 20855 Gerald Ch'arnoff, Esq.

Thomes A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge _.

2300 N. Street, N.W.

Washington,-D.C. 20037

- H. D. Bono, Supervising Engineer Site Licensing-

' Union Electric _ Company- .

P.O. Box 620

Fulton Missouri 65251 s

Manager - Electric. Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 '

Burlington, Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition

-.for the Environment

~

6267 Delmar Boulevard .

University City, Missouri 33130 '

Lee Fritz, Presiding Commissioner Callaway County Court House -

10 East Fif th Street

= Fulton. Missouri 65151

g, . . - ~. . .. .- _ . . _ _ _ . .- - . . .- ...

.w _

jf p.m El4S+ ' ,' -

Union Electric Companv_: . -3 . _ ,

c _ ,

i f A8an C. Passwater, Manager

~ . Licensing and Fuels 1

Union Electric Company;.-
P.O. Rox 63149 l

- ?

St. Louis, Missouri? 63166-6149

-- J. V. Laux, Manager -

Quality Assurance . ,

Union Electric _Comoany-P.O. Box 620 -- -

Fulton,: Missouri ' 65251 I

a

'b 1 ._

f.

b a

e 4

4

[.

~ . - . L .; < ..

, , , _ . - . . _ . , . . , - - . . . . . . . . . , ,,4. ,

l Union Electric Ct npany 4- NOV I 41997 bec to DCD (IE01) bec distrib by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/B) MIS System Project Engineer (DRP/B) RIV File Branch Chief (DRP/TSS)

DOC'JMENT NAME: R:\_CW\CWSP9704.LTR To receive copy of document, indicate in box: "C' = Copy without enclosures "E" = Copy wih enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B D:DRS ,, D:DRP p DNGraves;dt g3 WDJohnsonp ATHowel1 9 TPGwynn (/ f 10/S$ /97 10/4 /97 Y 1$/ [3/97 /.4' / 1 $//'f/97 '

OFFICIAL RECORD Cd5Y

y, .._. . .- _ ._ ..~ _. . . . . _ . - . .

_; . _ , Ji  ;

t Union Electric Companyi -4. , 4 Jr1097

(

l^ bec to DCDilE01);

~

> +

bec distrib, by.RiV: .

.Rogional _ Administrator.  : Resident inspet tor: '

DRP Director ' DMS-PSB (

- Branch Chief (DRP/BI-

~

  1. ils System - i
Project Engineer (ORP/0)__ - RIV File Bronclithief (DRP/TSS)

~ '

d' i-1 n.

DOCUMENT NAME:. R:\, CW\CWSP9704.LTR

- To receive copy of document, Indicate in box: "C" = Copy vnthout enclosures "E" = Copy wth enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B D:DRS D:DRP W "

DNGraves;dt g3 WDJohnsonp . ATHowell '4 TPGwynn (/ f 10/,g /97 10/vi/97 Y 1$/ ' /97 1$/ /'f/97 '

. OFFICIAL RECORD COPY 1

-t 4yy rr- * - *

= .

.A m!:

.m CALLAWAY PLANT INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction '

Core inspection - Minimum NRC Inspection 9rogram (mandatory all plants)

INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 81700 Physical Security Progrcm 1 3/23-27/98 Core inspection IP 73753 Inservice Inspection 1 4/13-17/98 Core inspection IP 82701 Operational Statu of the EP 2 6/29-7/2/98 Core inspection P ogram