s TENNESSEE VALLEY AUTHORITY
~
CH ATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II September 9, 1982 BLRD-50-438/82-18 BLRD-50-439/82-17 U.S. huolear Regulatory Comission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SMALL VALVES IN THE AUXILIARY FEEDWATER SYSTEM EXCEED WEIGHT AND LENGTH LIMITATIONS - BLRD-50-438/82-18, BLRD-50-439/82 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector N-h R. V. Celenjak on February 22, 1982 in accordance with 10 CFR 50.55(e) a4.
Q;9)
NCR BLN BLP 8206. This was followed by our interim reports dated u
. March 23 and July 12, 1982. Enclosed is our third interim report. We z
-4 o expect to submit our next report by December 21, 1982.
?l.g 3>
dHI If you have any questions concerning this matter, please get in touch with fq)l i
R. H. Shell at FTS 858-2688.
W; N
7.,7 Very truly yours, C'*
TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing l
Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington, D.C.
20555 WO9170102 820909
-C% 9 PDR ADOCK 05000438 S
PDR r/ d-g]
An Equal Opportunity Employer
x 1
)
ENCLOSURE j
l BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 1
SMALL VALVES IN THE AUXILIARY FEEDWATER SYSTEM EXCEED WEIGHT AND LENGTH LIMITATIONS NCR BLN BLP 8206 BLRD-50-438/82-18, BLRD-50-439/82-17 10 CFR 50.55(e)
THIRD INTERIM REPORT Description of Deficiency This deficiency concerns 1-inch and 1/2-inch globe valves which are installed in the Auxiliary Feedwater System in accordance with TVA design drawings (3BWO418-CA series). The weight and end-to-end dimensions of those valves exceeded the system piping seismic analysis limits of TVA design drawings 3BA0005-00-01 and 3BA0006-00-1 (typical drawing). The valves were purchased as industry standard without maximum weights or lengths being specified. TVA did not identify this deficiency during the review of the purchase specifications.
Interim Progress The affected valves have been replaced on unit 1.
Unit 2 drawings have been altered to reflect the new valve details. These details have been sent to TVA's Civil Engineering Branch for seismic qualification. The 3BWO418-CA series drawings were issued August 16, 1982, with the required changes. TVA's final report will address whether the new valve details are seismically qualified.
l