Monthly Operating Rept for Nov 1985
ML20137U097
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1985
From: Miltenberger S, Pratte D
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1217, NUDOCS 8602190052
Download: ML20137U097 (6)


Text

.a ,

8 Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-483 -

UNIT Callaway

  • ~

DATE 12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) i 1122 37 1125 129 3, 1116 2

809 1123 3 3, .

4 685 1129 20 3 0 21 1138

  • 0 1123 a 22 y 0 1092 23 s 517 24 1107 g 1106 5 1095 10 1134 , 1104 11 1063 27 1136 12 50 3 1138 13 811 3 1141 14 1108 3g 1140 15 1105 33 16 1123 8602190052 851130 i PDR ADOCK 05000483 )

R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204

e s

Part D OPERATING DATA REPORT DOCKET NO.

50-483 UNIT Callaway DATg 12/5/85 COMPLETED BY DAN B. PRATTE TELEPHONg (314) 676-8460 OPERATING 8TATUS

. REPoRTtNo PeRico: November 1985 Gross Moums IN REPORTING PERICO: 720 ,

2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:

3411 Max. DepeNO. CAPACITY tmwed. 1120 ossicm ELsCTRICAL RATINo tMw Neo: 1171* At stretch power level which is not a currentiv authorized under the operating M gense.

3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned: 1
4. REASONS FOR RESTRICTION llP ANY1:

THIS MONTM YM TO DATE CuMuLAfivt S. NuMetR of wouRs REACTOR was CRIT: CAL , ... . ..

695 7463.8 7766.3

s. REACTOR RESERVE shutdown MOUR$ . . . .

0 0 0 7 HOURS GENERATOR ON LINE . . .

605.1 7208.9 7511.4

e. unit REsERva swuToowN Hours .. . . ...

0 0 0

9. Gross THERMAL ENERGY GENER ATED IMwMI ..

.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI . . . .

668.969 7.714.156 8.053.336

11. NET ELECTRtCAL ENERGY GENERATED IMwMI ..... .

615.1R4 7.121.780 7 Aaa.n03

12. REACTom SERVICE PAcrom ..... . ... ... ..

96.57 91.17 93.4g 96.5% 93.1% 93,4% l

13. REACTOR AV AILAe1LITY P ACTOR . . . ... . .

l 14 UNIT sERvlCE PACTOR . . .............. . . , ...

84.1% 89.9% 90.3%

I

19. uN 7 AVAILA81LiTY PACTOR .. . ... . .. . .....,

84.1% 89.9% 90.3% ,

18. uNif CAPACITY P ACTOR tuesne MOC) . . . ....,...... 78.8% 81.6% A7.1Y t7. UNIT CAPACITY PACToM tu ee o.eien Mweet . . . . . . . ........

75.3% 78.0% 78.52 l ts. unit soRCao ouTAce RAf t . *15.9% 6.1% 5.9%

... .... ............. l 1

is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI: l Refuel, 2/28/85, approximately 42 days.

  • l
20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:

l 1

l ENNk I Page 3 of 4 qap.zz.04204

x D -

~

e-Y .

,: Pare E DOCKET NO. 50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J- , DATE 12/s/85 n

4 COMPLETED BY DAN B. PRATTE

[F; REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C .

7,,. :

H 40ETHOD OF k TYPE SHUTTING DOWN I F: FOACED DURATION THE REACTOR OR

~

00 0. DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F 15 hrs. A 3 Rod control problem caused a group of

- 30 min. rods to drop and reactor trip.

LER 85-048-00 s 25 11-4 F 81 hrs. A 1 Forced unit shutdown to mode 4 to repair N 11 min. packing leak on pressurizer valve.

6 L ,

26 11-11 F 18 hrs. A 3 Unit tripped due to main generator 5 min. stator cooling water temperature qj controller failure. Incrpased stator t,

cooling temperature to trip setpoint.

'y
  • LER 85-049-00 y

i} 27 11-24 S 48 hrs. B 1 Power reduced to repair leaks on h

secondary.

Tj h

l-jj """**M Y: ,

M 't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST - 2: BAAIIUAL ScaAat

- C asynsrsassr: 3: Attgees4TICscaAss ,

i D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t? E: cesaAigainassuesG AIGD 7: LaCEIEEE EXAaIIss419006

[ F: ADIABWTaAftvE

j c cetaAftoseALEamos(EEFLANG)

"'""*" CA-#804 3 05/09/84 f; Page 4 of 4 QDP-ZZ-04204 1.-;

3

g. .__ .,, ._

_. - ._ .-__-_ W :

1 o

  • '~*~

, saa

, f' .

k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i <

Technical Specifications.

S. E. Miltenberger

~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure  ;

cc: Distribution attached l

Mczng Addess: P.O. Box 620. FuMon, MO 65254 l l

J

_ .. z,

.s.

=

.s.

i

_t dintribution for ULNRC-1217

~

with enclosures.

Mr.' James G. Keppler Regional Administrator

,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III

-799 Roosevelt Road -

Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector

_____.____-____._________.a

. s-MONTHLY OPERATING REPORT DOCKET No. 50-483 UNIT NAME 6 DATE nFPFMRFR 5. 19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 -

PART A OPERATIONS

SUMMARY

NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:

1. On 11/2/85 the unit tripped due to a rod control problem and was back

~

on line the same day.

2. On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
3. On 11/11/85 the unit tripped due to a temperature- control valve failure j on Stator Cooling Water. The unit was back on line 11/12/85.

O 4. On 11/23/85 load was reduced to renair leaks in secondarv side. Unit was returned to full power 11/24/85.

- PART B PORV AND SAFETY VALVE

SUMMARY

~

NONE s

8 i