ML20070S140

From kanterella
Jump to navigation Jump to search
Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20070S140
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/26/1983
From: Crouse R
TOLEDO EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8302040272
Download: ML20070S140 (1)


Text

F TOLEDO Docket No. 50-346 EDISON License No. NPF-3 h.no P. Cnoust V President Serial No. 903 g3,23,3,2, January 26, 1983 Director Office of Nuclear Recctor Regulation Attention: Document Control Deck U.S. Nuclear Regulatory Commission Washington, DC 20555 Director:

Enclosed are six (6) copies of Revision 19 to the currencly approved and effective " Industrial Security Pian," AD1E08.00, for the Davis-Besse Nuclear Power Station. This revision incorporates those plan changes referenced in your letter dated December 16, 1982, and other changes which do not decrease the effectiveness of the approved sec.urity plan.

This revisien is being submitted pursuant to 10 CFR 50.54(p) as the report containing a description of the change.

Application is being made to withhold the enclosed information from public disclosure pursuant to 10 CFR 73.21.

The attached enclosures contain Safeguards Information.

Very truly yours, WW RPC:ARS:ds Enclosure cc:

Mr. James G. Keppler, Regional Director Region III l

DB-1 NRC Resident Inspector 8302040272 830126 PDR ADOCK 05000346 F

pop "WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED" SAFEGUARDS INFORMATION Unauthorized disc! sure may to subia:t to civil and Crimin ' rncUcns.

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652