ML20064N003

From kanterella
Jump to navigation Jump to search
Submits Addl Response to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Models 1151 & 1152 Pressure Transmitters... Installation of Model 1153B Transmitters Delayed Until End of Cycle 4
ML20064N003
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/31/1983
From: Gucwa L
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-80-16, IEB-83-23, NED-83-023, NED-83-23, NUDOCS 8302150702
Download: ML20064N003 (1)


Text

_

g.vga Po Aer Coenpany 333 Podmont Avenue At:aata Georg<a 30308 Te:ccnone 404 526 6526,

,),,

'.ia?ng Address Pe* Ott,ce Box 4545 e, nanta omga 303c2 Georgia Power 3 Fr~ 3 P I 21

- v"a " e** ***

Power Generation Department NED-83-023 January 31, 1983 U. S. Nuclear Regulatory Commission-

REFERENCE:

Office of Inspection and Enforcement RII: JP0 Region II - Suite 2900 50-366 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 80-16 ATTENTION: Mr. Jaines P. O'Reilly GENTLEEN:

In our response of December 14, 1982, regarding the, subject bulletin, we stated that: "As part of the upcoming Unit 2 outage, we intend to replace the Model 1151 transmitters with Model 11538 transmitters."

Due to engineering design problems, installation will be delayed until the Unit 2 refueling outage at the end of cycle 4 ( i. e., Spring 1984).

Further, it is our intention, based on current engineering design, to replace the ll51A and 1151D transmitters in the MSIV leakage control system with equipment qualified per NUREG-0588, but not necessarily the Model 11538 transmitters.

i If you have any further questions, please contact this office.

Very truly yours, fS Q - _-

L. T. Gucwa Chief Nuclear Engineer MJB/mb xc: