Responds to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers. Attachment Confirms Completion of Commitments
ML20073S377
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/19/1994
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-94-00078, GNRO-94-78, IEB-93-002, IEB-93-2, NUDOCS 9406020300
Download: ML20073S377 (5)


Text

.e Entergy Operationo,Inc.

~'

ENTERGY ro sox 7se Ftrt G,bson, MS 39150 Td 601437 2800

=

C. R. Hutchinson May 19, 1994

$[27" am<a caren sww i

U.S.

Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Response to NRC Bulletin 93-02 Supplement 1 GNRO-94/00078 i

i Gentlemen:

The Grand Gulf Nuclear Station (GGNS) response.to NRC Bulletin (NRCB) 93-02 Supplement 1,

" Debris Plugging of Emergency Core Cooling Suction Strainers", contains three commitments related to the interim corrective actions requested by the bulletin.

The attachment confirms the completion of these commitments.

This information is being submitted under oath and affirmation in accordance with 10CFR50.54(f). Please contact Brian Blanche at 601-437-6475 should you have any questions or require additional information regarding this matter.

Yours t uly, p[

,g -

/#

CRH/BJB/bjb attachment: Confirmation of Commitments.in Response to NRC Bulletin 93-02_ Supplement 1 cc:

(See Next Page) i 9406020300 940519 PDR ADOCK 05000416 D.

PDR

l May 19, 1994 GNRO-94/00078 P, age 2 of 3 1

l cc:

Mr.

R.

H. Bernhard (w/a)

Mr. H.

W. Keiser (w/a)

Mr. R.

B. McGehee (w/a)

Mr.

N.

S.

Reynolds (w/a)

Mr. H. L. Thomas (w/c)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator l

U.S.

Nuclear Regulatory Commission i

Region II I

101 Marietta St.,

N.W.,

Suite 2900 Atlanta, Georgia 30323 Mr.

P.

W.

O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation j

U.S.

Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 1

t

m..

l j to GNRO-94/00078 1

i 4

1 4

4 4

l d

V 1

s 1

1 1

J 1

e 1

4 i

i I

i 1

httachment 1 4

J j

Confirmation of-Commitments in Response to NRC Bulletin 93-02 i

supplement 1 i

4 i

i 4

4 1

a k

i 4

2 d

a' l

4 4

I i

,r-ww,.

r

~ -.,

-=4 r..

w

-4,,-

-mw m-rwa

l BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION

[

w LICENSE NO. NPF-29 DOCKET NO. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.

and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.

l l

AFFIRMATION i

I, C.

R.

Hutchinson, being duly sworn, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that l

on behalf of Entergy Operations, Inc., System Energy j

Resources, Inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this l

response to NRC Bulletin 93-02, Supplement 1 for the Grand Gulf Nuclear Station; that I signed this response as Vice President, Operations GGNS of Entergy Operations, Inc.; and that the statements made and the matters set forth therein are true and correct to the best of my knowleqge, information l

and belief.

._ //

).

.n ip w C.' 'R. Hutdhinson STATE OF MISSISSIPPI COUNTY OF WARREN SUBSCRIBED AND SWORN TO before me, a Notary Public, in and p3the County and State above named, this /9 48 day of fj/ /dL1

/

1994.

( EAL)

Ana, hbuu

/

Notary Public

$Y:d,3N.@gnyypiygs:

l N,$M$$$5SnsO l

.... ~...

i

,- to.GNRO-94/00078 l

Page 2 of 2 I

NRC Bulletin 93-02 Supplement 1 contained three. Requested Actions to be performed within 90 days of the date of the bulletin.

Requested Action 2 was addressed in the GGNS response dated April 19, 1994, along with the GGNS action plan for Requested Actions 1 and 3.

The following paragraphs provide the GGNS response to Requested Actions 1 and 3.

All three Requested Actions have been completed.

Requested Action 1 Provide training and briefings to apprise operators and other appropriate emergency response personnel of the information contained herein and in the referenced information notices regarding the potential for suppression pool strainer clogging.

GGNS Response Training has been completed for Operations Department licensed, non-licensed, and radwaste personnel.

Training has also been completed for appropriate Emergency Response personnel holding the positions of Off-Site Emergency Coordinctor, Off-Site Emergency Coordinator Technical Assistant, Emergency Director, and l

Technical Support Center Coordinators.

l l

Requested Action 3 I

(

Institute procedures and other measures to provide l

compensatory actions to prevent, delay, or mitigate a loss of I

available NPSH margin under LOCA conditions.

Such measures should be consistent with providing the design basis emergency system functions for core and containment cooling.

1 GGNS Response In addition to the actions taken as described in the j

GGNS response dated April 19, 1994, procedural guidance has been provided governing the control of work-on plant I

equipment and housekeeping to alert plant personnel of the potential hazards which exist when working inside containment with material that could potentially clog the ECCS suction strainers.

Also, procedures have been issued providing a method to backwash the suction strainers under LOCA conditions for the Residual Heat Removal System and for the Low Pressure Core Spray System.