Interim Deficiency Rept Re Item S-10 Concerning Masonry Wall Const Not Per Design Spec & FSAR Criteria.Quality Confirmation Program Will Be Expanded.Followup Rept Will Be Submitted by 830912
ML20072C399
Person / Time
Site: Zimmer
Issue date: 06/13/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0047, LOZ-83-47, NUDOCS 8306210054
Download: ML20072C399 (2)


Text

m g# :4 1N sy h

'~

THE CINCINNATI GAS & ELECTRIC COMPANY M

CINCINNATI, OHIO 4520t June 3 1 83 IDZ-8 -004 J. WILUAM S, J R SENIOR viCE PRESIDENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Comnission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator Gentlenen:

RE:

W. H. ZIFNER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM S-10, PASONRY WAIL CONSTRUCTION NOT PER DESIGN SPECIFICATION AND FSAR CRITERIA W.O. 57300, JOB E-5590, FILE NO. 956C, S-10

(

'Ihis letter constitutes an interim report concerning the subject condition initially reported to the Conmission on May 13, 1983 as a potentially reportable l

deficiency under the requirements of 10CFR50.55(e).

i The subject condition was identified in Section 2.4.2.2 of NUREG-0969,

" Report of the NRC Evaluation Team on the Quality of Construction at the Zinmer Nuclear Power Station" (April, 1983).

The potential deficiencies are; (1) unfilled collar joints, (2) discontin-uous and ud.ssing joint reinforcanents, (3) improper fire seal at top of walls.

l

'Ihe corrective action which CG&E will take to resolve this condition is expansion of the Quality Confirmation Program (QCP) to include this concern.

A subsequent letter will address the details of the QCP expansion in this area.

Scheduling and conpletion of the corrective action itens and submittal of l

the final report are indeterminate at this time due to continued scoping of the QCP Task. A follow-up report will be submitted to you by September 12, 1983.

l

$"~EE8Woi888sje JUN 1 5 1983 i o Pm L

l l

l

F-Mr. J. G. Keppler Regional Administrator June 13, 1983 IOZ-83-0047 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECIRIC COMPANY By g s>.

. WILLIAMF, JR.

SENIOR VICE PRESIDENT DJS/M41/cse f

cc: NRC Office of Inspection & Enforcement i

Washington, D.C.

20555 NRC Senior Resident Inspector ATIN:

W. F. Christianson NRC Zinmer Project Inspector Region III I

ATIN:

E. R. Schweibinz l

l l

l I

L