.a 8
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE 12/5/85
- ~
COMPLETED BY DAN B. PRATTE TELEPHONE (314) 676-8460 MONTH NOVDfBER 1985 o
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1125 1122 37 i
129 1116 2
3, 809 1123 3
3,.
685 1129 4
20 0
1138 3
21 0
1123 a
22 0
1092 y
23 517 1107 s
24 1095 g
1106 5
1134 1104 10 1063 1136 11 27 12 50 1138 3
1141 13 811 3
14 1108 1140 3g 15 1105 33 1123 16 8602190052 851130 i
PDR ADOCK 05000483
)
R FDR 0 [dh84 Page 2 of,4 QDP-ZZ-04204 c-
e s
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway DATg 12/5/85 DAN B. PRATTE COMPLETED BY TELEPHONg (314) 676-8460 OPERATING 8TATUS November 1985 Gross Moums IN REPORTING PERICO: 720
. REPoRTtNo PeRico:
3411 Max. DepeNO. CAPACITY tmwed.
1120
- 2. CURRENTLY AuTwoR ZED Powsm LevELiMwo:
ossicm ELsCTRICAL RATINo tMw Neo: 1171*
At stretch power level which is not a
currentiv authorized under the operating M gense.
- 3. P0wsm LEVEL TD wwiCM RESTRICTED tiP ANY) IMwe.Ned:
1
- 4. REASONS FOR RESTRICTION llP ANY1:
THIS MONTM YM TO DATE CuMuLAfivt 695 7463.8 7766.3 S. NuMetR of wouRs REACTOR was CRIT: CAL 0
0 0
- s. REACTOR RESERVE shutdown MOUR$
605.1 7208.9 7511.4 7 HOURS GENERATOR ON LINE 0
0 0
- e. unit REsERva swuToowN Hours
- 9. Gross THERMAL ENERGY GENER ATED IMwMI
.I.,940.798 22.803.430 23.804.954 to. Gross ELECTRICAL ENERoy CENeRATED IMwMI..
668.969 7.714.156 8.053.336
- 11. NET ELECTRtCAL ENERGY GENERATED IMwMI 615.1R4 7.121.780 7 Aaa.n03
- 12. REACTom SERVICE PAcrom 96.57 91.17 93.4g 96.5%
93.1%
93,4%
- 13. REACTOR AV AILAe1LITY P ACTOR.
84.1%
89.9%
90.3%
14 UNIT sERvlCE PACTOR..
84.1%
89.9%
90.3%
- 19. uN 7 AVAILA81LiTY PACTOR
- 18. uNif CAPACITY P ACTOR tuesne MOC) 78.8%
81.6%
A7.1Y 75.3%
78.0%
78.52 t7. UNIT CAPACITY PACToM tu ee o.eien Mweet.......
- 15.9%
6.1%
5.9%
ts. unit soRCao ouTAce RAf t.
1 is. sMutoowNs sCMeoutan oveR NEXT S MONTHS ITYPt. 0Af t, AN0 0uRAT60N OP EACMI:
Refuel, 2/28/85, approximately 42 days.
- 20. IP SMuf D0wN AT ENO OF REPORT PERICO, ESTIMAT80 OATE OP STARTuP:
l 1
ENNk Page 3 of 4 qap.zz.04204
D
~
x e-Y Pare E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NANE Callaway J-,
DATE 12/s/85 n
4 COMPLETED BY DAN B. PRATTE
[F REPORT MONTH NOVEMBER 1ELEPHONE (314) 676-8460 C
7,,. :
H 40ETHOD OF k
TYPE SHUTTING DOWN I
F: FOACED DURATION THE REACTOR OR
~
00 0.
DATE S: SCHEDULED 4 HOUR $8 REASON REDUCaesG POWER CORRECTIVE ACTIONS /CORAeAENTS 24 11-2 F
15 hrs.
A 3
Rod control problem caused a group of 30 min.
rods to drop and reactor trip.
LER 85-048-00 25 11-4 F
81 hrs.
A 1
Forced unit shutdown to mode 4 to repair sN 11 min.
packing leak on pressurizer valve.
6 L
26 11-11 F
18 hrs.
A 3
Unit tripped due to main generator 5 min.
stator cooling water temperature qj controller failure.
Incrpased stator t,
cooling temperature to trip setpoint.
- 'y LER 85-049-00 y
i}
27 11-24 S
48 hrs.
B 1
Power reduced to repair leaks on h
secondary.
Tj h
l-jj
"""**M Y:
M
't asascos amfuoD A: aQBartEtrF FA4 LUBE (EEfLAAI4 3: SIA8alAL-a:BRAert.ORTEST
- 2: BAAIIUAL ScaAat C asynsrsassr:
3: Attgees4TICscaAss i
D: ascam avgalt.aESTasCTeGes 4 OB W Rta W EAgat t?
E: cesaAigainassuesG AIGD 7:
LaCEIEEE EXAaIIss419006
[
F: ADIABWTaAftvE
- j c cetaAftoseALEamos(EEFLANG)
CA-#804 3
05/09/84 f;
Page 4 of 4 QDP-ZZ-04204 1.-;
3g.
W :
1 o
' ~ * ~
saa f'
k UMON BECWC COMMW coNoway Plant December 6, 1985' Director, Resource Management Nuclear Regulatory Comrnission Washington, DC 20555 ULNRC-1217
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1985 The enclosed Monthly Operating Report for November 1985 is submitted pursuant to section 6.9.1.8 of the callaway Unit i Technical Specifications.
S. E. Miltenberger
~ianager, Callaway Plant rW NfL W MET /WRC/DBP/dra Enclosure cc: Distribution attached Mczng Addess: P.O. Box 620. FuMon, MO 65254 J
z,
.s.
.s.
i
=
~
_t dintribution for ULNRC-1217 with enclosures.
Mr.' James G. Keppler Regional Administrator
,0ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III
-799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector m
t.
.a
s-MONTHLY OPERATING REPORT DOCKET No.
50-483 UNIT NAME 6 DATE nFPFMRFR 5.
19R5 COMPLsTsu BI nAv n pnATTF TELEPHONE (314) ~676-8460 PART A OPERATIONS
SUMMARY
NOVEMBER 1985 The unit was operated at full power for the month of November with the following exceptions:
1.
On 11/2/85 the unit tripped due to a rod control problem and was back
~
on line the same day.
2.
On 11/4/85 the unit was shut down to mode 4 to repair a valve packing leak on the pressurizer. The unit was back on line 11/6/63.
3.
On 11/11/85 the unit tripped due to a temperature-control valve failure j
on Stator Cooling Water. The unit was back on line 11/12/85.
O 4.
On 11/23/85 load was reduced to renair leaks in secondarv side.
Unit was returned to full power 11/24/85.
PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE s
8 i