ML20062G851

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jul 1982
ML20062G851
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/09/1982
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
P-82299, NUDOCS 8208130201
Download: ML20062G851 (1)


Text

,

. 4. '.

1

~

^~

public Senice Company Cf Cdorado 16805 WCR 19 1/2, Platteville, Colorado 80651-9298 August 9, 1982 Fort St. Vrain Unit No. 1 P-82299 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Fort St. Vrain Nuclear Generating Station Public Service Company of Colorado Docket No. 50-267 Operating License DPR-34

Dear Sir:

Attached please find the July,1982, Monthly Operating Information for the Fort St. Vrain Nuclear Generating Station.

Very truly yours, Ama Don Warembourg Manager, Nuclear Production DW/lsb Attachment cc:

Mr. John T. Collins Office of MIPC rEA4 8208130201 820809 PDR ADOCK 05000267 R

PDR

t e

i k

MoffrHLY OPERATING INFORMATIfN DISTRIBUTION Number of Copies

)(Original of P Latter)

Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20535 Mr. John T. Collins, Re gional Adminis tra tor - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington Texas 76011 1 (P Letter)

Mr. George Kuzmycz U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, hsryland 20034 2 (P Letter)

Director Of fice c' Management Information and Frogram Control U. S. Nuclear Regulatory Commission Washington D.C.

20555 M r. Te d C in t u la - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

U. S. Nuclear Regulatory Commission 12105 National Maryland Bank Building Washington, D.C.

20555 Cas Cooled Reac to r As sociate s - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

ATTN:

Mr. R. A. Evans 3344 North Torrey Pines Court Suite 300 LaJolla, California 92037 E le c t ri c P owe r Re s e a r ch In s t i t ute - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

ATTN:

Mr. Melvin E. Lapides 3412 Hillview Avenue P. O. Box 10412 Palo Alto California 94303 1 (P Letter)

Mr. Richard Phelps, FSV, GA, Site Representative General Atomic Company 16864 Wald County Road 191/2 P;atteville. Colorado 80651 l

l l

KRC Residen t Si t e Insp e cto r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter) l I

~

TSP-3 f,

Attachsmat-38 e

Issue 2 Page 1 of 1 orEnAmc DATA REPORT DOCKET NO.

50-267 DATE AUQUst 9, 1982 ccMPt.rTED 3r L. M. McBride m EPHONE (3031 7RS 7774 OPERATINc STATUS sorts 1.

Unit Name Fort St. Vrain 2.

asporting Period:

820701 through 820731 3.

Licensed Thermal Power () tit):

842 4.

Nameplate Racing (Gross We):

342 5.

Design Electrical Rating (Not We):

330-4.

Maxime Dependable Capacity (cross We):

342 7.

Mart== Dependable' Caescity (Net We):

330 9.

If Changes occur in Catecity,1 stings (Items Number 3 Through 7) Since Last Report, cive Reasons:

None 9.

Power Level 'to Which Restri'eted. If Any (Net We)-

231 lo. Reasons for Restrictions, If Any: NRC restriction of 70% oendina resolution of tamnerature fluctuations.

This Month -

Tear to Date Cumulative

11. Hours in Reporting Peras 744

-5.087 27.048 1:. Numeer of nours Raccor v critical

_737.0-2.723.5 17.301.9

13. Reactor seserve Ssutdown aours 0'

0 0

14.

sours cenerator On-Line 716.3 1.824.9-11.733.2'

15. Unit Reserve Shutdown Hours 0

0 0

16. cross Thermal Energy cenerated (WH) 402.306.4

-1.006.816.6-5.940.761.4

17. cron zieetrical Energy cenerated (Mwn) 145.313 331.460 2.022.816 1s. Net riectrical znergy cenerated osed) 136,256 295,518; 1.849.777 l
19. Unit Service Factor 96.3 35.9 43.4 20.-

rait Avanadiuty ractor 96.3 35.9 43.4 21.

Unit Capacity Factor (Using MDC Net) 55.5 17.6 20.7

22. Unit Capacity Tactor (Using DER Net)

-55.5 17.6 20.7 i.

23. dnit Forced Outage' Rate 3.7 16.9 31.2 24 Shutdowns Scheduled 0ver Next 6 Months (Type. Date, and Duration of Each): 821201 throuch R71714 -

surveillance testina - 336.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />

25. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A-f d6. Units In Test Status (Priar to Cocunercial Operation):

Fcr1 cast A-hieved N/A N/A IN:mr. CamcAur:

N/A N/A Nb-IsmAz. tuc a:cm N/A' N/A

-ca. w etAL OPraATres h.gGoqp

~

TSP-3 Acca.chemnt-3A Issue 2

  • AVERAGE DAILY UNIT POWER LEVEL Page 1 of 1 Docket No.

50-267 Unit __ Fort St. Vrain Date August 9, 1982 Completed By I

M. McRrid.

Telephone (303) 785-2224 Month July. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.,

(MWe-Net)

(MWe-Net) 1 200.3 17

-18.5 1

2 200.9 18 68.7 3

199.7 19 154.R 4

200.6 20 204.4 5

200.7 21 201.4 6

200.6 22 199.1 7

200.7 23 Igg.s 8

200.5 24 201.8 9

200.4 25 201.3

- 10 200.4 26 201.1 j

11 200.3 27 202.1 12 199.5 28 198.8 l

13 171.7 29 19R.?

14 186.4 30 190.9 15 200.0 31 191.5 16 82.6 l

l

  • Cenerator on line but no net. generation.

l i

l I

I l

-~-

. ~;.--,--._--,.

ll f

h C

)

3 CF.

e I

t N

e r n

f E

v u r o R

i t u2 R

h I

f t

a t

3 r e f

c r s

e e

- aie F

rt sg R

Sl e a t

p 1Al r T

o m N

r e n

2 4

E i

8 e

2 V

p t E

a 9

d 2

R t

m r

1 i

2 P

V r

n a B

5 O

a e T

9 c

8 l

t t

7 N

p s i

f O

7 S

t I

6 s

)

T m t y 2

t u

i 3

C o a r t

A r

g 0

r e e 0

o u

3 E

f h v V

e o 5

F A

L

(

I T

m r c C

a e

E E

T s

F.

r t r man T

R u

R R

c o A

m O

s h t N

n n T

e e C

(

n E

T r

C nt R

D r

a i r N

o ml m

t r

T r

n A_

t e p u

o E

c t c

S a s d llA e y n C

R s a TN U

EN R

O T

E WD S

O)

N 7

C(_

I

!?

FT4 H

S1 B

Y0 I

3 S0 m

tTC I

M 2

IE 8

R J,

REWO T

t D

l A

N u

/

A J

N S

f I

U u

R r

f N

I m

i T

f m

t i

r i

S T

oGN n-m oI n

T mTT M C-T l

r f

3 m

E t

R tl 4 A eiM E l

nSI R NO SA H

E R

W.

7 G-I-

7 T-A.

2 m_

tD Er F

v T

6 1

E 7

T 0

A 2

D 8

2 1

0 m

28 9

e e

l Ill I

lll l

ll

or R."tTE.!*TG CTFCR2iCCN l 1.

Nama of 7se111:-r.

?or-5. Vesin Uni-No. 1 l

2.

Schedulaid da a for sa::: refueli g shutdown.

Ocember 1 1983 3.

Scheduled da:a for :sstar:

fo11 ewing esfueli:2.

".-.-h.

i ton 1 l

4.

Will ::fnaling or :ssu;weica of operacian thersaf:ar : squire a

mekad " ' specifica:1on change or other license amendman ?

, Yes If ansvar is yes, wha:, in teneral, vill dese be?

Use of type H-451 grcchite.

If answer is so, has he ral ad fuel desip and cera c nfigura-

.1on been reviewed by ycur Plant Safa:7 Ravtav Cc=mi::ae :o de:ar-

sine whacher an unraviewed safa:7 ques:1:ss are associa:ad vi:h he c=ra :nload (2afarsace

_ICC71 Sec den f0.59)?

If ::o such review haa :akan clace, when is 1: schedulad?

3.

Scheduled da:a(s) for submi::1:3 proposed 11:s:si=g ac:1on a=d suceerting infer =a:1cn.

Not scheduled at this ti=e: to be determined.

N 6.

Importan: 11:ensi g censidera-cions associa:ad with refueling, l

e.g.,

new or different fuel da-l sign or supplier, unreviewed design or performance analysis sa: hods, signifd-- : changss 1:

'ual desip, saw opera:1 g pre-cedures.

f 7.

Ihe su=ber of fuel assemblias 1482 HIG2 fuel ele =en:s (a) is he eers and (b) 1:

.5.e seen:,ual s orage ecol.

185 spen: s.GR :.uel ele =ents 3.

he prssen: 11cs: sed span: fuel pcol s:crage capac1:7 and de Capacity is 11=1:ad in size :o abou: cae-size of any i= crease is licassed chird of ec:a (appr:x1=acaly 500 E!G2 s stage capaci:7 :ha: has been ele =e :3), no change is planned.

l

squescad er is planned, in

[

cumber of fuel asse=blies.

, ~. -.

REFUELING INFORMATION (CONTINUED) f i

9.

The projected date of the

', 1992 under Agreements AT(04-3)-633 and last refueling that can be

' DE-SC07-791D01370 between Public Service discharged to the spent fuel j Company of Colorado Gene al Atomic pool assuming the present l Company, and DOE.*

licensed capacity.

I

  • The 1992 estimated date is based on the understanding that spent fuel discharged during the term of the Agreements will be stored by DOE,at I

the Idaho Chemical Processing Plant. The storage capacity has evidently been sized to accomodate eight fuel segments.

It is estimated that the eighth fuel segment will be discharged in 1992.

t 2

__