m g# :4 1N sy h
'~
THE CINCINNATI GAS & ELECTRIC COMPANY M
CINCINNATI, OHIO 4520t June 3 1 83 IDZ-8 -004 J. WILUAM S, J R SENIOR viCE PRESIDENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Comnission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator Gentlenen:
RE:
W. H. ZIFNER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM S-10, PASONRY WAIL CONSTRUCTION NOT PER DESIGN SPECIFICATION AND FSAR CRITERIA W.O. 57300, JOB E-5590, FILE NO. 956C, S-10
(
'Ihis letter constitutes an interim report concerning the subject condition initially reported to the Conmission on May 13, 1983 as a potentially reportable l
deficiency under the requirements of 10CFR50.55(e).
i The subject condition was identified in Section 2.4.2.2 of NUREG-0969,
" Report of the NRC Evaluation Team on the Quality of Construction at the Zinmer Nuclear Power Station" (April, 1983).
The potential deficiencies are; (1) unfilled collar joints, (2) discontin-uous and ud.ssing joint reinforcanents, (3) improper fire seal at top of walls.
l
'Ihe corrective action which CG&E will take to resolve this condition is expansion of the Quality Confirmation Program (QCP) to include this concern.
A subsequent letter will address the details of the QCP expansion in this area.
Scheduling and conpletion of the corrective action itens and submittal of l
the final report are indeterminate at this time due to continued scoping of the QCP Task. A follow-up report will be submitted to you by September 12, 1983.
l
$"~EE8Woi888sje JUN 1 5 1983 i o Pm L
l l
l
F-Mr. J. G. Keppler Regional Administrator June 13, 1983 IOZ-83-0047 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI GAS & ELECIRIC COMPANY By g s>.
. WILLIAMF, JR.
SENIOR VICE PRESIDENT DJS/M41/cse f
cc: NRC Office of Inspection & Enforcement i
Washington, D.C.
20555 NRC Senior Resident Inspector ATIN:
W. F. Christianson NRC Zinmer Project Inspector Region III I
ATIN:
E. R. Schweibinz l
l l
l I
L