ML20084F155

From kanterella
Jump to navigation Jump to search
Ack Receipt of NRC Ltr Re Leaks at Facility.Question When Repairs Will Be Made Unanswered
ML20084F155
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/03/1976
From: Shipe E
AFFILIATION NOT ASSIGNED
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20084F146 List:
References
NUDOCS 8304200608
Download: ML20084F155 (1)


Text

<

t ' r

, t.dward A."Shipe .

i zim 123 Crchard Ridho Lane

  • E8 Poca Raton, Fla. 33431 gg May 3,1976 no
  • @ 'illiam J. Dircks l gy .lsst. Executivo Director for Operations i om Nuclear Regulatory Commission 88 Cachington, D.C. 20555 IOE mo$

Dear Mr. Dircks:

Thank you very much for responding to my letter on leaks at the Nuclear- facility on Turkey Point in Florida. I am well assured that the leakage should not harm u !

us.

Holiever, in reading your letter I still find one question unanswered. First of all, when-will the repair of weid defects in the liners be completed? And second, ,

will that end the problem?

c. l Thank you very much for your time and trouble.

Since 1 urs,

-:dward A. Shipe

  • ggg l

1 e

t i

W