ML20085A172
| ML20085A172 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/30/1991 |
| From: | Zwolinski J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20085A175 | List: |
| References | |
| NUDOCS 9106060218 | |
| Download: ML20085A172 (3) | |
Text
...
~_
p%
iw y
'n UNITED STATES k (()$sf f 2
Ji NUCLEAR REGULATORY COMMISSION wnmNatoN. e c..ws
% +....e ILLIN0IS POWER COMPANY. ET Al..
DOCKET NO. 50-461 CLINTON POWER STATION, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No, t License No. NPF-62 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Illinois Power Company * (IP), and Soyland Power Cooperative, Inc. (the licensees) dated May 15, 1991, as supplemented by letter dated May 22 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth "
'.0 CPR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be icimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
- lllinois Power Company is authorized to act as agent for Soyland Power Cooperative, Inc. and has exclusive responsibility and control over the physical cons 3 iction, operation and maintenance of the facility.
910606021s 910530 PDR ADDCK 05000461 P
~
.a
2 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 0, as revised through Amendment No. 58, are hereby incorporated into this
- license, Illinois Powee Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
i 3.
This license amendment is effective as of the date of issuance and is to be implemented no later than 30 days from date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
, Yin / 'l),w) 5 l a alort l o' John A. Zwolinski, Assistant Director for Region 111 Reactors Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications l
Date of issuance: May 30, 1991 l
i
(
l-l l
l l
. - ~. _ _. _ - _ _ _ _..... _ _ _ _.. _ _.. _ _ _... _ _, _ _ _ _.., _, _, _ _
4 ATTACHMENT TO LICENSE AMENDMENT NO. 58 FACit1TYOPERATINGL101NSENO.NPF62 1
DOCKET NO. 50-461, Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.
The revised pages are identified by amendirent number and contain vertical lines indicating the area of change, The corresponding overleaf pages are provided to maintain document completeness.
Remove Insert 3/4 3-88 3/4 3-88 3/4 3-88a l
l l
l P
9 l
I i
...