ML20071K512

From kanterella
Jump to navigation Jump to search
Informs of Delay in Submittal of RO 369/82-54 Re Reactor Trip Sys Instrumentation Channel & Interlock Response Times,Violated on 820618.Rept Will Be Submitted by 820727
ML20071K512
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/16/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-82-54, NUDOCS 8208020121
Download: ML20071K512 (1)


Text

--

DUKE POWER COMPANY Powza Dunmswo 422 SorTu Cnuncu STnEET, CHAHWTTE, N. C. es24a wiw w o.e - ca.sn.

July 16, 1982 ViCr PatsiotNT IELEPMONE:Anta 704 STEAM ##ODUCTION 373-4083 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Cc,mmission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

-Re: McGuire Nuclear Station Unit 1 Docket No. 50-369

Dear Mr. O'Reilly:

Reportable Occurrence Report R0-369/82-54 was to have been submitted by July 16, 1982. This 30 day reportable occurrence (pursuant to T.S.6.9.1.13) concerns T.S.3.3.1, "As a minimum, the Reactor Trip System instrumentation channels and interlocks of Table 3.3-1 shall be operable with response times as shown in Table 3.3-2", which was violated on June 18, 1982. At this time, investigation of the incident and preparation of a report are not yet completed. The report will now be submitted by July 27, 1982.

Very truly yours,

' / ~- Q-

/

William O. Parker, Jr.

PBN/j fw cc: Director Records Center Office of Management and Program Analysis Institute of Nuclear Power Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. P. R. Bemio Senior Resident Inspector McGuire Nuclear Station

-cv c4 n.

4 ut-c;.;

C; ca (L * ;

C y

m co

)

WFICIA1. col'Y e'

W-8208020121 820716 l

PDR ADOCK 05000369

[B J2-M S

PDR i