Forwards SER Accepting Util Deviations from Reg Guide 1.97 for Each post-accident Monitoring Variable W/Exception of Neutron Flux.Existing Neutron Flux Instrumentation Acceptable for Use in Interim Pending Implementation of Sys
ML20148B033
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/14/1988
From: Abelson H
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20148B037 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8803210329
Download: ML20148B033 (2)


Text

_

March 14, 1988 Docket No. 50-333 DISTRIBilTION diiiiTeTTITe7 EJordan NRCPOR JPartlow local PDR ACRS(10)

Mr. John C. Brons PDI-1 Rdg.

0GC Executive Vice President, Nuclear CVogan JJohnson,RI Generation HAbelson BBoger Power Authority of the State SVarga of New York 123 Main Street White Plains, New York 10601

Dear Mr. Brons:

SUBJECT:

CONFORMANCE TO REGULATORY GUIDE (R.G.) 1.97, REVISION 2 Re: James A. FitzPatrick Nuclear Power Plant The enclosed Safety Evaluation Report (SER) docLeents our review efforts concerning conformance to R.G. 1.97 and supplements the preliminary Technical Evaluation Report (TER) prepared by our contractor, EG&G, and transmitted to you by letter dated November 5, 1985. The SER and accompanying final TER reflect your submittals up to and including November 11, 1987.

Based on our review, we find that you are in conformance with, or have adequately justified deviations from, R.G.1.97 for each post-accident monitoring variable with the exception of neutron flux.

The existing neutron flux instrumentation, however, is acceptable for interim use pending satisfactory implementation of a fully qualified system.

l Sincerely, i

d Harvey Abelson, Project Manager Project irectorate I-1 Division of Reactor Projects, I/II

Enclosures:

As stated cc:

See next page j

48 h

PDI-1 PDI-1 CVogan H2 son:mak RCapra 3/ /88 3/l4/88 3/it/88 i

l 8803210329 090314 PDR ADOCK 05000333 i

p PDR

{

I

Mr. John C. Brons James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant cc:

Mr. Gerald C. Goldstein Ms. Donna Ross Assistant General Counsel New York State Energy Office Power Authority of the State

? Empire State Plazi of New York 16th Floor 10 Colurrbus Circle Albany, New York 12223 New York, New York 10019 l

Resident Inspector's Office U. S. Nuclear Regulatory Conmission Pegional Admir.istrator, Pegion 1 Post Office Box 136 U.S. Nuclear Regulatory Comission Lycoming, New York 13093 475 Allendale Road ring of Prussia, Pennsylvania 19206 Mr. Radford J. Converse Mr. A. Klausman Resident Manager Senior Vice President - Appraisal James A. FitzPatrick Nuclear and Compliance Services Power Plant Power Authority of the State Post Office Box 41 of New York Lycoming, New York 13093 10 Columbus Circle New York, New York 10019 Mr. J. A. Gray, Jr.

Mr. George Wilverding, Manager Director Nuclear Licensing - BWR Nuclear Safety Evaluation Pcwer AutFority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street Wnite Plains, New York 10601 White Plains, New York 10601,

Mr. Robert P. Jones, Supervisor Mr. R. E. Beedle Town of Scriba Vice President Nuclear Support R. D. f4 Power Authority of the State Oswego, New York 13126 of New York 125 Main Street Mr. J. P. Bayne, President White Plains, New York 10601 Power Authority of the State of New York Mr. S. S. Zulla 10 Columbus Circle Vice President Nuclear Engineering New York, New York 10019 Power Authority of the State of New York Mr. Richard Patch 123 Main Street Quality Assurance Superintendent White Plains, New York 10601 James A. FitzPatrick Nuclear Power Plant Mr. R. Burns Post Office Box 41 Vice President Nuclear Operations Lycoming, New York 13093 Power Authority of the State of New York 123 Main Street White Plains, New York 10601

)