lLLINDIS POWER 00MPANY 0982-L CLINTON POWER STATION. P.O. box 678. CLINTON, ILLINOIS 61727 l
January 26, 1984 Docket 50-461 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Construction Status Report (NUREG-0030)
Reference:
-USNRC letter dated 10/30/81, R. A. Hartfield to L. J. Koch, Illinois Power Company
Dear Mr. Hartfield:
The referenced letter requested Illinois Power Company to provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station.
Enclosed is an updated copy of the June 30, 1982' report indicating the status as of December 31, 1983.
Please note that the-last Construction Status Report we received was for the period ending June 30, 1982.
As of December 31, 1983, construction of Unit I is estimated at 82.6% complete, with the target date for fuel load remaining at January 3, 1986.
S erel
- yours, P. Hall Vice President Enclosure RPR/jt cc:
NRC Resident Office 8504150172 840606 PDR FOIA KILLEFE84-367 PDR
PACEgeg8ga C0N$TRUCTION 5TATUS REPORT CLINTON l NUCLEAR POWER PLANTS STATUS AS OF M S2-PLANT CNARACTERISTICSt KEY PERS0NNELa DOCKET NO:
85800461 CORPORATE CONTACT:
W. C. GERSTNER, EXEC VICE PRESIDENT CP HD. 8 DATE ISSUED: CPPR-837/ 82-24-76 CORPORATE ADDRESS:
500 SOUTH 277N STREET CP IXPIRATION DATE:
DECATUR, ILLINDIS 62525 APPLICANT:
ILLINDIS POWER PLANT LOCATION:
6 it! E OF CLINTON, ILL CORPORATE PHONE NO:
(217) 937-1111 EXT. 28t1 t
IE REGION:
3 AE SARGENT 8 LUNDY H555:
GENERAL ELECTRIC 46.-W4bb5A44 G, HaMiaon CONSTRUCTOR:
BALDWIN ASSOCIATES NRC LPM:
IE PROJECT INSPECTOR:
N. M. WESCOTT REACTOR TYPE:
N. LIVERtt0RE DER (t1WE):
0958 FUEL L0AD DATE CNANGES IH$PECTION STATUS:
TIME PERIOD AS REPORTED 8Y UTILITY
. Aar. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT SES DATE END DATE DATE SCHEDULE REPORTED BY UTILITY KRE OF INSP.
OF INSL 05-09-77 84-08-81 REEVALUATION OF CONSTRUCTION SCHEDULE.
8115 06-02-81 02-05-82 06-23-78 84-00-82 TIME.0ST DUE TO SEVERE WEATHER 8204 02-16-82 03-38-82 CONDITIONS.
8206 04-28-82 04-38-82 01-21-81 81-80-83 REEVALUATION OF CONSTRUCTIwN SCHEDULE.
8287 85-87-82 85-23-82 94-29-82 99-03-84 REEVALUATION OF CONSTRUCTION SCHEDULE.
82es os-et-82 e6-se-82 05-24-83 01-03-86 Reevaluation of Const>tuction SCbEdMIC.
Inspection Reports are available at local PDRs.
1 Status.to be provided by.the NRC
/
L0 CAL PUBLIC D0CUMENT R00M
~
VESPASIAM WARMER PUBLIC LIBRARY IPO WEST J011NSOH SIREET CL IH10tl, ILLIHOIS 61727 i
C0N5iRUCT ION 5iATUS REPORT PAGE Not 0
C L ItiT ON 1 MUCLEAR POWER PLANT 5 STATUS A5 0Ft 14-34-8?
CDN 5YRUCiION 5TATUSt
++-4s-a+ Ql 03-840ErINED IN CPt03-86 APPLICANTS CONSTRUCTION C l
tPPL TC AMI'5 ruRRFMT ESTIMATED FUEL LOADING DATEt
-t+-i s-s > u l -
(EARLIEST) 13-81-30 ATPIICANT'S PRtVIOUS ESTIMATED FUEL LGADING DATEt Arf I I(. AHi'S ESIIt:1.f ED T UEL L O ADII;G DAT E Al CP ISSUANCE 16-00-80 (LATEST) de-e +-es-10-01-84 11-01-86 AFPLICAt:I'S CURRLili ESTIMAT ED C0tW1ERCI AL OPERAT ION DATE trasT1:57 i
CURRENT ESTIMAff.D PERC[NT CONSTRilCTION COMPLETE: 342 #2,6%
fnMMTNf5 RECARDING CtfRREf4T CONSTRUCTIDH STATU$t I
I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTTMATED
,_51ARl, SlART COMPLETION
[QM_PJ{1103 3,_10MPLEiE 10-06;75 03-86-76 100:
M9BTLT2E AND PREPARE SITE 02-25-76 e t-et 85-08-05-83 inex I'L ACE STRUCTURAL CONCRETE 10-06-79 10-15-79 100x IN'afall REACTOR PRES 5URE VESSEL 05-01-76 47-t91s-12-01-84 4,=
.9 9,41
' INSTALL LARGE BORE PROCF.55 PIPE INSTALL LARGE SORE PIPC NANCCRS. RESTRAINTS AND SNUBBER 58 05-01-76 98-tsgs--02-01-8 5
- st-93,51
. INSTALL SMALL BCRE PIPE 06-08-77 e,-et es- 04-01-85
-,52-94,21 06-01-78 88-64 4 5- 04-01--84
-952-95.8%
INSTALL CABLE TRAY:
h INSTALL EXPOSED METAL CONDUIT 96-st-78 42-2945-10-0.1-85
$3x-77.5%
INSTALL POMER. CONTROL. INSTRUMENTATION AND SECURITY CABLE 8 82-!2-79 46 4 5 10-01-85
-54=-
56.61 INST ALL ELECTRICAL TERMIllATIONS 04-01-88 4 9-t t-es- ! !-01 -85
.+et-48.2%
I CONDUCT RFACTOR COLD NYDROSTATIC TESTt 25 43 01-06-85 e+-*>-es- 02-08-8 5 ex I
Cot: DUCT NOT FUNCTI0tlAL TEST 8 N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TEST 5 NECESSARY FOR FUEL LOAD 8 03-06-81 i t-re-95-- I 2-I 9-8 5
-,2-4.7%
1 I
4
PAGE r
-e N
COOSTRUCT100 STATUS REPOOT STATUS AS OFs -8&a34,82 NUCLEAR POWER P L A N T.S CLINTON 2 KEY P E R S 0 N N E L8 PLANT CMARAC7ERI57ICSt CORPORATE CONTACT:
W. C. GER$1MER, EXEC VICE PRESIDENT DOCRET NO:
85808442 CP No. 8 DATE ISSUED: CPPR-134/ 02-24-76 CORPORATE ADDRESS:
500 SOUTH 27TH STREET CP EXPIRATION DATE:
DECATUR, ILLINOIS 62525 APPLICANT:
ILLINOIS POWER PLANT LOCATION:
6 MI E OF CLINTON, ILL CORPORATE PHONE NO:
(217) 937-1111 EXT. 2811 IE REGION:
3 AE8 SARGENT S LUNDY NS$$t GENERAL ELECTRIC NRC LPM:
N,.443413AIBS G, H ygjgi,g o n CONSTRUCTOR 8 BALDWIN A550CIATES IE PROJECT INSPEC10Rt M. M. WESCOTT REACTOR TYPE 8 SWR IE RESIDENT INSPECT 0Rt H. LIVERrt0RE DER (MWE):
8958 FUEL L0AD DATE CHANGES IN5PECTION STATUSs A5 REPORTED 8Y UTILITY TIME PERIOD Aar. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANCE REPORT BEG DATE END DATE DATE SQiLIWLE REPORTED BY UTILITY
' NUMBER OF INSP.
OF INSP.
93-24-77 18-80-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY OVER FEDERAL MUCLEAR GENERATION AND FUEL POLICIES.
11-29-89 N/S REDUCED LOAD GROWTN RATE.
10-14-85 CanceH ed Reduced Load Growth Rate.
l L0 CAL PUBLIC D0CUMENT R00M VESPASIAN WARMER PUBLIC LIBRARY 128 WEST JONHSON STREET CLINTON, ILLINCIS 61727
....,....~.= =::_.
... :. :. _2 g
C0N5TRUCTION 5TATUS REP 0RT PAGE NO: 2-831 CLINTON 2 NUCLEAR PONER PLANTS STATUS AS OF:
F il C0N5TRUCTION S T A T U St APPLICANT'S CURRENT ESTIMATED FUEL L0491084 D' ATE:
N/S APPLICANTS CONSTRUCTION COMPLETIOtt ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATER 13-33-87 DEFINED IN CP (EARLIEST) 10-08-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-08-83 (LATEST) 10-01-85 l
APPLICANT'S CURRENT ESTIMATED COMrtERCIAL OPERATION DATES-N/S CURRENT ESTIMATES PERCENT CONSTRUCTION COMPLETE:
It has been cancelled.
COFWttetTS RESARDINO CURRENT CONSTRUCTION STATIS: U011T 2 40 elf 44UOHON-9EMARf0-HIDEMMVEt9.--
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START
$14RL gg]PE1Lf3 gg1P_L g1Jgjg LCitt*PJJlg Met!LI2E AND PREPARE SITE:
to-e6 7-S es-16-76 sees PLACE STRUCTURAL C000 CRETE:
l
{
4 INS 1ALL REACitt PRESSURE VESSEL:
i INSTALL LARGE BORE PROCESS PIPE 8 INSTALL LARGE BORE PIPE NAfl4ERS. RESTRAINTS AND SNUSSERSs INSTALL SMALL BORE PIPE:
e INSTALL CABLE 1 RAY
[
INSTALL EXPOSED METAL.CONOWIT INSTALL POWER.C00lTROL.INSTRUMENTATI001 AISS SECURITY CABLE:
t INSTALL ELECTRICAL TERMINATIONSt i
CONDUCT REACTOR COLD NY3ROSTATIC TEST:
i C00lOUCT NOT FUttCT10NAL TEST
- I j
COMBUCT PRESP ANS ACCEPTANCE TESTS MECESSARY FOR FUEL LOAD:
i x
i
.