g.vga Po Aer Coenpany 333 Podmont Avenue At:aata Georg<a 30308 Te:ccnone 404 526 6526,
,),,
'.ia?ng Address Pe* Ott,ce Box 4545 e, nanta omga 303c2 Georgia Power 3 Fr~ 3 P I 21
- v"a " e** ***
Power Generation Department NED-83-023 January 31, 1983 U. S. Nuclear Regulatory Commission-
REFERENCE:
Office of Inspection and Enforcement RII: JP0 Region II - Suite 2900 50-366 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 80-16 ATTENTION: Mr. Jaines P. O'Reilly GENTLEEN:
In our response of December 14, 1982, regarding the, subject bulletin, we stated that: "As part of the upcoming Unit 2 outage, we intend to replace the Model 1151 transmitters with Model 11538 transmitters."
Due to engineering design problems, installation will be delayed until the Unit 2 refueling outage at the end of cycle 4 ( i. e., Spring 1984).
Further, it is our intention, based on current engineering design, to replace the ll51A and 1151D transmitters in the MSIV leakage control system with equipment qualified per NUREG-0588, but not necessarily the Model 11538 transmitters.
i If you have any further questions, please contact this office.
Very truly yours, fS Q - _-
L. T. Gucwa Chief Nuclear Engineer MJB/mb xc:
J. T. Beckham, Jr.
H. C. Nix, Jr.
Senior Resident Inspector 8302150702 830131 DRADOCK05000M IE ((