Text
,_
Peach Rottom Atomic Powsr Station
.+
g
~
PECO ENERGY
@, r?;"-
Delta. PA 17314 3139 717 4 % 7014 January II,1995 Docket Nos.
50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
1994 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station Gentlemen:
This represents the 1994 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station (PBAPS) as required by the TMI Action Plan, item II. K.3, and by PBAPS Technical Specifications, Paragraph 6.9.1.C: During 1994 there were no automatic actuations of the Main Steam Safety or Relief Valves in response to high reactor pressure.
i If you have any questions regarding this matter, please call.
Sincerely, er Rai 1
Vice President
[
GRR/8WK:dec cc:
R.A. Burricelli, Public Service Electric & Gas i
R.R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1. USNRC W.L Schmidt, USNRC Senior Resident inspector H.C. Schwemm Atlantic Electric A.S. Kirby, Delmarva Power INPO Record Center CCN 95-14001 1
9501170209 941231 l
PDR ADOCK 05000277 R.-
_..._..PDR 1
g 0l