Responds to GL 96-01, Testing of SR Logic Circuits
ML20107H511
Person / Time
Site: Oyster Creek
Issue date: 04/18/1996
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6730-96-2112, GL-96-01, GL-96-1, NUDOCS 9604240147
Download: ML20107H511 (2)


Text

4 GPU Nuclear Corporation Nuclear

":'sn:r388 j

t Forked River New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

April 18, 1996 6730-96-2112 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Facility Operating License No. DPR-16 Response to Generic Letter 96-01: Testing of Safety-Related Logic Circuits in accordance with the initial response requirements of NRC Generic Letter (GL) 96-01,

" Testing of Safety-Related Logic Circuits", dated January 10, 1996, the following information is provided:

GPU Nuclear will review and compare OCNGS clectrical schematic drawings and logic diagrams for those portions of the reactor protection system, emergency diesel generator load shedding and sequencing, and actuation logic for engineered safety features systems required for design basis accident mitigation against the OCNGS Technical Specification surveillance procedures. The purpose of this review is to ensure that all applicable portions of the logic circuitry are adequately covered in the surveillance procedures to fulfill Technical Specification requirements. Surveillance procedure inadequacies identified as part of this review, if any, will be addressed as necessary by surveillance procedure revision or request for technical specification amendment where justified.

240032 b(

9604240147 960418 O

PDR ADOCK 05000219 P

PDR

\\ h GPU Nuclear Corporation is a subsidiary of General Pubhc Utilities Corporation

~

6730: % 21,12 Page 2 4

M 4

The above actions will be completed prior to startup from the 17R outage which is the first refueling outage commencing one year after the issuance of GL E01. GPU Nuclear will confirm completion of these actions at that time. This schedule is consistent with the Generic Letter 96 01 request. If any additional information is needed, please contact Mr.

David J. Distel, Senior Regulatory Affairs Engineer at (201) 316-7955.

Sincerely, 1

h M. B. Roche Vice President and Director, MBR\\DJD\\ pip Oyster Creek c:

Administrator, Region 1 J

Oyster Creek NRC Resident inspector Oyster Creek NRC Senior Project Manager 4