Monthly Operating Rept for Nov 1981
ML20065T310
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/14/1981
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20065T300 List:
References
NUDOCS 8211020319
Download: ML20065T310 (5)


Text

f OPERATING DATA REPORT DOCKET NO. 50-269 DATE 12-14-81 COMPLETED BY J. A. Reavis TELEPHONE 7nA_271 R552 OPERATING STATUS Oconee Unit 1 Notes

1. Unit Name:

Year-to-date and cununulative

2. Reporting Period: November, 1981 capacity factors are calcu-2568
3. Licensed Thermal Power ()lWt): laced using a weighted
4. Nameplate Rating (Gross MWel: 934
5. Design Electrical Rating (Net MWe): 886 dWh g@.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions. If Any:

..+

\

This Month Yr..to.Dste Cumulative 720.0 8,016.0 73,441.0

,  !!. Hours In Reporting Period

' 0.0 3,689.2 50,975.2

12. Number Of Hours Reactor Was Critical -
13. Reactor Reserve Shutdown Hours 0.0 3,658.7 48,242.8
14. Hours Generator On.Line -
15. Unit Reserve Shutdown Hours 0 8,990,912 113,445,299 .
16. Gross Thermal Energy Genersted (MW!!)

0 3,174,500 39,476,330 17 Gross Electrical Energy Generated (MWH) , , ,

-3,836 3,009,324 37,357,333

18. Net Electrical Energy Genersted (MWH) 0.0 45.6 65.7
19. Unit Service Factor 0.0 45.6 65.7 t
20. Unit Availability Factor 0.0 43.7 59.2
21. Unit Capacity Factor IUsing MDC Net) 0.0 42.4 57.4
22. Unit Capacity Factor IUsing DER Net) 100.0 30.5 18.2 i 23. Unit Forced Outage Rate
4. Shutdowns Scheduled Over Next 6 Months IType.Date.and Durstion of Eschi:

Current Refueling December 21, 1981

25. If Shut Down At End Of Report Period. Estimated Date of!,tartup:
26. Units in Test Status IPrior to Commercial Operation): Forecast Achieved
\

INITIA L CRITICALITY INITIA L ELECTRICITY 4 COMMERCIAL OPER ATION 8211020319 811214 PDR ADOCK 05000269 pif77 '

R PDR

AVERAGE D ALLY UNIT FCWER LEVEL s* \

DCCKET NO.

50-261 LNIT oconee Unit 1 D ATE 12/14/81 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 November, 1981 MO G t

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5the-Net t g31We-Neg:

I 17 2

la 3 19 4 20 5 21

- +

5 g

1 7 -

y -

$ 24 9 :S 10 26 11 12 23 13 29 14 30 15 31 l6 -

INSTRUCTIONS Cn this fer=st. list the ner ge

. jstly unir ; ower : eves :a ',1We. Net :er esen n: ., .ne .4-.. .ng .n..cg3 ; . :ute ,

ne nearest Ahcie megsws::

ci - >

T I

I tlNII SilulDOWNS AND POWI H HliDUC'llONS DOCKET NO. 50-269

. UNIT NAME Oconee Unit 1 IIATE 12-14-81 '

November, 1981 COMPLETEI) gy I. A. Reavis HI?POH1 AION~lli TELEPilONE 704-373-8552

+y I . *l- - )

-[ IienSec 5L y" - 9 "'

y

.!. 5 k t hL Cause & Currective gj ig gge 1:ven' f,7 El Adion to -

60 k j Di 'j Hel"H ' "

[' , Psevent Recussente i 0 Sa 81-11-01 F 270.50 A --

RC VESSEL Reactor core support assembly stud replacement.

Sb 81-11-12 S 449.50 C --

RC FUELXX Loading fuel following completion of core support assembly repair.

Other maintenance continues. ,

l i

l 2 ,1 4

I I usical He.ason : kleilnal:

S Si beilnicil Exhibii G Instancilims

A i spnpsneni I;.nhne ll spl.nni I hl.innat for Psepasation of Dat.

II.klaintenance os Ic>i 2.ht.anu.al Sesam. Ents) Sheels for 1.icensee C Iteluchng .i. Autoin.itie S(s;un. Event Repose ll.liRI l'ile INilRI.G.

If Hegulalos) Hesen.non .l.()lhes ll;xpl.iin i Olgil i

1. Opes.alos Is.uning A l aicine 1 xanan iion l' Ailnuni>leative 'g G Opes.ational I una ll% plain) t,8/111 11 Othe: li!xpl.inil lixhilsit ! Same Sonsec

. . MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Oconee Unit 1 .

Scheduled next refueling shutdown: February, 1983 ,

2 .-

3. Scheduled restart following refueling: December, 1981 (current). .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

5. Scheduled date(s) for submitting proposed licensing action and supporting info rma tion: Submitted May 29, 1981 f .

N)

6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). None
7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 427* .

8. Present licensed fuel pool capacity: 1312* -

Size of requested or planned increase: None .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

s

\

DUKE POWER COMPANY Date: December 14, 1981 ,

Name of

Contact:

J. A. Reavis .

  • Represents total for the combined Units 1 and 2 Spent Fuel Pool.

DOCKET NO: 50-269 UNIT: Oconee Unit 1 DATE: December 14, 1981 NARRATIVE

SUMMARY

MONTH: November, 1981 The reactor core support assembly repair was completed on November 11, 1981.

l Loading of the fuel assemblies began on November 12, 1981 and was completed on November 23, 1981. Other maintenance items continue. Mid-December is the expected return to service date.

+