... _
Cers.lj R. RIinsy
' CCN 94-14088-Vice President "1
4 Peach Bottom Atomic Power Station
]
=
s PECO ENERGY re= c~ ce--
i RD 1, Box 208 4
' Delta, PA 17314-9739 2
717 456 7014
]a da 3
May 27,1994 b
i U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
SUBJECT:
Peach Bottom Atomic Power Station Units 2 and 3,1993 Annual d
Padiological Environmental Operating Report, Report No. 51 j
i Gentlemen:
3 b
Attached is the 1993 Annual Radiological Environmental Operating Report No.
g 51, for the Peach Bottom Atomic Power Station for the period January 1, 1993 through December 31,1993. This report is submitted in compliance
}
with Appendix A of the Peach Bottom Atomic Power Station Operating -
g q
License, Section 6.9.2.
g a
The Radiological Environmental Monitoring Program found that Peach Bottorn's j
offects on the environment were not measurable in any sample media except 7
fora small amount of Co-60 activity in two sediment samples.- Trace 2
concentrations of Cs-137 were found in the sediment consistent with levels observed in previous years.
The 1993 Radiological Environmental Monitoring Program confirmed that the ensironmental effects from radicactive releases were well below Peach Bottom l
Technical Specifications and applicable regulatory limits.
g ba Sincerely, g
4
/
2 b
GRR/GDE:aa 5
g/A. att g
Attachment cc:
Correspondence Control Desk Doctype 273 i
File: 853
/
d 3100'78
[h d
940ssios2t 940s27 PDR ADOCK 05000277
./
R PDR
,