ML20059L619
| ML20059L619 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/31/1993 |
| From: | Hooper G, Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-0203, LCV-203, NUDOCS 9311170225 | |
| Download: ML20059L619 (13) | |
Text
. _
.~
~
i Geof gia Power Company P
40 inverness Center Paikway l
Post Ot*ce Box 1295 l
. B.rrmngpam. Alat;ama 35201
- Telennone 205 877-7122 A
Georgia Power 1
C. K. McCoy Vce Prescent. Nuclear l
Vogtie Project November 11, 1993 LCV-0203 j
Docket Nos. 50-424 50-425 i
U. S. Nuclear Regulatory Commission
}
ATTN: Document Control Desk l
Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT t
Enclosed are the October 1993 monthly operating reports for Vogtle Units 1 and 2.
i These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, 1. Ihf ' '
I C. K. McCoy CKM/JLUgmb Enclosure cc: Georgia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS l
U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 931117 g =
- =0225 931031 I
Fs
= 03o00424 a
. ~
ENCLOSURE 1 I
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 1
MONTHLY OPERATING REPORT FOR OCTOBER 1993 TABLE OF CONTENTS f
NARRATIVE REPORT Page V1-1 j
OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 i
UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 i
i I
l i
i NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
NOVEMBER 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 OCTOBER 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
OCTOBER 31 23:59 UNIT 1 AT 100% POWER WITH NO OPER/.TIONAL PROBLEMS.
4 6
i I
i 1
V1-1 l
~
m.-_ __. _.
l i
OPERATING DATA REPORT DOCKET NO. 50-424 l
DATE:
NOVEMBER 1,1993 COMPLETED BY; G. L. HOOPER TELEPHONE:
(706) 826-4104
)
i
'f OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
OCTOBER 1993
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1151 i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1212 l
- 7. MAXIMUM DEPENDABLE UAPACITY (NET MWe):
1158
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS j
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A j
f THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 56281 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
745.0 6209.2 48411.1 l
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 14. HOURS GENERATOR ON-LINE:
745.0 6114.0 47408.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2649962 21147516 158516919
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
910160 7203638 53184623 l
- 18. NET ELEC. ENERGY GENERATED (MWH):
870320 6878198 50519163
- 19. REACTOR SERVICE FACTOR 100.0 %
85.1 %
86.0 %
i
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
85.1%
86.0 %
l
- 21. UNIT SERVICE FACTOR:
100.0 %
83.8 %
84.2%
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
'83.8%
84.2%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
100.9%
82.5%
82.0 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
101.5 %
83.0 %
81.2 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
1.5%
5.7%
{
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
N/A i
l l
i V1-2 l
~
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
NOVEMBER 1,1993
)
COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 DAY Net MW 1.
1175
- i 2.
1170*
3.
1165
- 4.
1165
- I 5.
1169
- G.
1168
- 7.
1168
- i 8.
1165
- 9.
1161
- 10.
1163
- 11.
1177*
12.
1176
- 13.
1174 *
- 14..
1171
- 15..
1163
- 16 =..
1163
- 17.
1161
- 18.
1156 19, 1152 20.
1157 21.
1159
- 22.
1172
- 23..
1176
- 24.
1174
- 25.
1172
- 26.
1171
- 27.
1171
- i 28.
1175
- 29.
1178
- 30.
1169 *
- 31..
1179 *
l V1-3 i
i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.'
50-424' DATE:
NOVEMBER 1,1993 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER
[
TELEPHONE:
(706) 826-4104-i REPORT MONTH OCTOBER 1993 R
M S
E E
Y T
A T
LICENSEE SC l
Y S
H EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED
. CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE i
NA NA NA NA NA NA NA NA
-NA NA I
l t
F: FORCED REASON:
_ METHOD:
EVENTS REPORTED 4 % ')LV.
j S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%.
j B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE i
C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION i
F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) i l
1 V1-4
i
)
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR OCTOBER 1993 TABLE OF CONTENTS i
NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 1
UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4
.(
I i
l l
r I
l 1
l
('
NARRATIVE REPORT DOCKET NO. 50-425
(
UNIT 2 DATE:
NOVEMBER 1,1993L l
COMPLETED BY: G. L. HOOPER
'l TELEPHONE:
-(706) 826-4104 i
l OCTOBER 01 00:00 UNIT 2 IN der DELED MODE, PREPARATION FOR CORE RELOAD IN PROGRESS.
.j OCTOBER 02 02:09 UNIT 2 ENTERED MODE 6 CORE LOAD IN PROGRESS; OCTOBER 05 10:25 UNIT 2 CORE LOAD COMPLETE.
.l OCTOBER 07 16:35 UN!T 2 REACTOR VESSEL HEAD SET.-
OCTOBER 09 12:19 UNIT 2 REACTOR VESSEL HEAD TENSIONING COMPLETE, ENTERED MODE 5.
l OCTOBER 16 01:08 UNIT 2 ENTERED MODE 4.
OCTOBER 16 10:16 UNIT 2 ENTERED MODE 3.
i f
OCTOBER 18 01:30 UNIT 2 ENTERED MODE 2.-
OCTOBER 18 04:27 UNIT 2 REACTOR CRITICAL.
OCTOBER 20 04:04 UNIT 2 ENTERED MODE 1.
l l
OCTOBER 20 05:41 UNIT 2 GENERATOR TIED TO GRID.
l OCTOBER 20 14:19 UNIT 2 TURBINE TRIPPED FOR TURBINE OVERSPEED TESTING.
OCTOBER 20 16:10 UNIT 2 GENERATOR TIED TO GRID.
OCTOBER 23 14:00 UNIT 2 AT 100% POWER.
-[
OCTOBER 31 23:59 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS.
l F
i i
1 i
I 1
V2-1 1
l
)
t
i OPERATING DATA REPORT DOCKET NO. 50-425 DATE:
NOVEMBER 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
OCTOBER 1993
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215-l
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1151
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1211 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1157
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS
{
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
N/A f
THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 39025
-l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
332.6 6330.6 34576.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 l
- 14. HOURS GENERATOR ON-LINE:
281.5 6274.8 34062.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GRCSS THERMAL ENERGY GENERATED (MWH):
903906 2143B940 111927288
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
304066 7328715 37913991 l
- 18. NET ELEC. ENERGY GENERATED (MWH):
282626 6985185 36051761
[
- 19. REACTOR SERVICE FACTOR 44.6 %
86.8 %
88.6 %
l
- 20. REACTOR AVAILABILITY FACTOR 44.6 %
B6.8%
88.6 %
- 21. UNIT SERVICE FACTOR:
37.8 %
86.0%
87.3 %
- 22. UNIT AVAILABILITY FACTOR:
37.8 %
86.0%
87.3 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
32.8 %
84.4 %
83.4 %
i
- 24. UNIT CAPACITY FACTOR (USIN'3 DER NET):
33.0 %
84.6 %
83.5 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.5%
1.6%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE i
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :
NA
~
i i
l V2-2 i
I k
,.~.....,.._.-.--.,.-.,m.
1
~.
l i
UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
NOVEMBER 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 i
DAY Net MW 1.
O I
2.
0 l
3.
0 l
4...
O 5.
0 6.
O I
7..
0 8.
0 1
9..
0 10.
0 11.
O i
12.
0 13.
O 14.
0 15.
O j
16.
0 17.
0 18.
0 19 0
20.
130 21.
528 22..
877 23.
1125 24.
1168
- 25.
1163 *
- 26..
1167
- l 27.
1169
- 28..
1174
- l 29.
1179
- 30.
1169
- l 31.
1180
- d j
l 4
l 4
V2-3 J
t
~
l i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:
NOVEMBER 1,1993
{
UNIT NAME:
VEGP UNIT 2
. COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 l
REPORT MONTH OCTOBER 1993 i
k R
M S
i E
E Y
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE 6 CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO f
NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 1
93-3 9/09 S
461.7 C
4 NA ZZ 777777 SEE BELOW 93-4 10/20 S
1.8 B
9 NA TA e " "'
SEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV i
i S: SCHEDULED A-EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
D-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAtLY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9-OfHER (EXPLAIN) 1 G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
.l s
l EVENT 93-3 CAQSE; SCHEDULED REFUELING OUTAGE i
COBREC.TIVE ACTIOft NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS i
CRITICAL PATH WAS; RELOAD FUEL AND VERIFY CORE, RESTORE AND DECON REFUEL CAVITY. TENSIO HEAD AND COMPLETE REASSEMBLY, HEATUP, FUNCTIONAL TESTS FOR MODE 4,
/UNCTIONAL TE. CTS FOR MODE 3, FUNCTIONAL TESTS FOR MODE 2. LOW POWER CHYSICS TESTING FOR MODE 1, RAISE POWER, BREAKER CLOSURE EVEN' 93-4 CAUSEL UNIT TAKEN OFF LINE FOR TURBINE OVERSPEED TESTING CORRECTIVEACJ10ft TESTING COMPLETED. UNIT RETURNED TO SERVICE.
V2-4
1 i
1 ENCLOSURE 3 i
i 1
VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 j
MONTHLY OPERATING REPORT FOR OCTOBER 1993 CHALLENGES TO PORV OR SAFETY VALVES l
I 6
?
~
i i
f i
l l
l l
l
f (ENCLOSURE 3)
DOCKET NOS. 50-424,50-425 VEGP UNITS 1 & 2 DATE:
. NOVEMBER 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 1
EVENT DATE TAG NO.
TYPE DESCRIPTION 1
NO EVENTS FOR OCTOBER.
l i
1