MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 ML20202H5991997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Callaway Plant,Unit 1 ML20199B4061997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Callaway,Unit 1 ML20211M9691997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Callaway Plant,Unit 1 ML20217A4941997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Callway ML20210H8841997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Callaway Plant, Unit 1 ML20149D9001997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Callaway Plant Unit 1 ML20140H0261997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Callaway Plant Unit 1 ML20141B3741997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Callaway Plant,Unit 1 ML20137T2971997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Callaway Plant.W/ ML20135F3471997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Callaway Plant, Unit 1 ML20134M1961997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Callaway Plant Unit 1 ML20133G0211996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Callaway Plant, Unit 1 ML20149M2871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Callaway Plant Unit 1 ML20134K5761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1 ML20128N2541996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Callaway Plant Unit 1 ML20117K7321996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Callaway Plant Unit 1 ML20116H9691996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Callaway Plant Unit 1 ML20115D2701996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Callaway Plant Unit 1 ML20112J7281996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Callaway Plant Unit 1 ML20111B2831996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Callaway Plant Unit 1 ML20101R0581996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Callaway Plant Unit 1 ML20106G8601996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Callaway Plant,Unit 1 ML20100F7331996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Callaway Plant ULNRC-03312, Monthly Operating Rept for Dec 1995 for Callaway Unit 11995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Callaway Unit 1 ULNRC-03300, Monthly Operating Rept for Nov 1995 for Callaway Plant1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Callaway Plant ULNRC-03289, Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 11995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 1 ULNRC-03273, Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 11995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 1 ULNRC-03266, Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 11995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 1 ULNRC-03250, Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 11995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30
[Table view] |
Text
.a ,
8 Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-483 -
UNIT Callaway
DATE 12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) i 1122 37 1125 129 3, 1116 2
809 1123 3 3, .
4 685 1129 20 3 0 21 1138
- 0 1123 a 22 y 0 1092 23 s 517 24 1107 g 1106 5 1095 10 1134 , 1104 11 1063 27 1136 12 50 3 1138 13 811 3 1141 14 1108 3g 1140 15 1105 33 16 1123 8602190052 851130 i PDR ADOCK 05000483 )
R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204
e s
Part D OPERATING DATA REPORT DOCKET NO.
50-483 UNIT Callaway DATg 12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONg (314) 676-8460 OPERATING 8TATUS
. REPoRTtNo PeRico: November 1985 Gross Moums IN REPORTING PERICO: 720 ,
- 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:
3411 Max. DepeNO. CAPACITY tmwed. 1120 ossicm ELsCTRICAL RATINo tMw Neo: 1171* At stretch power level which is not a currentiv authorized under the operating M gense.
- 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned: 1
- 4. REASONS FOR RESTRICTION llP ANY1:
THIS MONTM YM TO DATE CuMuLAfivt S. NuMetR of wouRs REACTOR was CRIT: CAL , ... . ..
695 7463.8 7766.3
- s. REACTOR RESERVE shutdown MOUR$ . . . .
0 0 0 7 HOURS GENERATOR ON LINE . . .
605.1 7208.9 7511.4
- e. unit REsERva swuToowN Hours .. . . ...
0 0 0
- 9. Gross THERMAL ENERGY GENER ATED IMwMI ..
.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI . . . .
668.969 7.714.156 8.053.336
- 11. NET ELECTRtCAL ENERGY GENERATED IMwMI ..... .
615.1R4 7.121.780 7 Aaa.n03
- 12. REACTom SERVICE PAcrom ..... . ... ... ..
96.57 91.17 93.4g 96.5% 93.1% 93,4% l
- 13. REACTOR AV AILAe1LITY P ACTOR . . . ... . .
l 14 UNIT sERvlCE PACTOR . . .............. . . , ...
84.1% 89.9% 90.3%
I
- 19. uN 7 AVAILA81LiTY PACTOR .. . ... . .. . .....,
84.1% 89.9% 90.3% ,
- 18. uNif CAPACITY P ACTOR tuesne MOC) . . . ....,...... 78.8% 81.6% A7.1Y t7. UNIT CAPACITY PACToM tu ee o.eien Mweet . . . . . . . ........
75.3% 78.0% 78.52 l ts. unit soRCao ouTAce RAf t . *15.9% 6.1% 5.9%
... .... ............. l 1
is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI: l Refuel, 2/28/85, approximately 42 days.
- 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:
l 1
l ENNk I Page 3 of 4 qap.zz.04204
x D -
~
e-Y .
,: Pare E DOCKET NO. 50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J- , DATE 12/s/85 n
4 COMPLETED BY DAN B. PRATTE
[F; REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C .
7,,. :
H 40ETHOD OF k TYPE SHUTTING DOWN I F: FOACED DURATION THE REACTOR OR
~
00 0. DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F 15 hrs. A 3 Rod control problem caused a group of
- 30 min. rods to drop and reactor trip.
LER 85-048-00 s 25 11-4 F 81 hrs. A 1 Forced unit shutdown to mode 4 to repair N 11 min. packing leak on pressurizer valve.
6 L ,
26 11-11 F 18 hrs. A 3 Unit tripped due to main generator 5 min. stator cooling water temperature qj controller failure. Incrpased stator t,
cooling temperature to trip setpoint.
- 'y
i} 27 11-24 S 48 hrs. B 1 Power reduced to repair leaks on h
secondary.
Tj h
l-jj """**M Y: ,
M 't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST - 2: BAAIIUAL ScaAat
- C asynsrsassr: 3: Attgees4TICscaAss ,
i D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t? E: cesaAigainassuesG AIGD 7: LaCEIEEE EXAaIIss419006
[ F: ADIABWTaAftvE
- j c cetaAftoseALEamos(EEFLANG)
"'""*" CA-#804 3 05/09/84 f; Page 4 of 4 QDP-ZZ-04204 1.-;
3
- g. .__ .,, ._
_. - ._ .-__-_ W :
1 o
, saa
, f' .
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i <
Technical Specifications.
S. E. Miltenberger
~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure ;
cc: Distribution attached l
Mczng Addess: P.O. Box 620. FuMon, MO 65254 l l
J
_ .. z,
.s.
=
.s.
i
_t dintribution for ULNRC-1217
~
with enclosures.
Mr.' James G. Keppler Regional Administrator
,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III
-799 Roosevelt Road -
Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector
_____.____-____._________.a
. s-MONTHLY OPERATING REPORT DOCKET No. 50-483 UNIT NAME 6 DATE nFPFMRFR 5. 19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 -
PART A OPERATIONS
SUMMARY
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:
- 1. On 11/2/85 the unit tripped due to a rod control problem and was back
~
on line the same day.
- 2. On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
- 3. On 11/11/85 the unit tripped due to a temperature- control valve failure j on Stator Cooling Water. The unit was back on line 11/12/85.
O 4. On 11/23/85 load was reduced to renair leaks in secondarv side. Unit was returned to full power 11/24/85.
- PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE s
8 i
f CA-#804 Q 05/09/84 Page 1 of 4 ff,h ' QDP-ZZ-04204 j
<