ML20134D469

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept 50-285/85-15 on 850701-0831 & Forwards Notice of Violation
ML20134D469
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/12/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20134D471 List:
References
NUDOCS 8508190235
Download: ML20134D469 (2)


See also: IR 05000285/1985015

Text

AUG 121985

'

In Reply Refer To:

Docket:

50-285/85-15

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection being conducted by L. A. Yandell of this office

during the period July 1-August 31, 1985, of activities authorized by NRC

Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our

findings with a member of your staff.

Areas examined during the inspection included design changes and drawing

control.

Within these areas, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the inspector.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's ." Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Details of this inspection will be included in a report to be issued in the

near future and identified as NRC Inspection Paport 50-285/85-15.

,

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

orig'nd Sirr.ed By

E. H. Jchnren

E. H. Johnson, Chief

Reactor Project Branch

Enclosure:

Appendix A - Notice of Violation

cc w/ enclosure:

(cont, on next page)

RIV: SRI /F -

RPB/B,

RPB

hAYandell:cs'

LEMaFlin

EHJohnson

f/[,/85

g////85

i g /85

~ /J.[

7

8508190235 850812

PDR

ADOCK 05000285

PDR

't

G

m

. :-

.,

'

Omaha Public Power District

-2-

W..G. Gates, Manager

-Fort Calhoun Station

P.O. Box 399

Fort 'Calhoun, Nebraska 68023

L

. Harry H. _ Voigt, Esq..

.

^

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

RPB

R. Denise, DRSP

EP&RPB

R. D. Martin, RA

RIV File

MIS System

Resident Inspector

RSTS Operator

L. E. Martin, RPB/B

D. Weiss, LFMB (AR-2015)

D..A. Powers, EO

.