ML20148J470

From kanterella
Jump to navigation Jump to search
Requests for Addl Info Re Response to Generic Ltr 83-28, Item 2.1(Part 1), Equipment Classification Program (Program for Reactor Trip Sys Components). Response Requested within 45 Days of Ltr Receipt
ML20148J470
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/24/1988
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
References
GL-83-28, NUDOCS 8803300279
Download: ML20148J470 (5)


Text

--

March 24, 1988 3

Docket No. 50-458 Mr. James C. Deddens Senior Vice President, (RBNG)

Gulf States Utilities P. O. Box 220 St. Francisville, LA 70775 ATTN: Nuclear Licensing

Dear Mr. Deddens:

SUBJECT:

RE0 VEST FOR ADDITIdNAL INFORMATION - GENERIC LETTER 83-28, ITEM 2.1 (PART 1)

Gulf States Utilities responded to Item 2.1 (Part 1), "Ecuipment Classification Program (Programs for Reactor Trip System Components)" of Generic Letter 83-28, by letters dated August 3, 1984 and May 20, 1985. Our review of these submittals discloses the need for additional infonnation as described in the enclosure.

Please provide your respense to the enclosure within 45 days of the receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

\\s Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION.

' Docket File NRC PDR Local PDR PD4 Reading s

DR4A/J. Collins J. Calvo P. Noonan W. Paulson 0GC-Rockville E. Jordan J. Partlow ACRS (10)

PD4 Plant File PD4/LAS}

PD4/PM

/'

PD4/D.j}iU PNoona 03/13/p WPaul,pon:sr JCalvc 88 03/77/88 03/p//88 h!k Db 8

P

March 24, 1988 Docket No. 50-458 Mr. James C. Deddens Senior Vice President, (RBNG)

Gulf States Utilities P. O. Box 220 St. Francisville, LA 70775 ATTN: Nuclear Licensing

Dear Mr. Deddens:

SUBJECT:

RE0 VEST FOR ADDITIdNAL INFORMATION - GENERIC LETTER 83-28 ITEM 2.1 (PART 1)

Gulf States Utilities responded to Item 2.1 (Part 1)), "Equipment Classification Program (Programs for Reactor Trip System Components " of Generic letter 83-28, by latters dated August 2. 1984 and May 20, 1985. Our review of these submittals discloses the need for additional information as described in the enclosure.

Please provide your respense to the enclosure within 45 days of the receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, W.

Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Pro.4ects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading DR4A/J. Collins J. Calvo P. Noonan W. Paulson OGC-Rockville E. Jordan J. Partlow ACRS (10)

PD4 Plant File JCalvo)k PD4/L

)b PD4/PM r

PD4/D.

PNoon WPauljon:sr 0383/88 03/77/88 03/2//88

g.

- W touq[o UNITED STATES g

i j,

?>

NUCLEAR REGULATORY COMMISSION 5

l W ASHINGTON, D. C. 20555 g

March 24,1988 Docket No. 50-458

~

Mr. James C. Deddens SeniorVicePresident,(RBNG)

Gulf States Utilities P. O. Box 220 St. Francisville, LA 70775 ATTN: Nuclear Licensing

Dear Mr. Deddens:

SUBJECT:

RE0l'EST FOR ADDITIONAL INFOPy.ATION - GENERIC LETTER 83-28, ITEM 2.1 (PART 1)

Gulf States Utilities responded to Iten 2.I (Part 1), "Equipment Classification Program (Prograns for Reactor Trip System Components)" of Generic letter 83-28, by letters dated August 3, 1984 and May 20, 1985. Our review of these subr.ittals discloses the need for additional information as described in the enclosure.

Please provide your response to the enclosure within 45 days of the receipt of this letter.

The reporting and/or recordkeeping reautrements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, (UatAAa6 Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page l

J 2

i g,

c Mr. James C. Deddens Gulf States Utilities Company River Bend Nuclear Plant ec:

Troy B. Conner, Jr., Esq.

Mr. J. E. Booker Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.

20006 Beaumont, TX 77704 Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Derkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild-Reinike Baton Rouge, Louisiana 70806 Louisianians for Safe Energy, Inc.

2108 Broadway Street New Orleans, Louisiana 70118-5462 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisv111e, Louisiana 70775 Office of Executive Director for Operations Mr. Frank J. Uddo 611 Ryan Plaza Drive. Suite 1000 Uddo 8 Porter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895 i

O...

ENCLOSURE RIVER BEND STATION DOCKET NO. 50-458 REQUEST FOR ADDITIONAL INFORMATION_

~

FOR GENERIC LETTER 83-28, ITEM 2.1 (pART 1)

INTRODUCTION:

We have reviewed the response to Generic Letter 83-28, Item 2.1 (Part 1). d August 3, 1984 and May 20, 1985 phvided by Gulf States Utilities Comp licensee for the River Bend Station, and find them acceptable with the The licensee is requested to provide additional following exception.

information for these items as described below.

t Evaluation and Specific Information Reques__:

Evaluation:

The licensee's submittal of August 3,1984 described a program that was being Their next submittal dated developed to meet the requirements of this item.

stated that they had initiated a program to ensure that reactor May 20, 1985 trip components are identified and labeled as safety-related on relevant plan 15, 1985.

The estimated conpletion date was stated to be August documents.

==

Conclusion:==

Based on the licensee's submittals, we are unable to conclude that the licensee has completed and implemented a program of equipment classification that meets the requirements of this item because we have received no further infomation from the licensee confirming completion and implementation of a The licensse should identify the program to be used and confirm its program.

completion and implementation.