Monthly Operating Rept for Jan 1983
ML20070U919
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/01/1983
From: Roman T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML20070U917 List:
References
NUDOCS 8302140084
Download: ML20070U919 (6)


Text

O NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE January 1983 The Station operated during the month of January 1983 with a monthly availability factor of 0.0% and a net design electrical capacity factor of 0.0'5.

The Station was shut down March 19,_1982, for a scheduled maintenance outage. The Station remains shut down due to Reactor Recirculation S, stem piping cracks found during Vessel Hydro on March 23, 1982.

CLASS I WORK - hAINTENANCE - JANUARY 1983 WR #19647 - Removed Torus covers for inspection by I6C.

  1. 19650 - Replaced flex gasket on #121 MS Drain Tank IcVel column.

l

  1. 18696 - Welded pipe caps on valve #51-44-51-45 6 51.46.
  1. 17765 - Placed new bonnet gasket - repaired small defect in gasket surface and placed in service (Layup Valve).
  1. 17241 - Removed valve from line, cleaned and lubed pivot pins, replaced 3 studs and placed back in service (Valve 38-12).
  1. 19110 - Lapped seat in CRD - Valve 1003 reassembled and tested OK.
  1. 19794 - #11 Condensate Transfer Pump Replaced impeller wear rings and both Bearing Gasket Packing.
  1. 19123 - Adjusted stroke on Valves 39-13 6 14
  1. 19124.- Adjusted stroke on Valves 39-11 6 12
  1. 18616 - Repscked #11 RRP Discharge Bypass Valve.
  1. 17235 - Repacked #12 RRP Discharge Bypass Valve.
  1. 18615 - Replaced valve stem - new flex gasket and repacked #13 RRP Discharge Bypass Valve.
  1. 18614 - Replaced valve stem - new ficx gasket and repacked #14 RRP Discharge Bypass Valve..
  1. 18613 - Replaced valve stem - new flex gasket and repacked #15 RRP Discharge Bypass Valve.
  1. 17479 - Replaced drain valve on #11 Inst. Air Receiver Tank.

CLASS I WORK - INSTRUMENTATION 6 CONTROL - JANUARY 1983 WR #19571 - Liquid Poison Tank temp. controller check and calibrate.

(Repaired terminal run and calibrated).

  1. 19585 - #11 Torus Lev. Recorder blowing fuses.

(Replaced transformer and recalibrated.)

  1. 18203
  1. 12 Inst. Air Comp. Air Valves leaking.

(Rebuilt both unloading solenoids.)

83KX2140004 830207 i

PDRADOCK05000g R

O CLASS I WORK - ELECTRICAL MALNTENANCE - JANUARY 1983 N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage.

WR #19710 Liquid Poison Tank fleater - replaced blown fuse and associated wiring WR #19512 Control Room Emergency Vent Fans 11 and 12 - checked motor amps and volts.

MODIFICATIONS - JANUARY 1983 Mod. No. NI 80-01 Major Order #1851 Mod. On Site Technical Support Center This modification included the establishment of an onsite Technical Support Center within the Administration Building on Ele. 277, complete with associated equipment - phones, computer terminal, TV camera system and ventilation system.

This modification was completed in accordance with NUREG 0578 guidelines.

Failure of the TSC and associated equipment will not result in the inability to safely shutdown or in a significant release of radioactivity.

['l V

UI i

.'1

.g 1i

}

UNITSilUTDOWNS AND POWER REDUCT10NS n{j-DOCKET NO.

50-220

  • j UNIT NAME 9 otile pt. # 1,

.}

}DATE 2/1/83

,;t o

REPORT MONill Jan. 1983 COMPLETED BY TW R=nV"'6%

i 1TLEPilONE f315)349-2412

'jl

J.

M4

,K "L

['

.i

.! ?

}

.5 Licensee

,E r f4

}f Cause & Currective Dale

{

3g

,3 g ci:

Event

y e-1 Action to d

o H

g3 E cE j;5 g Report a NU y'

,i Prevent Recurrence

,lj c5 i't Ji!

J}

p tt

) ;.

.7 8206 820323 F

744 A

4 82-009 Reltlacement of recirc. piping

.i continues.

ll

'l j ',

. a -[

L.

I q

1 M

l ;'

o t.

l:

l j,'

ll 3.l t

6.

y 1

2 3

k F: Forced Reason:

y 4

Method:

S: Scheduled A Equiprnent Failure (Explain) 1 Manual lp for Preparation of Dans p

Ejdiibit G. Instruciluns f

B. Maintenance of Test 2 Manual Scrain.

L Entry Sheets for Licensee 1j C Refueling 3 Autumatic Scram.

0161) ! port (LER) File (NUREG.

4;,

Event Re

,D Regulatory Restrictiori 4 Other(Explain) y E Operatur Training & l.ics nse Examination F Administrative p!

{.

~

I 5

i y]J G Operational Einn (Empirin)

P2/77)

Il Olher (Explain)

L Exhibit'i. Same Source

{

't i

) 1,

~~

0 a

i

.I AVER.tGE D AILY UNIT POhEli LEVEL DOCKET t:0.

50-220 UNIT 9 bliIe Pt. #1 DATE 7 /1/R t TWRomah COMPLETED BY I'

TELEPlf0NE - (315)349-2422 a

1983 AIONTH DAY AVERAGE DAILY POWER LEVEL DAY (MWe-Neil AVER AGE DAILY POWER LEVEL (M We.Nett '

I 17 2

0 0

IS 3

n 19 0

4 0

0 20 5

0 0

21 6

0 22 0

7 0

0 23 8

0 24 0

9 0

0 25 10 e

0 26 11 o

27 0

12 0'

0 2s 0

I3 0

29 14 0

0 30 IS 0

33 16 0

l INSTRUCTIONS On sliis forinat list the averaec daily the nearest whole rneyswaii,'

"" E""' I#I '" MWe-Net fier euh day in the rep.'H uip ni.insti,0.,,,,,,,,,,. hi e

- ('lI77 :

e

,r w

~ m

- - - ~ ~

.. ~

-~ -.

, e -^. o'*.t----

~ r t. e - __ Nrt?'*

_p x zy' ~ ^-

.'y"-~

^^^.- - ^

^ * - ^ '

^ ~^

=

,..r.i.-,

, a v. -+ e 3

a OPERATING DATA REPORT 50-220 DOCKET NO.

DATE 2/1/sa _

e COMPLETED BY TW Roman". wm TELEPl!ONE (315)349 I 22 OPERATING STATUS N

5

l. Urit Name:

0 Mita Dnint f in i t #1

2. Reportin; Period:

01/01/R3 - 01/31/83

3. Licensed Thennal Power ($1Wt):

1850

4. Nameplate Rating (Gross AlWe):

640

5. Design ElectricalRetir g (Net A!We):

620 630

6. Staximum Dependable Capacity (Gross MWe):

.:7.

n.._

7 ~ Slaximum Dependable Capacity (Net MWe):C

~

^

~~'

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since L.nst Report.Give Reasons:

9. Power Lesel To which Restricted,If Any (Net SIWE):
10. Reasons For Restrictions. If Any:

This Month Yr..t o-Da t e Cumulatise I1. Hours In Reportine Pen. d N4 0 744.0 116,160.0 o

12. Number Of Hours Reactor Was Critical O.O 0.0 81,606.5
13. Reactor Reserve Shutdown Hours U.0 U.u 1,zu4.2 I l. Hours Generator On.Line 0.0 0.0

.78,562.3

15. Unit Reserve Shutdown Hours 0.0 0.0 20.4 p
16. Gross Therma! Energy Generated (MWH) 0 0

129,374,390

17. Gross Electrical Energy Generated (31wH)

O 0

42,743,090

18. Net Electricas energy Generated (.\\1wn; O

0 41,392,651

19. Unit Senice r:ctor 0.0 0.0 67.6
20. Ue *.v:!b'.

F:::.,:

0.0 0.0 67.6

21. Ur : Ca, Factor (Usin:: MDC Net,

0.0 0.0 58.4

22. Unit Cap.icity Factor (Usina DER Net) 0.0 0.0 M.5 i
23. L. it Forced Out.ipe Rate 100.0 100.0 16.5 1

n 2-1. Shutdow ns Scheduled Oser Aest 6 Months Type. Date.si.c' Dur.:tian of Eachl:

l l

25. If Shut 'l>oun At End Of Report Period. Esinuated Date of Startup.

September 1983 l

26. Units in Test Status (Prior io Commercial OperatinnL Forecast Achiesed INITIA L CRITICALITY INITI A 1. E L ECT !!! CITY CO\\li!ERCI \\l. Ol'CR \\ a lON VDi :1

-.. -. w ---3 p

,,.y.-

p g-,. = _- ;- g w -._e - - ~ - ;~_ s -.,_;~~ ~v e e m "

3

--4*.-

+

~7

)

9

/,

" CORRECTION" OPERATING DATA REPORT DOCKET NO.

50-220 DATE 2/1/s3 COSIPLETED BY TW Roman' TELEPilONE f3151349-2.2 OPERATING STATUS

1. " Unit Name:

~~

9. Mile Point U6it"#i Notes
2. Reporrin; Period:

12/01/82 - 12/31/82 U

3. Licensed Thennal Power C.!Wt):
4. Nameplate Rating (Gross h!We):

640

5. Design Electrical Rating (Net A!We):

620

6..\\taximum Dependable Capacity (Gross hlWe):

630

7. Staximum Dependable C~apacity (Net A!We)
M ~

~

~ ~ ~ ~ ~

~ ~ ^

S. If Chan;es Occur in Capacity Ratings (Irems Number 3 Through 7)S'.nce Last Report.Give Reasons:

9. Power Level To Which Restricted. If Any (Net 51We):
10. Reasons For Restrictions. If Any:

This 5!onth Yr..to Date Cumulatise

!!. Hours in Reporting Pen. d 744.0 8760.0 115,416.0 o

12. Number Ofliours Reactor Was Critical 0.0 1874.0 81,308.5
13. Reactor Reserve Shutdown flours 0.0 0.0 1,204.2
14. Ilours Generatur On Lm.e 0.0 lb/z.d

/5,do4.0

15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Cross Therma! Energy Generated (N!Wii) 0 3,421,093 129,374,390
17. Gross Electrical Energy Generated (>!WIf) 0 1,169,791 4z,/40,UUU
18. Net Electricas energy Generated ('.1%Hj 0

1.134.758 41,392,651 t

19. Unit Senice tactor 0.0 21.4 68.1
20. U:-4
  • v:!!a'..'.. T::w:

0.0 21.4 68.1

21. Ur.:' Cap..: Tactor (Using SIDC Nei e 0*0 21*Z d5.5
22. Unit CapJcity Factor (Using DER Net 1 0.0 2U.9 d/.8
23. Unit Forced Outage Rate 100.U

/u.a A '+. 2

21. Shutdowns Scheduled Oser Nest 6 51onths : Type. Date,at.d Dur.:tiaa of Each::
25. If Shur flown.\\t End Of Itepurt Period. Esismated 1) ate of Startup:

September 1983

26. Units in Test Status IPrior to Commercial Operationi.

Forecast Achiesed INITI.\\ L CRITICA LITY INf TI.\\ L ELECTRICITY CO\\1\\lERCI \\I. OPER \\ iION t

('3/771

.