Text
_.
1-EEEEllEEEE Log # TXX 95135 MM File # 10010-916 (TRM)
[EF, 153 Ref. # 10CFR50.36 e.
1UELECTRIC May 15, 1995 c, L-w. Twry Groep Vke Presidrat.Nariver U. S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555
SUBJECT:
COMANCHE' PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 TRANSMITTAL OF TECHNICAL REQUIREMENTS MANUAL (TRM)
REVISION 19 i
Gentlemen:
TV Electric herewith submits Revision 19 (enclosed) of the CPSES Technical-Requirements Manual (TRM). Enclosed are the following documents:
Technical Requirements Manual 1 signed original j
Revision 19 and 10 copies The attachment contains a page by page description of the changes. As has been the TU Electric practice in the past several TRM revisions, all changes described in the attachment have been evaluated for relative significance (i.e., the group number 1. 2, 3, or 4 corresponds to each change justification as discussed in TV Electric letter TXX 88467 dated June 1, 1988).
In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TU Electric 10CFR50.59 process and found not to include any "unreviewed safety questions".
]
TRM Revision 19. dated May 15, 1995, will become effective at 12:01 AM CST on May 17, 1995.
s 9505250077.950515 PDR ADOCK 0S000445 P
PENT ewgy ma 1601 aryan so : Dallas. Texas 75201 3411
79-
- i TXX 95135
'Page 2 of 2 1
If you should 'have any questions, please contact Mr. Carl B. Corbin at 1
(214) 812 8859.
i t'
Sincerely, C. L. Terry
-l
)
8/
By:
Roger 3. Walker Regulatory Affairs Manager CBC/cbc Attachment Enclosure cc:
Mr. L. J. Callan, Region IV Hr. D. F. Kirsch, Region IV Mr. T. J. Polich,-NRR Resident Inspectors 1
t
4
' Attachment to TXX-95135 May 15, 1995 Page 1 of 1 CPSES - TECHNICAL REQUIREMENTS MANUAL (TRM)
AMENDMENT / REVISION 19 DETAILED DESCRIPTION TR Page (as amended)
Group Description 1-3 4
Updates Table 1.1.1 " Reactor Trip System Instrumentation Trip Response Times," by deleting the reference to Power Range, Neutron Flux High Negative Rate and replacing with the phrase "Not used".
Update This change makes the TRM Table consistent with License Amendment Request 94-013 which has been approved by the NRC and will become effective on May.
17, 1995.
By removing the "High Negative Neutron Flux Rate" reactor trip function from the Reactor 3
Trip System, the potential for inadvertent plant trips can be reduced with no impact on plant safety.
Change Request Number
- TR-94-5.1 Commitment Register Number a Related SER : 7.2 SSER :22 7.2 SER/SSER Impact
- No
i I
i 1
d a
l l
1 s
1 i
I j
'l i
1 ENCLOSURE TO TXX 95135 i
1 j
i t
i I
i 8.
h n
I s,
4 d
I t
1 l
i l
I i
h 1
1 i
J
.,_m-,...
c
.4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page 1 of 1)
The following instructional information and checklist is being furnished to 4
help insert Revision 19 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in TXX-95135, dated May.5, 1995.
Discard the old sheets and insert the new sheets, as listed below.
Remove-Insert c
Section 1 1-3 1-3 List of Effective Paaes EPL-1 through EPL-4 EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revision 19 on the " Record of Changes" form located at the beginning of.the TRM.
J
?
l May 15, 1995 u
,o
~
(
TECHNICAL REOUIREMENT 1.1
~
Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME 1.
Manual Reactor Trip N.A.
2.
Power Range, Neutron Flux 5 0.5 second*
3.
Power Range, Neutron Flux High Positive Rate N.A.
19 4.
Not Used 1
5.
Intermediate Range, Neutron Flux N.A.
6.
Source Range, Neutron Flux s 0.5 second*
7.
Overtemperature N-16 5 7 seconds *#
8.
Overpower N-16 5 7 seconds *#
9.
Pressurizer Pressure-Low 5 2 seconds
- 10. Pressurizer Pressure-High 5 2 seconds
- 11. Pressurizer Water Level-High N.A.
- Neutron /ganma detectors are exempt from response time testing.
Response time-of the neutron / gamma flux signal portion of the channel shall be measured from detector output or input of first electronic component in a channel.
- Response. time includes the thermal well response time.
n j-l l
COMANCHE PEAK - UNITS 1 AND 2 1-3 Revision 19 May 15, 1995
- l
.\\
F
~ ' '
COMANCHE PEAK STEAM' ELECTRIC STATION UNITS l'& 2 1
TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING I
BELOW IS A, LEGEND FOR THE EFFECTIVE PAGE LISTING:
i Original Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15. 1990 Revision 3 July 20, 1990 Revision 4 April 24, 1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 i
Revision 10 January 22, 1993 Revision-11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 i
Revision 14 November 30, 1993 Revision 15 April 15, 1994 Revision 16 May 11, 1994 Revision 17 February 24, 1995' Revision 18 April 14, 1995 Revision 19 May 15, 1995 a
e 4
[
p j
i I
EPL-1 May 15, 1995 i
r. - -..,. -., - -
-y..,
,-,..v
.,e
+,
-. ~. -.. -
'l.j J
j
' COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2-TECHNICAL. REQijlREMENTS ' MANUAL ' (TRM)
EFFECTIVE PAGE LISTING TRM-Tab Original Record of Changes February 24, 1995 TRM-Title Page June 30, 1992 Table of Contents-Tab Original 1-February 24, 1995 Administrative Controis-Tab Original Administrative Controis-Title Page June 30, 1992 0-1 Revision 12 0-2 January 22, 1993 0-3 December 18, 1992 0-4 June 30, 1992 0-5 January 22, 1993 0-6 January 22, 1993 0-7 January'22, 1993 0-8 January 22, 1993 0-9 Revision 18 0-10 January 22, 1993 0-11 January 22, 1993 0-12 June 30, 1992 0-13 June 30, 1992 0-14 July 15, 1993 0-15 July 15, 1993 0-16 January 22, 1993 0-17 January 22, 1993 0-18 Revision 12 0-19 Revision 8 0-20 July 15, 1993 0-21 July 15, 1993 0-22 Revision 8 0-23 Revision 8 0-24' Revision 8 0-25 July 15, 1993' 0-26 January 22, 1993-Technical Requirements-Tab Original Section 1-Tab Original 1-1 June 30, 1992 1-2 Revision 12-1-3 Revision 19 1-4 July 15, 1993 1-5 June 30,.1992 1-6' Revision 12 1-7 July 15, 1993 1-8 July 15, 1993 1-9 July 15, 1993 1-10
. July 15, 1993 1-11 July 15, 1993 1-12 July 15, 1993 EPL-2 May 15, 1995 l
k COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1'& 2
~ TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING 1-13 July 15, 1993 1-14 July 15, 1993 1-15 Revision 12 1-16 June.30, 1992 1-17 Revision 12 1-18 July 15, 1993 1-19 July 15, 1993 1-20 July 15, 1993 1-21 July 15, 1993 1 Revision 12 Sec. 2-Tab Original' 2-1 June 30, 1992 2-2 Revision 12 3 July 15, 1993 2-4 January 22, 1993 2-5 Revision 8 2-6 Revision 8 2-7 Revision 8' 2-8
' January 22, 1993 2-9 Revision 8 2-10 January 22, 1993 2-11 Revision 8 2-12 Revision.9' 2-13 Revision 8 2-14 July 15, 1993 2-15 Revision 8-2-16 July 15, 1993 2-17 Revision 8 2-18 Revision 8 2-19 January 22, 1993 2-20 January 22, 1993 2-21 Revision 8 2-22 Revision 8 2-23 Revision 8 2-24 Revision 8 2-25 Revision 12 2-26 January 22, 1993 2-27 Revision 14 2-28 July 15, 1993 2-29 Revision 17 2-30 Revision 17
- 2-31 Revision 17 2-32 Revision 17 2-33 Revision 17-Sec. 3-Tab Original i
3-1 June 30, 1992 3-2 Revision.12 EPL-3 May 15, 1995
n '..
- ~
o 50MANCHEPEAKSTEAMELECTRICSTATIONUNITS1.&2 TECHNICAL REQUIREMENTS MANUAL-(TRM)
EFFECTIVE PAGE LISTING 3-3 Revision 12 3-4 July 15, 1993 3-5 July 15, 1993-3-6 July 15, 1993 3-7 June 30, 1992 3-8 July 15, 19931 3-9 June 30, 1992 3-10 Revision 11 3-11
' Revision 11 Sec. 4-Tab Original 4-1 Revision 15 4-2 Revision 12 4-3 July 15, 1993 4-4 July 15, 1993 4-5 Revision 15 4-6 Revision 15 4-7 Revision 8 4-8 Revision 13 e
4-9 Revision 13 4-10 Revision 13 4-11 Revision.15 4-12 Revision 15 4-13 Revision 13 4-14 Revision 13 4-15 Revision 8 4-16 Revision 12 4-17 Revision 10 4-18 Revision 15 4-19 Revision 15 4-20 Revision 8 4-21 Revision 16 4-22 Revision 16 4-23 Revision 16 4-24 Revision 16 4-25 May 11, 1994 4-26 Revision 15 4-27 Revision 16 28 Revision 16 l
4-29 May 11, 1994 4-30 May 11, 1994 4-31 May 11, 1994 4-32 May 11, 1994 EPL-Tab Original EPL-1 May 15, 1995 t
EPL-2 May 15, 1995 EPL-3 May 15, 1995 EPL-4 May 15, 1995 EPL-4 May 15, 1995-r n
.