Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/96-03
ML20129G242
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/30/1996
From: Ruland W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum M
NORTHEAST UTILITIES SERVICE CO.
Shared Package
ML20129G248 List:
References
NUDOCS 9610070139
Download: ML20129G242 (3)


See also: IR 05000443/1996003

Text

,

o =

_

September 30, 1996

..

Mr. Ted C. Feigenbaum

Executive Vice President and Chief Nuclear Officer

Northeast Utilities Service Company

c/o Mr. Terry L. Harpster

P.O. Box 270

Hartford, CT 06141-0270

SUBJECT: NRC INSPECTION REPORT NO. 50-443/96-03 (REPLY)

Dear Mr. Feigenbaum:

This refers to your July 12,1996, correspondence in response to our letter, dated

June 14,1996, regarding Seabrook Station. This correspondence dealt with fire protection

program issues including two violations of NRC requirements. We have reviewed this

matter in accordance with NRC Inspection Manual Procedure 92702.

Thank you for informing us of the corrective and preventive actions documented in your

letter. Your actions to improve staff awareness of fire program requirements and

management expectations appear proper for improving the effectiveness of the program.

In addition, your planned actions to clarify procedures, revise the fire protection program, i

and provide subsequent training on any program changes appear complete.

We consider these actions acceptable pending further review in a future inspection of your

licensed program.

We appreciate your cooperation.

Sincerely,

William H. Rutand, Chief

Electrical Engineering Branch

Division of Reactor Safety

Docket No. 50-443

$f0i

-

I

07000g

^

9610070139 960930

PDR ADOCK 05000443

G PDR

E

. .

..

.

Mr. Ted C. Feigenbaum 2

cc:

B. D. Kenyon, President - Nuclear Group

D. B. Miller Jr., Senior Vice President - Nuclear Safety and Oversight

E. A. DeBarba, Vice President - Nuclear Technical Services

F. C. Rothen, Vice President - Nuclear Work Services

S. E. Scace, Vice President - Nuclear Reengineering implementation

W. DiProfio, Nuclear Unit Director - Seabrook Station

L. M.' Cuoco, Senior Nuclear Counsel

A. M. Callendrello, Licensing Manager - Seabrook Station

H. F. Haynes, Director - Nuclear Training

R. E. Hickok, Nuclear Training Manager - Seabrook Station

W. D. Meinert, Nuclear Engineer

i

D. C. McElhinney, RAC Chairman, FEMA RI, Boston, Mass, i

R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire j

S. Choi, Director, Nuclear Safety, Massachusetts Emergency

Management Agency

)

,

F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power

Corporation

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

Commonwealth of Massachusetts, SLO Designee

Seacoast Anti-Pollution League

State of New Hamr) shire, SLO

D. Tefft, Administrgtor, Bureau of Radiological Health, State of New Hampshire

S. Comley, Executive Director, We the People of the United States

,

,

I

a

!

)

1

__ , ___ ___

l 7

'

.

.

Mr. Ted C. Feigenbaum 3

Distribution:

Region I Docket Room (with concurrences)

D. Screncl, PAO (1)

J. Rogge, DRP

NRC Resident inspector

E. Conner, DRP

D. Bearde, DRP

Nuclear Safety Information Center (NSIC)

PUBLIC ,

W. Dean, OEDO '

P. McKee, PD l-3, NRR

A. DeAgazio, PD l-3, NRR

R. Correia, NRR (RPC)

R. Frahm, Jr., NRR (RKF) l

Inspection Program Branch, NRR (IPAS)

DRS File (1)  !

DOCUMENT NAME: A: SEA 9603. REP

Te receive a copy or this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

0FFICE Rl/DRS lE Rl/DRS l& Rl/ l RI/ l RI/ l

NAME LHarrison (AL. WRuland alXVL

DATE 09/26/96 09h - /96 09/ /96 09/ /96 09/ /96

0FFICIAL RECORD COPY

l