Category:INVESTIGATION REPORTS
MONTHYEARML20149K0491995-01-26026 January 1995 Investigation Rept 2-93-040 Re Alleged Harassment for Reporting Erosion/Corrosion Problems IR 05000261/19820031982-04-22022 April 1982 IE Investigation Rept 50-261/82-03 on 820111-0226. Noncompliance Noted:Failure to Process Info Received from Contractor & Failure to Request Amend to Tech Specs to Make Heatup & Cooldown Curves More Conservative 1995-01-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000261/19983001998-03-26026 March 1998 NRC Operator Licensing Exam Rept 50-261/98-300 for Tests Administered on 980223-26.Exam Results:Out of Three SRO & Two RO Candidates,All Passed Written Exams Except One RO Candidate IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML20149K0491995-01-26026 January 1995 Investigation Rept 2-93-040 Re Alleged Harassment for Reporting Erosion/Corrosion Problems IR 05000261/19930271993-12-0101 December 1993 Partially Withheld Insp Rept 50-261/93-27 on 931102-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Physical Security Program for Power Reactors,Specifically, Physical Security Plan & Implementing Procedures PNO-II-93-064, on 931118,licensee Initiated Plant Cooldown When Determined That as-loaded Gadolinium Pin Locations in Six Fuel Assemblies Were in Incorrect Quadrants of Assemblies.Region Dispatching Team to Investigate1993-11-19019 November 1993 PNO-II-93-064:on 931118,licensee Initiated Plant Cooldown When Determined That as-loaded Gadolinium Pin Locations in Six Fuel Assemblies Were in Incorrect Quadrants of Assemblies.Region Dispatching Team to Investigate PNO-II-93-036A, on 930816,small Fire Occurred on Exhaust Manifold of a EDG Which Was Being Run for Routine Surveillance Testing.Operators Extinguished Fire.Licensee Evaluating Exhaust Manifold for Fire Damage1993-08-17017 August 1993 PNO-II-93-036A:on 930816,small Fire Occurred on Exhaust Manifold of a EDG Which Was Being Run for Routine Surveillance Testing.Operators Extinguished Fire.Licensee Evaluating Exhaust Manifold for Fire Damage IR 05000261/19920331992-12-30030 December 1992 Insp Rept 50-261/92-33 on 921209.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Fuel.Partially Withheld IR 05000261/19920291992-12-10010 December 1992 Partially Withheld Insp Rept 50-261/92-29 on 921116-20 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security for Power Reactors,Specifically Testing & Maint PNO-II-92-054, on 920822,plant Lost Offsite Power When Unit Startup Transformer Failed.Plant Currently in Hot Shutdown, W/Restart Expected Late Tonight.State of Sc Informed.Region Also Informed State & Other Federal Agencies1992-08-24024 August 1992 PNO-II-92-054:on 920822,plant Lost Offsite Power When Unit Startup Transformer Failed.Plant Currently in Hot Shutdown, W/Restart Expected Late Tonight.State of Sc Informed.Region Also Informed State & Other Federal Agencies IR 05000261/19910181991-08-28028 August 1991 Partially Withheld Insp Rept 50-261/91-18 on 910729-0801. Violation Noted.Major Areas Inspected:Routine,Unannounced Insp Entailed Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountabiltiy of Matl ML20138F7901991-04-12012 April 1991 Notice of Violation from Insp on 910216-0330.Violation Noted:Documented Instructions Were Not Provided for Method to Establish Temporary Heating Equipment to Maintain Reactor Vessel Head Flang Temp.Procedures & Drawings Not Provided IR 05000261/19910081991-04-12012 April 1991 Insp Rept 50-261/91-08 on 910311-15.No Violations Noted. Major Areas Inspected:Meteorological Monitoring,Confirmatory Measurements,Training & Qualifications,Primary & Secondary Sys Chemistry & Radioactive Gaseous Effluent Treatment Sys IR 05000261/19910051991-04-12012 April 1991 Insp Rept 50-261/91-05 on 910216-0330.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Engineered Safety Feature Sys Walkdown & Onsite Review Committee ML20058H9781990-11-20020 November 1990 Notice of Violation from Insp on 901029-1102.Violation Noted:Inservice Insp Isometric Sketch Did Not Accurately Depict Actual Pipe Configuration IR 05000261/19900241990-11-16016 November 1990 Insp Rept 50-261/90-24 on 901029-1102.Violations Noted. Major Areas Inspected:Review of Radiographs,Observation of Code Repair Activities & Review of Licensee Actions IR 05000261/19890211989-09-29029 September 1989 Partially Withheld Insp Rept 50-261/89-21 on 890911-15 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing IR 05000261/19880111988-06-28028 June 1988 Partially Withheld Insp Rept 50-261/88-11 on 880523-24 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Procedures,Records & Operations for Use,Control & Accountability of SNM Possessed Under License ML20196A9431988-06-15015 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Combination of ECCS Subsystem Assumed to Be Operative in Evaluation Model in Updated SAR Did Not Reflect Failures of ECCS Equipment ML20148G8021988-01-12012 January 1988 Exam Rept 50-261/OL-87-03 on 871214-17.Exam Results:All Operators Passed Written Exams.All Four Senior Reactor Operators & Three of Four Reactor Operators Passed Operating Test.Both Crews Rated Satisfactory During Simulator Exam ML20236Q5051987-11-19019 November 1987 EN-87-100:on 871113,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued Based on Licensee Failure to Establish & Implement Procedures for Safe Shutdown Evolutions Following Fire PNO-II-87-067, on 871001,contaminated Dry Storage Mockup Canister Was Sent to Offsite Vendor for Machining.Licensee Believes Canister Became Contaminated After Being Attached to Contaminated Drainage Sys.State of Sc Informed1987-10-0909 October 1987 PNO-II-87-067:on 871001,contaminated Dry Storage Mockup Canister Was Sent to Offsite Vendor for Machining.Licensee Believes Canister Became Contaminated After Being Attached to Contaminated Drainage Sys.State of Sc Informed ML20235T6891987-09-30030 September 1987 Exam Rept 50-261/OL-87-01 on 870811-14.Exam Results:Six Reactor Operator Candidates Passed Written Tests & Five Candidates Passed Operating Tests.Exam Questions & Answer Key Encl PNO-II-87-063, on 870928,worker Burned by Hot Water Splashing from Drain Funnel.Caused by Personnel Error.Licensee Conducted Post Trip Analysis & Returned Unit to Power1987-09-29029 September 1987 PNO-II-87-063:on 870928,worker Burned by Hot Water Splashing from Drain Funnel.Caused by Personnel Error.Licensee Conducted Post Trip Analysis & Returned Unit to Power ML20234E9931987-09-15015 September 1987 EN-87-078:on 870918,civil Penalty in Amount of $50,000 Will Be Issued.Action Based on Violations Re Failure to Control Valve Lineup Activities PNO-II-87-046, on 870712,unusual Event Occurred When Unit Experienced Unidentified RCS Leakage in Excess of 1 Gpm Terminated.Leakage Determined to Be from 3/4 Inch Pressurizer Sample Valve Attached to PORV Relief Line1987-07-13013 July 1987 PNO-II-87-046:on 870712,unusual Event Occurred When Unit Experienced Unidentified RCS Leakage in Excess of 1 Gpm Terminated.Leakage Determined to Be from 3/4 Inch Pressurizer Sample Valve Attached to PORV Relief Line IR 05000261/19870041987-03-24024 March 1987 Insp Rept 50-261/87-04 on 870211-0310.No Violations Noted. Major Areas Inspected:Tech Spec Compliance,Plant Tour, Operation Performance,Site Security,Qa Practices & IE Bulletin & Notice Followup IR 05000261/19870031987-02-26026 February 1987 Insp Rept 50-261/87-03 on 870209-13.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters,Housekeeping,Matl Identification & Control & Svc Water Pipe Degradation ML20207T5601987-02-25025 February 1987 Insp Rept 50-261/87-02 on 870217-18.No Violations or Deviations Noted.Major Areas Inspected:Observation of Limited Exercise to Demonstrate Adequacy of Corrective Actions Taken by Licensee in Response to Weaknesses IR 05000261/19870011987-02-19019 February 1987 Insp Rept 50-261/87-01 on 870111-0210.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance, Including Observance of Any Limiting Conditions for Operations,Plant Tour,Operations Performance & Security IR 05000261/19860311987-01-29029 January 1987 Insp Rept 50-261/86-31 on 861211-870110.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance, Plant Tour,Operations Performance,Ros,Housekeeping,Site Security & Surveillance Activities IR 05000261/19860321987-01-0909 January 1987 Partially Withheld Insp Rept 50-261/86-32 on 861215-19 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Mgt Effective/ Security Program,Security Organization,Records & Repts, Physical Barriers & Protected Area IR 05000261/19860301987-01-0707 January 1987 Insp Rept 50-261/86-30 on 861216-18 & 22.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Emergency Organization Functions & Locations During Annual Exercise.Three Exercise Weaknesses Noted ML20210C7351986-12-29029 December 1986 Exam Rept 50-261/OL-86-02 on 860930-1002.Exam Results:Three of Four Reactor Operators Passed & Three of Four Senior Reactor Operators Passed PNO-II-86-059, on 860826,CP&L Plans to Keep Robinson Unit in Unscheduled Shutdown Longer than 48 H.Inadvertent Overboration of Unit During Efforts to Match Erratic Flow Resulted in Temp & Pressure Reduction.State of Nc Informed1986-08-26026 August 1986 PNO-II-86-059:on 860826,CP&L Plans to Keep Robinson Unit in Unscheduled Shutdown Longer than 48 H.Inadvertent Overboration of Unit During Efforts to Match Erratic Flow Resulted in Temp & Pressure Reduction.State of Nc Informed IR 05000261/19860171986-08-19019 August 1986 Insp Rept 50-261/86-17 on 860711-0810.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance, Plant Tour Operations,Housekeeping,Site Security, Surveillance Activities,Maint & Radiation Control IR 05000261/19860121986-05-21021 May 1986 Insp Rept 50-261/86-12 on 860505-09.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Housekeeping,Inservice Insp & IE Bulletin & Inspector Followup Items ML20203N6671986-04-14014 April 1986 Exam Rept 50-261/OL-86-01 During Wk of 860127.Exam Results: Eight of Nine Candidates Passed Oral Exam & All Candidates Passed Written Exam IR 05000261/19860061986-03-0505 March 1986 Safeguards Insp Rept 50-261/86-06 on 860218-21.No Violations Noted.Major Areas Inspected:Mgt Effectiveness,Security Program,Records & Repts,Testing & Maint & Physical Barriers. Details Withheld (Ref 10CFR2.790 & 73.21) PNO-II-86-011, on 860128,station Blackout Occurred Following Automatic Shutdown.Caused by Voltage Spike on Instrument Bus During Performance of Breaker Changeout on Emergency Diesel Generator B1986-01-28028 January 1986 PNO-II-86-011:on 860128,station Blackout Occurred Following Automatic Shutdown.Caused by Voltage Spike on Instrument Bus During Performance of Breaker Changeout on Emergency Diesel Generator B IR 05000261/19850321985-11-14014 November 1985 Insp Rept 50-261/85-32 on 851020-23.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness Exercise IR 05000261/19850271985-09-17017 September 1985 Safeguards Insp Rept 50-261/85-27 on 850827-30.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR2.790 & 73.21) ML20198A9001985-09-0303 September 1985 Exam Rept 50-261/OL-85-02 on 850828.Exam Results:Sole Candidate Passed Oral Exam ML20133P3361985-07-17017 July 1985 Exam Rept 50-261/OL-85-01 on 850618-20.Exam Results:Three Candidates Passed Written & Oral Exams IR 05000261/19850191985-06-20020 June 1985 Physical Security Insp Rept 50-261/85-19 on 850603-07.No Violations or Deviations Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR73.21) IR 05000261/19850161985-05-24024 May 1985 Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted. Major Areas Inspected:Preoperational Radiological Environ Monitoring Program at Shearon Harris & QA at Harris Lab IR 05000261/19850131985-04-23023 April 1985 Insp Rept 50-261/85-13 on 850311-0410.No Violation or Deviation Noted.Major Areas Inspected:Security,Ros,Qa Practices,Radiation Control Activities,Housekeeping & IE Bulletin & IE Info Notice Followup PNO-II-83-076, on 830916,licensee Reported That I-131 Was Detected Being Released from Auxiliary Building Exhaust at Rate 2.22 Times 15 Minute Average Release Limit Allowed.No Limits Exceeded at Site Boundary & No Emergency Declared1983-09-19019 September 1983 PNO-II-83-076:on 830916,licensee Reported That I-131 Was Detected Being Released from Auxiliary Building Exhaust at Rate 2.22 Times 15 Minute Average Release Limit Allowed.No Limits Exceeded at Site Boundary & No Emergency Declared IR 05000261/19820261982-08-10010 August 1982 IE Safeguards Insp Rept 50-261/82-26 on 820726-30.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security organization-mgt,personnel & Response.Details Withheld (Ref 10CFR73.21) 1998-03-26
[Table view] |
Text
, , ,-
-
pn ** c
.. . oq'o,
',
UNITED STATES l' '
n NUCLEAR REGULATORY COMMISSION
$'3 o
E
REGION ll 101 MARIETTA ST., N.W., SUITE 3100 o ATLANTA, GEORGIA 30303
.....
MIN 2 41982 INVESTIGATION REPORT N0. 50-261/82-03 SUBJECT: Carolina Power and Light Company H. B. Robinson Nuclear Plant Hartsville, South Carolina Possible Material False Statement DATES OF INVESTIGATION: JanuaF9 11 - February 26, 1982 INVESTIGATOR: O y'-/'f # 2__
,/O f. . Vorse, Regional Investigator Date Signed Enforcement and Investigations Staff REVIEWED BY: 4 v. w - 4-21-1 Carl G Alderson, Director Date Signed Enforcdnent and Investigations Staff
.
,
l
!
l
.
8200160377 820729 PDR ADOCK 05000261 0 PDR o _ . _ - ,, . . _ . . . _ . . _ . __,_ - .,._ __. __ ,_ _._.,_ __ _ _ _ _ _ _
7 . . .
-
.
. .
SUMMARY OF INVESTIGATION CAROLIllA POWER At1D LIGHT COMPANY H. B. ROBIflSON fiUCLEAR PLANT JArlUARY 11 - FEBRUARY 26, 1982
.
R u
.'.' o
. .
. .
1-1 J, . INTRODUCTION On December 10, 1981, NRC Region II was informed by Carolina Power and Light (CP&L) that an employee had found a letter dated April 4, 1977 from Southwest Research Institute (SWRI) which informed CP&L that an error had been discovered in data provided in their final report on a reactor vessel surveillance specimen capsule. The data submitted in the final SWRI report which was received by CP&L in October 1976, required a Technical Specification change request which was granted by the NRC in February 1977. The April 1977 letter containing the revised calculations also required a Technical Specifications change request; however this was not accomplishe After the discovery of the April 4, 1977 letter the licensee did, on January 11, 1982, submit a written report following up on the initial telephone notification indicating the error was due to an isolated administrative oversight. This report was in accordance with section 6.9.2 of the Technical Specifications. Additionally, CP&L advised the NRC that this revised information had not been provided to the NRC Commissioner who had attended a meeting at H. B. Robinson regarding the thermal shock issu Pursuant to the authority provided by Section 161.c of the Atomic Energy Act of 1954, as amended, an investigation was initiated by the NRC on December 30, 198 SCOPE OF INVESTIGATION Based on a review of the information supplied by the licensee it was determined that the investigation should include: A determination of the facts and circumstances surrounding the failure to notify the NRC of the erroneous data and request a Technical Specifications amendmen . A .'etermination of whether or not a system is now in effect to prevent a similar occurrenc During the course of the investigation, the Investigator held formal interviews with several current and former licensee employees who were considered to have knowledge of the omissio The investigation included a review of appropriate regulatory requirements, NRC records and licensee procedures including:
-
Southwest Research Institute Letter dated April 4, 1977
-
Various letters from CP&L to the NRC regarding Technical Specification amendments
-
CP&L procedures for controlling work of contractors
,
&
. . . _ . _ _ _ . . _ _ _ _ _ _ - . . _ . - ._
-
. e-
. .
'
. . .
I-2 The investigation involved one investigator and required 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of investigative activit C. CONCLUSION The licensee's failure to process the information received from Southwest Research Institute and to request an amendment to the ,
Technical Specifications which would have made the heatup and cooldown curves more conservative, represents a material false statement by omission. However, no information was obtained to indicate the material false statement was willful or deliberat To the contrcry, the information obtained indicates that the failure was the result of inadequate administrative controls at the time the letter was receive The review of existing administrative controls for handling the work of contractors indicates that they are sufficient to preclude a similar occurrenc .