ML20059F214
| ML20059F214 | |
| Person / Time | |
|---|---|
| Site: | Claiborne |
| Issue date: | 01/06/1994 |
| From: | Walzer P AFFILIATION NOT ASSIGNED |
| To: | Jim Hickey, Selin I NRC COMMISSION (OCM) |
| References | |
| NUDOCS 9401130199 | |
| Download: ML20059F214 (1) | |
Text
j..~ ! ' -
70-3070 i
a 3 Crofton Drive Mantua,NJ 08051 January 6,1994 4
I John W. N. Hickey Chief, Enrichment Branch Division of Fuel Cycle Safety and Safeguards Office ofNuclear Material Safety and Safeguards, Mailstop 4-E-4 U.S. Nuclear Regulatory Commission Washington,DC 20555
Dear Mr. Hickey:
I have read the draft emironmental impact statement (DEIS) for the proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, LA. I urge you to expedite the licensing of the proposed facility.
I concur with your fmdings in the DEIS. The plant is needed to insure a continued supply of l
enriched uranium to fuel commercial nuclear power generating stations.
Respectfully, Pete Walzer
}
9.[ d h t
9401130199 940106 O.;
PDR ADOCK 07003070
,y C
pay
- -