ML20055H897

From kanterella
Jump to navigation Jump to search
Forwards Second Draft New STS Section 3.8 Re Electrical Power Sys,Incorporating Results of Meetings W/Numarc & Owners Groups During May & June 1990
ML20055H897
Person / Time
Issue date: 07/24/1990
From: Calvo J
Office of Nuclear Reactor Regulation
To: Hall W
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 9007310107
Download: ML20055H897 (53)


Text

{{#Wiki_filter:3 ., :G L' Yg .,v sm m e['.

July 24',1990 j

1 n w 41 y? lMr. Warren d.: Hall, Manager M Operations, Management and Support. Services Division Nuclear Management and Resources Council; 1776 Eye Street,. Suite 300 Washington, D.C.:20006-2496

Dear Mr. Hall:

Enclosed is the,second draft for new STS section 3.B Electrical = Power ' , Systems. 'This-draft incorporates the results'of our meetings with NUMARC and, 6 the Owners Groups during May and June 1990. We understand that the Owners- , Groups will:use-this draft to 3repare revised' Bases for this new STS.section and will* submit-the Bases to tie staff in' hard copy and on magnetic media in.: Wordperfect 5.1 by August 29, 1990. m, Sincerely, ORIGINAL SIGNED BY JOSE A CALVO q Jose A. Calvo, Chief Technical Specifications Branch Division of Operational Events Assessment,'HRR

Enclosure:

AsLitated-cc: C. DeDeaux, CE0G Chairman DISTRIBUTION: w/o Enclosure J. Hinds, WOG. Chairwoman TEMurley CHBerlinger J. Robertson, Acting BWROG Chaittaan FJMiraglia PWBaranowsky 0 P. North, B&WOG Chairman-WTRussell FGillespie-E. Lozito, VEPC0 CERossi JLieberman B.: Woods, SCE. - JGPartlow ELJordan-K.-Wilson, FPC DMCrutchfield WGKennedy

J. Fowler, SERI SAVarga.

MGMalsch M. Bryan, TVA: GMHolahan OTSB Members. - R; Baker, GPC ACThadani OTSB R/F ~ d BKGrimes-DOEA R/F. i @ 34yy y JWRoe FJCongel-JHConran-PDR w/ Enclosure p . Central!Mlesaw/ Enclosure p .] a Document Name: LTR TO W.J. HALL 07/24/90

  • See previous concurrence 1

.0TSB:DOEA:NRR- 0TSB:DOEA:NRR OTSB:COEA:NRR-C:0TSB:00EA:NRR .-d' 'NYGilles-FMReinhart RMLobel JACalvo x E '07/24/90- -07/24/90 07/24/90 07/24/,90 l ,i ll m.} [T Nudno y O&nv1 1 r msP W 9007310107 900724 g, y ] _, 0 F PDR REVOP ERGNI C )f 3

^ qp July 24,'1990 a t .Hr. Warren J' Hall, Manager , Operations, Managemer,t and Support Services Division , Nuclear Management and Resources Council- ~ 1776 Eye Street,; Suite 3001 'r Washington', D.C. 20006-2496

Dear Mr. Hall:

i ~ Enclosed is the second draft for new STS.section 3.B Electrical Power Systems. This draft incorporates the results of,our meetings with NUMARC and the Owners Groups during May and June 1990. We understand that'the Owners -Groups will use-this draft to prepare revised Bases for this.new STS secti9n .c E, - and will submit the Bases to the. staff in hard copy and on magnetic medir. in-1 Wordperfect 5.1 by August 15, 1990. Sincerely, Y Jose A. Calvo, Chief -Technical Specifications Branch 1 Division of Operational Events Assessment, NRR. .3 4

Enclosure:

As stated -1 cc: C; DeDeaux, CE0G Chairman DISTRIBUTIL': w/o Enclosure J. Hinds, WOG Chairwoman 7Murley CHBerlinger J.:Robertson, Acting BWROG Chairman FJMiraglia PWBaranowsky P. North. B&WOG-Chairman WTRussell. FGillespie j E.'Lozito,'VEPC0 CERossi .JLieberman B. Woods, SCE JGPartlow 'ELJordan K. Wilson, FPC-DMCrutchfield WGKennedy 1 J., Fowler, SERI-SAVarga. MGMalsch M.; Bryan, TVA 'GMHolahan OTSB~ Members y ) R.- Baker, GPC ACThadani OTSB.R/F BKGrimes-00EA R/F. JWRoe ~. FJCongel y JHConran PDR w/ Enclosure L Central Files w/ Enclosure l? .c u nt flame: LTR TO W.J. HALL / 4/90 OTSB:00EA:HRR,OTSB:DOEA:NRR OTSB:D0EA:NRR C:0TSB:D0EA:liRR f NVGilles fffMReinhart-RMLobel JAcalvo g4<- ^ 07/M/90 07/r//90 07/g/90 07/zy/90 1 g l' j l j i a n

y I ACLSources - Operating n; 3.8.1 i 3.E! ELECTRICAL POWER SYSTEMS 3.8,1 AC' Sources - Ooeratina

p i

,y LCO 3.8.1 . _The following AC-Power Sources shall be OPERABLE: a. Two circuits'"" between the offsite transmission network and i the onsite Class IE Power Distribution System, and 1 b. Two diesel generators"'" t (VS-BWR/6: Diesel generators [11) and'[12))3"" m APPLICABILITY: MODES 1, 2, 3,'and 4. (VSGE: MODES 1, 2, and 3.) 1 ACTION ~ CONDITION REQUIRED ACTION COMPLETION TIME A. One [ required) offsite A.1 Perform SR.3.8.1.1 1 hour l circuit inoperable, for the remaining [ required) offsite M circuit. Once per_8 M hours thereafter A.2 Restore [ required) 72 hours offsite circuit to OPERABLE status. I 'l ~ Two abysteet tv indsoendent circuits to be described in Roses. Two sacerate std indeoendent diesel generators to be described in the Bases. " Five item diesel generator List moved to Bases and discussed there. See page 8 of NRC Oct. 12 1989 Specification, LCD 3.8.1 for list. Also discuss the " Notes to ReviewerH same page 8. ALSo discuss other items necessary for diesel OPERA 81LITY. Unit Name 3.8-1 7/24/90 ra-

.p .l AC-Sources - Operating 3.8.1 ACTIONS (continu'ed) 4 CONDITION REQUIRED ACTION COMPLETION TIME B. One (required) offsite B.1 Restore (required) 24 hours circuit inoperable offsite circuit to-OPERABLE status. A!!D E No offsite power to-B.2-Restore offsite power .24 hours t one division of the to both divisions, i onsite Class '1E Power Distribution System (VS-BWR/6: (VS-BWR/6: No_offsite power to Restore offsite power division'1: 11) or to division (11) and division.;12) of the division (12).) ( 'onsite Class IE Power Distribution System)- .MQ. E OneLor more: required-B.3[.1) Restore required-24 hours . features from the features to OPERABLE other division

status, inoperable.

(VS BWR/6: One or more required features from the other division [12] or division [11) inoperable.) ~f i l (continued)

Unit Name 3.8-2 7/24/90

I i;' eJ s i*' I t =AC' Sources - Operating- ,~ 3.8.1 i { ACTIONS (continued) CONDITION REQUIRED ACTION COMPLETION TIME (VS:. B&W,CE,W:- 0_Bi MQ 'C'" The turbine-driven. B.3.2 NOTE---------- auxiliary feedwater Required Actionc l pump. inoperable.1 B.3.2 is only required in MODES 1, a 2, 3, and in MODE 4 when auxiliary-feedwater is being a used for plant shutdown and startup. Restore turbine-24 hours driven auxiliary feedwater pump to operable status. ) (continued) I i i, I l This note shall be consistent with the Applicability re@ lrements of LC0 3.6.5 Auxiliary Feedwater system. A note shall be added to the seses that explains that when the pressure is < (7151 psig the turbine driven auxittery feeduster puip need not be capable of meeting the surveillance rewirement limits of SR 3.6.5.2 on developed head to satisfy the OPERASILITY requirements of re w ired action s.2.3.2. However, the puup must be cepeble of coming @ to speed and del {vering flow. Furthermore, the licensee shalt verify that the pulped passed its test at 3.6.5.2. . Unit Name 3.8-3 7/24/90 1

4 t 'l. i AC Sources --' Operating 3.8.1 ACTIONS (continued)' } CONDITION REQVIRED ACTION-COMPLETION TIME C. -NOTE------- C.1 Perform SR 3,8.1.1- .1 hour Required Actions _- for (required i C.21 or C.2.2 shall offsite circuits. 8 10 be completed if this condition is entered.= Once per S

l hours thereafter

"~ One (recuired) diesel MiQ generator cetQrd4 E":"",'LMVS-BWR/6 : C.2.1 1 ^tr;;,; nab::n;: ;f- [8] hours Diesel generator (11] 2

n :::ee fer th;i

"'"LC r" - ' 5:p;r: bili ^g or(12]p,et^" 8 08 f f M*) +2:t vuld....k. the eth;. d;..el l QB C.2.2 Perform SR 3.8.1.2 [8] hours for OPERABLE diesel generator (s]< (VS-BWR/6: Perform SR 3.8.1.2 for OPERABLE diesel generator '(11] or (12] and.SR 3.8.9.2 for OPERABLE diesel generator (13].) MiQ C.3 Rescore (required] 72 hours diestl generator _to OPERACLE status. (continued) (_ /- x Determin e. OPER A B L E' olie se.1 3enerder is, not E pperR M-- olu % c.a myno n c m A,'l %, i Unit Name 3.8-4 7/24/90

i c -AC Sources - Operating; 3.8.1 ' ACTIONS (continued) 1 CONDITION REQUIRED ACTION COMPLETION TIME .1 D L - /- - - - -N TE- -0.1 P.,iurm 5R'3.671.1 1 h;w =~

  1. e re on M requircu; D

.1 r .2. sh 1 nrre 4 +. ,4.,n- +,. tun l e m ete if hi p..id)...ionae...........[. e g-4 ace pr s g,, the One [ required) diesel- - ~ ~ ~ ' ' ' * ' '- generator wt-yemik OPEP/SLE. D.2.1 0:t: m ir,e eb;;r,;; f_ _ is1 hnnre- _c r : ceuse T, Uis ~' ~ E ,dimen1 4-ap--ih414+ u One, m, W that wan1A =mba + ka' ~~ .Any required features 7th:rd{suj~ T powered from.the

-- r
t;r;s) r,;;-

i OPERABLE diesel GFERABLt.. - r generator (s], met-- ObE0[bbE. - th 8 i b.2 P,CIiUFm__@M h.h.1.2, I. N I. h ^'_' ** ! vr LMDL.L U ll'yt! l ivi nanar>+nere1 tys. GWR/6: rerform 5R-1 a.!.2 f r 0"E"f.SLE- --f,' H I sh'i' etE. -w: t"m.:rc de w.,. s. ivs vr Limu w i. jig ^1seiiei.ter - L'=JJ D .1 Restore'[ required) 4 hours o diesel generator (s) to OPERABLE status. V 08' Df.2[.1) Restore 4 hours required features to OPERABLE status. (continued) 1 Unit Name 3.8-5 7/24/90 ~'

= nm t AC Sources Operating c.. p-3.8.1 1-s q: L ' ACTIONS (continued) 1: p, CONDITION REQUIRED ACTION COMPLETION TIME f (VS:' B&W, CE W:- i S l Q,8 A!iQ CLH The turbine-driven auxiliary feedwater .0//.2.2 ---NOTE-------- pp#uired Action Reo _ pump not OPERABLE .2 is only-l- required in MODES 1, 2, 3, and in MODE 4 when auxiliary feedwater is being used1 for plant 4 hours h,4 shutdown'and startup. ) Restore turbine - L driven auxiliary feedwater pump to i 1-OPERABLE status. L L (continued) l' i 'I 1 1 l .. i This note is, and shall be, consistent with the Applicability requirements of LCO 3.6.5 1; Auxillery Feedweter system. A note sheLL be added to the Bases that explains tht; When the pressure is l <!7151 psig the turbine driven euxillery feedwater pump need not be cepeble of meeting the surveillance l> requirements limits of SR 3.6.5.2 on developed head to settsfy toe OPERASILITY requirements of required l ection D.3.2.2. However, the pump must be capable of coolne w to speed and delivering flow. Furthermore, l' the licensee shalt verlfy that the pumped passed its test SR 3.6.5.2. ~ Unit Name 3.8-6 7/24/90 1 1

.')i' j 1 .. u, F AC Sources - Operating 3.8.1

  • ACTIONS-CONDITION REQUIRED ACTION COMPLETION TIME;

) E. TE-- -- I' P;. Tv iii ';" 3. ^. T.t C R u e'A ion .2 fer re iniT r .2 al .e [ m "4 ed] OW ie C c p et if hi

  • c e "

Ao i on e er d/ t.;; par u - ................(. h e-y 1 One(required] thero rte-offsite circuit m e GPERABLE. ingr@ SL, .MQ E 2.1 0;te, a.;ii..t: care eu - S 5;..

x ;. ;;..w k r. J.;

diese' diar ^' " r.bil ity One [ required]inoper&% generator e t %t re d....ie tne OMitAtti. (VS BWR/6: .th., uiesei- -Diesel generator (11]. 91..; reto, i s ] 4 j or (12] ;;t OP:PO ti) Anapacebh, i inoof(klAL-I MD m, ..... h 7 livur a r.. r e s...... a n a.v.ac fer ^7;^A^LE uieseT n .tv.[aj. v5-nuD/6: Perform SR _ S.8.1. 0 ivr urtKAULL

  • d'??"' ;;.euraver'

[_"_,'_....-...".o^^n 'n 9 for OProAnLE ^ 'usawl f^r. r;Aur v 3 i r191 ) s. fifffb-E f.1 Restore [ required] 12 hours I offsite circuit to OPERABLE ~ status. 1 QB E/.2 Restore (required] 12 hours j diesel generator to OPERABLE status. (cont'nueo) i i . Unit Name 3.8-7 7/24/90 l

1 i 'AC' Sources - Operating 3.8.1 _l ACTIONS- . CONDITION -REQUIRED ACTION COMPLETION TIME i L1 .:rfe m S". 3.".l.1 - ! 'a"r i ---N0 F. 'Ac . 2.1 - -fer rc :ir,ir.;- 1 2 a e --[re~'4*ed) eff !te e d 1 cireni+ nt [e, i io is bnehequired)- Det:mine.'sens. 5f A hnure o offsite circuit

  • F21 u

SPEFABtL ihop d M - 4emmon-ceese Te. % e d_i n _e.1

2....-.-. = h 4 1 4 t _v r __ -

k It wbulb M5kW hil ' -.a ke, uiesvi ~ One (required) diesel 9:n;..ivi[3] generator-ne4-inopfM inep;rd':. 0FEAABl.& (VS-BWR/6:- Diesel generator (11] O or (12) % ino%. r, 0^5 n a m r_. ) rviivim on a.o... ,,, v u,,- far OoE""X E diesel 0^n:r;tei [a). {";- ) ,,,JhlR/S: ". Turm 3" /( g J-n1 e <- ^^"a a ni E - h _ 111 ar ia ' ;;ae. etei- - [12]':nd ,__ mmen.SD- -i n, e ivs VI b u nw k w' "';l vonvrator Li 1m s t--J'J continued .j I r o Unit Name 3.8-8 7/24/90

.=

  • AC Sources Operating 3.8.1 1ACT10NS l

CONDITION REQUIRED ACTION COMPLETION TIME 6NQ AND N r om or rNN any required featuree F/[.1 Restore (required)- 4 hours o not opapeMe-4ha.t offsite circuit to Jepsnu> on. OPERABLE status n r. r_ u u. g %y g F/.2 Restore (required] 4 hours 4 ND8]Dh diesel generator to OPERABLE r.tatus k.50 k4Ce 5 l DE [n opgrAk. Ff.3[.1) Restore 4'. hours I. required features to OPERABLE status.- 8!iD F /)I.3.2 ---- -----NOTE------ ,_(VS: B&W,~CE, W: Required Action ff.3.2isonly: OR. required in MODES 1, The turbine-driven auxiliary feedwater 2, 3, and in MODE 4 pump e+ OPEP'."L;, hour auxiliary fn ggd feedwater is being ~ y used for plant shutdown and startup. -l Restored turbine-4 ham fi driven auxiliary feedwater pump to } OPERABLE status. l (continued) L I L This note is and shall be, consistent with the Applicability requirements of Lc0 3.6.5 Auxtllery feechseter system. A note shall be added to the Bases that explaine that when the pressure is <[715) pelg 1. the turbine drivem auxitlery feedwater pw p need not be capable of meeting the surveillance requirement Limits of sa 3.6.5.2 on developed head so settsfy the OPERASILITY recpirements of required action 0.3.2.2. However, the pwp nust be capable of coolne w to speed and delivering flow. furthermore, the licensee shall verify that the pw ood passed its test SR 3.6.5.2. Unit Name 3.8-9 7/24/90

a, / >} l 1 s -AC Sources - 0perating - 3. 8.1 - 1 . ' ACTIONS:(continued) 1 CONDITION -- REQUIRED ACTION-COMPLETION TIME' l G.'Two(required)~ diesel GA- -- Pr fs m SR 3.8.1.1- --I heer generators no.t inogd 49u4Md]---. oqfk.tecircuits. . 0nroantr, (ys.BWR/6: Diesel generators l (11) and (12] *e4-ANQ 0" AM ) 2 hours G./ l Restore one anoper [ required) diesel generator to 1 OPERABLE status. (VS BWR/6: Restore R one (required] diesel generator (11] or g'2] to OPERABLE sta.us.)- H. Two-(required) H.1 Restore one 24 hours offsite circuits # [ required) offsite GEGRABh6 circuit to OPERABLE neopC O. status. (continued) l t' l l Unit Name 3.8-10 7/24/90 b-+ n,

9 p 9 AC Sources - Operating-i

3. 8.1 ;

j l ACTIONS'(continued) h "u-CONDITION.' REQUIRED ACTION COMPLET10N TIME 1. Two [ required) 1.1

Restore one 12 hours offsite circuitsJ (required) offsite PER^o% i noprd circuit to OPERABLE status.

) .l - 6tfD 2 - oc vnm. 0B -Aa,y. required feature 9 that depends on 1.2(.1) Restore required 12 hours remaining AC sources features to OPERABLE 4 W M ER^o' r i q tr e

status, j

(VS: B&W, CE, W: QB 7 8.N,Q N The turbine-driven auxiliary:feedwater pump M OoER^3LE I.2.2


NOTE---------

inoper M, Regtlired Action i Q @ 2 is only required in MODES 1, E 2, 3, and in MODE 4 when auxiliary i feedwater is being used for plant shutdown and

startup, Restore turbine-

- ( *2, hom3 driven auxiliary feedwater pump to } OPERABLE status. (continued) l L I l L l l I This-note is, and shall be, consistent with the Applicab,Lity requirements of Lc0 3.6.5 l Auxiliary Feedwater system. A note shall be added to the 8 eses that explains that when the pressure is l- <t715) psig the turbine driven auxillery feedwater pulp need not be capable of meeting the surveltlance i requirement limits of SR 3.6.5.2 on developed heed to setlefy the OPERASILITY requiremente of required action D.3.2.2. However, the ptmp must be cepebte of coming g to speed and delivering flow. Furthermore, the licensee shall verify that the puiped possed its test SR 3.6.5.2. L Unit Name 3.8-11 7/24/90 l'

~ c. 4 AC Sources Operating ? 3.8.1 wf ACTIONS'"(continued)- t CONDITION-' REQJ1 RED ACTION COMPLETION TIME f J. '.Three or more --- --- -N E-- (required] AC' sources Co dit on is et ^P:"3 4 c ver d th's if\\0pt r ond ti ...f... J. Enter LCO 3.0.3. Immediately ._ K. Required Actions and K.1 Be in MODE 3. (VS-B&W,'CE,- l Associated Completion W:. Times W. --L 6 hours) E%;ey6 ivr burig i L imi ~ (VS-GE: A Cogh t-fon a 12 hours) lL.D 4> e/ c) p/ E FC 1 1I K.2 (VS-B&W,CE,W: Be 36 hours f in MODE 5.) d L not. MfY 4 (VS-GE: Be in MODE'4.) j SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1'l Verify correct break'er alignment and .7 days indicated power availability,for each (required] offsite circuit (continued) . an" aand musiuty of devices providine the ind.p.ndence or..per bility.= This detail moved to the B .s. Unit Name 3.8-12 7/24/90

c.- 3-1 AC. Sources - Operating 3.8.1 JSURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR: 3.8.1.2 -'-------- -----~~-NOTES ------------------ 1. Performance of SR 3.8.1.5 satisfies this-surveillance. 2. All-diesel generator starts may be preceded by prelube procedures as recommended by the manufacturer.- 3. Following d esel generator start, warmup _ procedures'sJeh as idling and gradual acceleration may be used as recommended by the manufacturer. [When they are not used, the time, voltage, and frequency toleranegsspecifiedin-SR2.8.1.5must be met.) Demonstrate each diesel generator starts from As specified-standby conditions and achieves the following-by Table 3.8.1 - } steady state voltage and frequency: a.- : Voltage 1 [3{44) volts and 5 [4576] volts, and b. Frequency 2 [58.8) Hz and 5.(61.2)~Hz.

i SR 3.8.1.3- ------------------NOTES----------------------

U 1. Diesel generator loadings may include LI gradual loading as recommended by tbe manufacturer.

2.. Momentary transients outside the load range-do not invalidate this test.
3. - This surveillance shall be conducted on g.,Pgg,g g} )

only one diesel generator at a time. .It4/At 3,g,; SR 3.8.l'.4 Verify pressure in required. air start 31 days I receivers 2 (160]-psig. - Oim os 6+@ tA t h Ofe.s e I goN1Afv1 ts s rykre,,pg.gd, jesde). j fogg Co rshwk at a l oa d.> t w e_3 g Discuss in Bases this plant specific braclet. Not all plants have voltage and fregJency esters conveniently available. Therefore, brackets. Unit Name 3.8-13 7/24/90

l .o AC Sources - Operating 3.8.1 it SVRVEILLANCE REQUIREMENTS (continued) j / SURVEl%ANCE J FREQUENCY Dem strateeac[dieselgen ator is As sp cified syn hronized, oaded and op rates for 2 6 by T le 3.8.1 i min ates at a ads [5450] W and s [5744 kW. / L l [ L l N l A survelllance was deleted because the Inforestion in it is to be moved to the Bases. The survellterre stated,* Verify each diesel generator stigned to provide emettency power to associated emergency buses within one hour following dieset operation." Such a reeJirement is laplicit et all times in the definition of diesel ponerator CPtt481LITY. Therefore, discuss the content of this former survelliance i in that port of th; seses that discusses the items necessary for e diesel generator to be OP.RABLE. Unit Name 3.8 14 7/24/90

r o I AC Sources Operating i 3.8.1 i SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR 3.8.1.5 - ~~-- --- ----NOTES --- ------ 1. All diesel generator starts may be preceded by an engine prelube period, t 2. Following this Surveillance Requirement, i perform SR 3.8.1 3. l Demonstrate each diesel generator starts from 184 days i standby condition and achieves he following voltage and frequency in s [10 ) seconds: l a. Voltage 2 [3744) volts and s [4576) volts, and b. Frequency 2 [58.8) Hz and s [61.2) Hz. ^ r Tosert X '8 [18 months) SR 3.8.1.6 f Demonstrate [ automatic / manual),transferof = ad a^1 - [ safety related power supply) from the 9^a ia "DE S - normal. circuit.to [each required o circuitandbetweentherequired)[,fsite offsite '"! "U,CE,W ~ circuits. 1 9.?, iad 4 y e l he atI alaa*= have voltese and h - _,_.m._..c.' y -""'= '"--8-- ' 'a. 1. Explain in Ba6es why SR 3.8.1.6 is in brackets, (eeny destens, see bracketed text of ) SR 3.8.1.6.). j 2.- tapteln in Bases the 18 months is in brackets to allow for 24 month fuel cycles, If as a part of normal plant evolution while coming down in NODES or polns up in j 3. i NODft this sur Llance le perfores( ycording to plant procedures while in (V$a .h&W,CE, W htB and 4) (vs+0E: Mar /3), credit may be taken for perfor *Ing this j survoittence even though it wee performed in one of the prohibited modes. Zaptain s this onception in the Bases. Put in brackets the name of the plant speelfic safety related power sply. Put in brackets the correct words for the porticular plant design. Unit Name 3.8 15 7/24/90

@,;r+t 1 i 2 n 's Je vi[llN

s. hah noh be f 1

t r Un MODES ln 2, g i 1 2 Cre dit-mq w be h b ""P "M d h '.j eve +3 wMb sed-b4 3 thi m u es'J)c w c 4__. l A-1 1Mi Pe t k fud .Rk e in5ert /t bd m.s w g a m a em MoDEN I, 2., 3, et y 1, 1, m 3 } {. VS-G 6 : 60 DES e 3.p /r4 l

i AC Sources Operating 3.8.1 i SURVEILLANCE REQUIREMENTS (continued) { SURVEILLANCE FREQUENCY 16 SR 3.8.1.7 Demonstrate each diesel generator rejects a 18 months load 2 [1200) kW and: a. Following load rejection, the frequency is s (63] Hz, and I b. Within [3] seconds following load rejection, the frequency is 1 [58.8) Hz ( and 1 [61.2) Hz, and c. Within(3)secondsfollowingload rejection, the voltage is 2 [3744) volts l and s [4576) volts. i L2.sserr .* 3. n SR 3.8.1.8 Demonstrate each diesel generator does not [18 months) i trip and voltage is maintained s (5000] volts -d ^ ^ * " - - during and following a load rejection 1 in "^^ES [5450) kW and s (5740) kW. Jy! ee,0, e: ).?,3, ed ') ,N, ! b.,~ y m J l because of hardware dif ferences, each licensee will have to deslen a plant specific st that meets the spirit of this surveillance. Therefore, trackets. (. " 18 months in brackets to allow for 24 eanth fuel cycles. Unit Name 3.8 16 7/24/90

AC dources - Operating 3.8.1 1 SURVEILLANCE REQUIREMENTS (continued) .l SURVEILLANCE FREQUENCY i SR 3.8.1.9 --- --------- - -- NOTE------- -- -- ---- i

l. All diesel generator starts may be preceded l

by prelube procedures as recommended by the }.$h$ ..M.................... is emonstrate on an actual or simulated loss of (18 months) l offsite power signal-i -d -- ' h l-in "00 S a. De-energization of emergency, buses. I

b.. Load shedding from emergency buses, and

@ ! ~.l,CE,W. l 4,2,3, d 4) - != c. Diesel generator auto-starts from standby l' condition and: iva ut: M, and 3) ~ 1. Energizes permanently connected i l loads in s (10) seconds, 2. Energizes auto connected shutdown loads through load sequencer, 3. Maintains steady state voltage 2 i l [3744) volts and 5 [4576) volts, 4. Maintains steady state frequency 2 l (58.8) Hz and 5 [61.2) Hz, and L 5. Supplies permanently connected and auto connected shutdown loads for 2 [5] minutes. (continued) i l I 1 1 18 months in brackets to allow for 24 month fuel cycles. Unit Name 3.8 17 7/24/90 l l

,, f 3 g ~^ ~ - ' ~ ~ ~ ~ q m, y -,; AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)- SURVEILLANCE FREQUENCY SR 3.8.1.10


~~

-- - NOTES---- - ----- ------ t, All diesel generator starts may be preceded by prelube procedures as recommended by the manufacturer, i' gDemonstrate on an actual or simulated..g. g e.K.y.,..................... [EngineeredSafetyFeatures(EST)) [36 months) actuation signal with delayed loss of offsite power: on a staggered test basis a. Each diesel generator auto starts with SR from standby conditions and: 3.8.1.11 1. Achieves voltage 2 (3744) volts and 1 (4576) volts in s (10) seconds after =d d & auto start and during test, "00E S s __ 2. Achieves frequency 2 [58.8) Hz and s 65 BW,CE, W [61.2) Hz in s [10) seconds after A 2,3, and 4} w auto start and during test, Tvs u. b. Permanently connected loads remain Ar 2, ana 4)% energized from the offsite power system, and c. Emergency loads are energized (or auto connected through the load sequencer) to the offsite power system. Before the last load step, simulate loss of offsite power and demonstrate: a. De-energization of emergency buses, b. Load shedding from emergency buses, c. Diesel generator from ready to load condition: (continued) taect fressency of performing this futt test is still en open issue. One preposet is to perfore thle SR every 36 months en a staggered test bases with SR 3.a.1.11. Concern is that 3.8.1.10 causes water hammer. Ney only reeJire SR 3.8.1.10 he fully performed only once in a plant lifettee. other SR 3.8.1.10 he futty perforand only once in a plant (Ifettee. Other SR 3.8,1.10 reestrements w wid be fulfilled vie a sleutetton that evolds water henner. The 36 months is in brackets to ottow for 18 month or 24 month refueling intervals. The rumber in brackets should be two tlass the refueling intervet. Unit Name 3.8 18 7/24/90

L AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY i-SR 3.8.1.10 (continued) 1. Energizes permanently-connected

loads, 2.

Energizes auto connected emergency loads through load sequencer, 3. Achieves steady state voltage 1 [3744) volts and 1 (4576) volts, 4. Achievee :twooy state frequency 2 (58.8) Hz and S [61.2) Hz, and 5. Srpplies permanently connected and auto cennected emergency loads for 2 [5] minutes. (continued,' r i I n i Unit Name 3.8-19 7/24/90 1

!j o AC Sources Operating 3.8.1 ] SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR 3.8.1.11 - NOTES-- l g.All diesel generator starts may be preceded by prelube procedures as l recommended by.the manufacturer. 20 l

  • a.. g g.g.. g.........................

I $ Demonstrate on an actual or simulated [ Engineered Safety Features (ESF)] [36 months) signal, each diesel generator auto-starts on a staggered from standby condition and: test basis y with SR a. Achieves voltage 2 [3744) volts and 3.8.1.10 i s (4576) volts in s [10] seconds after auto start and during test, and nnt when I b. Achieves frequency 2 [58.8) Hr and I t, "^0ES ~ [61.2) Hz in 2 [10) seconds after auto start and during test, t TTa un,bL,W. c. Operatesfor2[5] minutes, J ?,3, end 4) - d. Permanently connected loads remain - G ui. energized from the offsite power 4, 2, ;nd 3) system, and i e. Emergencyloadsareenergized[or auto connected through the load sequencer) to the offsite power system. 1 ? Fregaency of la 3.8.1.11 la tentative mtil the issue of SR 3.8.1.10 is settled. The 36 months is in brackets to attow for 18 months or 24 month refueling intervets. The rueer in brackets should to the refueling interval tises two. Unit Name 3.8-20 7/24/90

AC Sources - Operatin i 3.8. SURVEILLANCE REQUIREMENTS (continued) i SVRVEILLANCE FREQUENCY l. SR 3.8.1.12


----NOTES---

L h All diesel generator starts may be preceded by prelube procedures as z.. g g.y the manufacturer..x.9...................... recommended b i l Demonstrate on an actual or simulated (18 months) loss of offsite power signal in I conjunction with an actual or simulated - ;.;d 91 l [ESF) actuation signal: "u-1-unnrc l r (E :",CE,": 1 a. De energization of emergency buses, 1_$ 't and 41 - b. Load shedding from emergency buses, .j c. Diesel generator auto-starts from l standby condition and: i 1 1. Energizes permanently-t connected loads in s (10) l

seconds, i

2. Energizes auto connected l -- emergency loads through load sequencer, 3. Achieves steady state voltage 2 3744) volts and 5 (4576) volts. I 4. Achieves steady state frequency > (58.f:1 Hz and 1 (61.2) Hz, and 5. Supplies permanently-connected and auto connected emergency loads for 1 [5] minutes. at l l t 18 months in brackets to attou for 24 month fuel cycles. A survelllence tses deleted that sold, "Perfore enetysis to damerstrate the capab;Lity of the diesel generator to ensply the esorst case design Leeds se bened noon the results of the teste cor&cted in ) et 3.8.1.9 (Loss of of f site power test) eruf et 3.8.1. (Lees of offette power in conJmetion of ESF actuotton). Crels herbuck to add this (tes to his tiet of itene for 50.59 audits. Item also covered m der Configuration Management programs and Coordination studies, j Unit Name 3.8 21 7/24/90 l

l i AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) SURVE!LLANCE FREQUENCY i e-23 1 J M Kij SR 3.8.1.13 Demonstrate each diesel generator's [18mont(s) l automatic trips are bypassed on [ actual or simulated loss of voltage {end Eii m concurrent with and actual or ~ i signal on the emergency bus er 4-unnrs f simulated [ESF) actuation signal) (" B"AE, W F ~ except: L,2,3, and S a. Engine Overspeed [V5GE; b. Generator Differential Current 1,2, ;nd )) l c. Llow Lebe Oil Pressure) .i d.

High Crankcase Pressure) e.
Start Failure Relay)

) I SR 3.8.1.14 - --- NOTES - ---- -- - --~~ 1, Momentary transients outside the load range do not invalidate his test. 25 g.)..y o. g.x........................ Demonstrate each diesel generator operates for 1 24 !<ours: [18 months) e-d 2 a. Loaded 2 [6000) kW and s [6315) kW d e- '- "0 DES for first 2 hours, and 'YS SS,CE," N b.. Loaded 2 [5450) kW and s [5740) kW l A *t - =d 1), during remaining 22 hours of-test. -i (t' 0. L 2, ;nd 3) i 18 months is in brackets to stiw for 24 month fuel cycles. Esplein in the bases that Licensee may tenot perform this SR in (VS BW,CE.W IIODES 1,2,3, and 4) (VS Gtt IIODES 1,2, and 3), if performance of the SR askes the diesel ponerator looperable. l 18 months is in brackets to allw for 24 month fuel cycles. Unit Name 3.8 22 7/24/90

i AC Sources - Operating i l 3.8.1 SURVEILLANCE REQUIREMENTS (continued) 1 SURVEILLANCE FREQUENCY l l 1 SR 3.8.1.15 --- -~~~ -- --- -NOTES---- ------ -- --- 1. This surveillance shall be performed ] within 5 minutes of shutting down the diesel generator after the diesel generator has operated z z 1 hours at 2 (5450) kW and s (5740) ) J -kW. 2. All diesel generator starts may be i preceded by )relube procedures as recommended ay the manufacturer. 3. Momentary transients outside of load

range do not invalidate this test.

1 Demonstrate each diesel generator starts 18 months l and achieves the following voltage and frequency in s [10) seconds: a. Voltage 1 [3744) volts and 5 [4576)

volts, i

i b. Frequency 2 [58.8) Hz and 1 (61.2) i Hz. .I I ^l j i l I A survelttence regJirement was deleted that seld, " Verify peraenently connected and auto connected loads are less then (the continuous rating of the diesel generator), with a f regaeuy of 18 months during shutdown." Give this ites to Craig Narbuck to include in 50.59 audits. Unit Name 3.8 23 7/24/90 l 1

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY I,nscrt Xi SR 3.8.1.16 Demonstrate each diesel generator: [18 months) a. Synchronizes with offsite power ar.d Eii source while leaded with emergency "%a 4a MDEL loads upon a simulated restoration of offsite power. @S-0W,CE,W. ~ 4 d,3,.nd 4'm b. Transfer loads to offsite power sources, and G';- OL c. Returns to ready to load operation. 6 1 i A ) l J l j ~ j 18 months in brackets to ottow for 24 month fuel cycles. Unit Name 3.8-24 7/24/90

i AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE -FREQUENCY LIM trY X9 28 SR 3.1.8.17 Demonstrate with a diesel generator [18 months)- operating in test mode and connected to its bus, an actual or simulated 4!::d n;l '%n [ESF) actuation signal overrides the 4a "^95: test mode by: 4"0 4, C E," - 1, ?,2, er.d 4) - a. Returning diesel generator to ready to load operation [, and) f uc >r - 1,2. and 3)) r [b. Automatically energizing the emergency load with offsite power.) SR 3.1.8.18 DNnNra2theSnTefYa1between [18monthsg each load block is within [10%of design intervall for each emergency -{: d n;i " 9 _ [and shutdown] Toad sequencer. 9 "^0ES -(YS SM,CE,M _ l 1,2,3, ^T i)- 63-GE. L?, : d :)) 5 9 Empteln in Bases that this' entire SR in brackets because of verlations from plant to plant. Each Licensee sunt ehlt a plant specific la that is appropriate and that meets the spirit of the words in j the bracket. - All the 18 months is in brackets for ellow for 24 eenth fuel cycles. Also note that item "b" is in brackets and that the restriction on le0DE$ Is in brackets, if item "b" is appropriate for a plant, then the restriction on IIODES applies because performance of the BR would perturb the safety buses. Explain in Bases that if a plant's segaencer are designed such that this test can be performed without making e@lpment inoperable erul without porturbing the safety buses, then no le0DE restrictions apply. Unit Name 3.8 25 7/24/90

^ j s AC Sources o Operating l 3.8.1 } SURVEILLANCE REQUIREMENTS (continued) l l SURVEILLANCE FREQUENCY 1 SR 3.8.1.19 -- NOTES- - --------- All diesel generator starts may be preceded by prelube procedures as recommended by the manufacturer. 10 years Demonstrate both diesel enerators achieve the following vo tage and frequency in s (10] seconds when started simultaneously from standby condition: l a. Voltage 1(3744)voltsands(4576) . volts, and j b. Frequency 2 [58.8) Hz and 5 [61.2) Hz. r i t I e I l L l-i i l- ) 1 j l 1 1 L L l Unit Name 3.8 26 7/24/90 l 1

k -4 0-1 1 AC Sources - Operating 3.8.1 l ,,\\ L if Table 3.8.1 (Page 1 of 1) Diesel Generator Test Schedule t

NUMBER OF FAILURES Ci IN LAST 25 VALID TESTS (*)

FREQUENCY i fg[3 31 days 24 7 days *) (but no less than 24 hours) l (*) Criteria for determining number of failures and valid demands shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Rev. 3,. where the number of demands and failures is determined on a per diesel generator basis. fSR3.8.1.4,SR3.8.1.18,oriailure to satisfactorily complete: w=ve. % g

SR 3.8.3.1 through SR 3.8.3.10 does not' constitute a valid, failure and does not require an increased frequency of testing.
  • ) 'This test frequency shall be maintained until seven consecutive failure free star nd load run demands have been performed.

If subsequent to the seven fail e free tests one or more additional failures occur such that there are agai four or more failures in the last 25 tests, the testing interval .shall a in be reduced as noted above and maintained until seven consecutive failur -free tests have been performed. l 6 C b&yt3 Unit hame 3.8-27 7/24/90

l ). AC Sources Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown (* PENDING REVIEW OF THE BASES). LCO 3.8.2 The following AC Power Sources shall be OPERABLE: a. One circuit between the offsite transmission network and the onsite Class IE Power Distribution System of, and b. One diesel generator. c. When redundant loads are required to be OPERABLE, a third readily available AC Power Source, or other functional measures equivalent to a third AC Power Source such as an alternate shutdown cooling source, shall be OPERABLE. (Each L plant will discuss with the NRC staff what the required systems redundancy is and argue why not 3 out of 4 sources for each required redundant load.) ' APPLICABILITY: MODES 5 and 6. (VS GE: MODES 4 and 5.). When handling irradiated fuel [in the primary or secondary containment). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Suspend CORE Immediately AC Power Sources ALTERATIONS. inoperable. M Immediately A.2 Suspend handling (of irradiated fuel in the primary or secondary containment). M Udsh'ta acM% ko] A.3 gus>endoperations Immediately wit 1 a potential for draining the reactor a A.4 Suspend operations Immediately (V S-CE W> $)'y ; M involving positive reactivity & ) additions. (continued) i _ Unit.Name 3.8-28 7/24/90

o AC Sources - Shutdown 3.8.2 ACTIONS (continued) CONDITION REQUIRED ACTION COMPLETION TIME MD A.5// Initiate action to Immediately U restore required AC PowerSourcey-- [fh DPERhBd th* d.5.? rentinue "t hr, iv

'... M..y.. 0 -

n ; tere ::;;ir:d ^^ E Na, enwar taurces. i:rr~ -u

  1. 0;ivivv.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 Perform: As specified by applicable SR 3 8.1 1 th ough SR .8.1. SRs SR 3.8 1.6 rough 2.8.11 S. 3..l.1. SR 3 .l.16 and R .8. 18. ( SR 311.), srt 3.F.1, y) sR 3, g i, y) Q so.us/ s e,'9' I. i 5R 3. F,- ), J 7. j L Unit Name 3.8-29 7/24/90 1 1

Diesel Fuel and Lubricating 011 i 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel fuel and Lubricatina Oil (* PENDING REVIEW Of THE BASES) j l LCO 3.8.3 The diesel fuel oil subsystem shall be OPERABLE and lubricating i oil inventory shall be sufficient for each required diesel generator. APPLICABILITY: When associated diesel generator is required to be OPERABLE. SWUWT 2 99 e G k k C TIO A)S, SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel day tank 'and engine mounted 24 hours fuel tank) contains 1 [ J gallons of fuel 4 SR 3.8.3.2 Verify each fuel storage tank contains 2 [ 31 days l ) gallons of fuel l l SR 3.8.3.3 Verify lubricating oil inventory is 1 [ ] 31 days gallons Ont/ wi% ih 31 3 SR 3.8.3.4 Demonstrate that the flash point, gravity, m +=13., viscosity, and appearance of new fuel are prior to within limits when tested in accordance with addition of applicable ASTM standards or other standards new fuel to. I agreed upon between industry and NRC staff, storage l tank (s), i-I Unit Name 3.8 30 7/24/90 l L

Diesel Fuel .8.3 3.8' ELECTRICAL POWER SYSTEMS Diesel Fuel 1-2 ' ' '___:...s # 4 I 3.8.3 LCO 3.8.3 The diesel fuel oil subsystem shall be OPERABLE :'- ' for each required diesel generator. APPLICABILITY: When associated diesel generator is required to be OPERABLE. 1 i ACTIONS > i i COND _ITION REQUIRED ACTION COMPLET10,N TIME 4 hsel 1)l hour y A. Fuel le > [# m a A.1 Restore fuel level in day gallons <[900 fuel tank s) to 2 [ 900 )(gallons, gallons in one or more day tanks. "W;Pi Ny M MmW. dupe

_ 2 : ;;; > :;: f_'_.

W 3. Fuel transfer 3.1 Restore fuel transfer 44 our)( capability inoperable capability to OPERABLE for one op-eooe diesel

status, generatory ad s p.

\\ mL t 4.Fuellek 6.1 Restore fuel level in N 24 ours gallons pt < 32,000 storage tanks to gallonsinone[ormore) t[32.000) gallons. storage tanks. .>,g_, N avowmwtupmenuqueuses, 6 m h.. [.. 7 s w ur i m i.., .,r in. l l (continued) 3.s -3o A 'BWR/4 2. n.4 4/12/90

~ i + Diesel Fuel W ACTIONS (continued) ( '35 l CONDITION 1 REQUIRED ACTION COMPLETION TIME i r3 f Y Ven% WeW O _ $ k /)fw Fuel properties #weept I h ;t;rd-fuel properties W ha"rt _ en';r;;;;. t: ;ithir, h-ite, _. 'r l tI ?+=M1"yt!' tis *g fn g N-ected Ste ,q L " $ T.. M "itS i.. i'." Aes,ww%ge i E C _un / e h(f f Fuel celerat Restore fuel properties 30 s l stabili te ing to within limits. l propertie o not meat l. limits i e or more ,atorage ank i b M( i ~ (, Required Actions and $.1 Declars associated Imediately associated Completion y diestigenerator(s) Times not met, g inoperable. l l-Diesel fuel oil subsystem inoperable for reasons other than %p Condition A. B. C, D ( l h t- %0i>[A]-ual"

.ffici;r,t

'a ="aaa-+ anar=+4aa far f Ww 1 P^-^1*+i^= Yi-. - Nl0IE lSL

1.a. ;.ffici
t te n;;;rt ( $ ) dei. ef cer,tinovo. epe,etien.--

q i 'N b Y)k P2 O h 1.4/l )M b) ( tn mt m nton stm)e tsst=f, f

.6-SoG BWR/4

-3.S 20 4/12/90

4-Diesel Fuel and Lubricating 011 3.8.3 SURVEILLANCE REQUIREMENTS (continued) f SURVEILLANCE FREQUENCY SR 3.8.3.5 Demonstrate that the properties of new fuel, fthin31 days other than those in SR 3.8.3.4, are within following perkradedLL applicable ASTM limits.

dditi;i. vi ob t

f;;i-tv-S D 8 3.3, tre LM :ter:;; ti-E:. - SR 3.8.3.6 Demonstrate that the total particulate in 31 days stored fuel is less than 10 g / liter when tested in accordance with applicable ASTM standards. ~ SR 3.8.3.7 Check for and remove accumulated water from '31 days each storage tank. SR 3.8.3.8 Check for and remove accumulated water from '311days eachdaytank(andenginemountedtank) e SR 3.8.3.9 Demonstrate the fuel transfer system operates [92) days to [ automatically) transfer fuel from storage tank (s) to the day tank (and engine mounted tank). t SR 3.8.3.10 For the fuel subsystem: 10 years A. Drain each fuel storage tank i B. Remove the sediment from the storage tank C. Clean the storage tank Unit Name 3.8 31 7/24/90

o DC Sources Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources Operatina (* PENDING RE'.'IEW OF THE BASES) [ LCO 3.8.4 DC Power Source ; Division 1)'and DC Power Source ; Division 2) shall be OPERABLE. APPLICABIL11Y: MODES 1, 2, 3, and 4. (VS GE: MODES 1, 2, and 3.) i f ACTIONS CONDITION REQUIRED ACTION COMPLE110N TIME A. One DC Power Source A.1 Restore DC Power 2 hours i (Division) Source : Division) to inoperable. OPERABLL: status, i B. Required Action and. B.1 Be in MODE 3. (VS,BW,CE,W: 6 Associated Completion hours) Time not met. 6MD (VS GE: 12 hours) 6 B.2 (VS BW,CE W: Be in MODE 5.) (VS GE: Be in MODE 36 hours 4.) i t Some plants use the word train (or cther terminology) instead of divialen, Therefore, the word "Olvislana has been placed in brackets throughett this LCO. Unit Name 3.8 32 7/24/90

4 DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify each battery terminal voljage is 2 7 days (258/129) volts on float charge. SR 3.8.4.2 Verify no visible corrosion at terminals and 92 days connectors. DE Venly *Ahe connection resistance f,o( 0---" M ohms.)g1 and connectors is s (150 x 10 ) termin SR 3.8.4.3 Verify the cells, cell plates and battery 18 months racks show no visual indication of physical damage or abnormal deterioration. SR 3.8.4.4 Verify the cell to cell and terminal 18 months connectiopsareclean, tight,freeof (visible) corrosion and coated with anti-corrosion material t i l' (continued) I The above is a slightly different wording than was agreed upon. The $R used to reed: Verify the bettery terminet voltage t (258/129) volts on float charpe, taptain bests for this ruuber in the poses. The outer set of brackets startine et "of" and endire et "ohns" is to allow for plant specific differences. Crystal tiver 3 eweeats putting the word a lsibte v without brackets es en improvement. In a practice; the Licensee only tooks for visible corrosion, e.g., the licensee does not remove and took under each torstnel connectlen for corrosion. Unit Name 3.8 33 7/24/90

c. DC Sources - Operating i 3.0.4 SURVEllLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY Verify tahritttion SR 3.8.4.5 nornmirm1# resistance (of each cell to, cell 18 months ohms.]pminal connection is 1 (150 x10'6) and te [ T.n5 e rt X 4 ~ a SR 3.8.4.6 Demonstrate each battery charger will supply (18 months) 2 l'400) amperes at 2 [250/125) volts for 2 e [8] hours, i _2 ... a,, n - r ,, m _in MODES (FS-BW,CE3W: - 1,2,3,nd i) o e (T0*bL; I e 2, =d 3))-- - l " taptain bests for this number in the 8 eses. The outer set of brackets startire et "of" and ending at " ohms" is to attow for plant specific d l differences. " If this test can be donir with re leaDE restrictlens, then the correct fregancy is 18 months without brackets recordless of refueling intervet. If there are letzt restrictions that cause this SR to be done each refueline interval, tnen the correct frersuency is (18 months) (e.g., the 18 months is in brackets to allow for 24 month refueline intervets.) If Licensee h'es soere bettery charpers, they any be switched out and tested without M(Dt restrictions. Unit Name 3.8-34 7/24/90 J i

1 DC Sources - Operating 3.8.4 SURVEILLAN(.C REQUIREMENTS (continued) i j SURVEILL4X E FREQUENCY N j i./.:,.gfS--------------- SR 3.8.4.7 [ceper60mont . 'SR 3.8.4.8 may be 11 l !Y... 7 'T*[blmonstra5 battery capacity is adequate to(18 months) supply, and maintain in OPERABLE status, the S-required emergency loads for the design duty

nd nei cycle when subjected to a battery service 2,;

in "0 DES - g test . C E,"; -. - (p *>3, end--- 1,- 2, M 'US-GE. 4, 0,.nd 3) (continued) t l l Deser ioed profi(e moved to Bases. ' la months in brackets to allow for N month fuel cycles. l Unit Name 3.8-35 7/24/90 l-

i e DC Sources - Operating j 3.8.4 l 1 SURVEILLANCE RE0VIREMENTS j SURVEILLANCE FREQUENCY j I Att fi X@ I l SR 3.8.4.8 Demonstratethebatterycapacityis2(85%) 60 months i of the manufacturer's rating when subjected -to a performance discharge test. rd 2:1 Wa--,. in "^^i; ~ '"0 4,CE,W: +;t5,and g) -{"0-0C; ,b 2, nd 3) - t 6!iD ...... NOTE---- l Only i applicable (; whenbgttery shows degradation or has reached + [85%) of the expected life. [18 months) . a... A - in =%; h {"; %,CE,w: H- 'r,0,3, end 4) -{"0 Z ; C 2, una 3) e s Definition of bettery degradation moved to Bases. The more frequent fregaency saast be un'ed in lieu of the above fregJoney when bettery cepecity drops more then 10% of rated cepecity frem its everage on. previous performance tests or bettery cepecity is below 90% of the mermJfecturer's reting, or the bettery hos 3' _ reached or poseed 1851% of its espected life. la months in brackets to ellow N month fuel cycles. Unit Name' 3.8-36 7/24/90 L W.* y 1

DC Sources Shutdown 3.8.5 I 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 -DC Sources - Shutdown (* PENDING REVIEW 0F BASES) LCO

3. 8. 5 -

DC Power Source ' Division 11l l orshall be OPERABLE.

Division 2 DC Power Source APPLICABILITY

MODES 5 and 6. (VS GE: MODES 4 and 5) When handling irradiated fuel [in the primary and secondary containment). ACTIONS CONDITION REQVIRED ACTION COMPLETION TIME A. Required DC Power. A.1 Suspend CORE Immediately Source [ Division) ALTERATIONS. inoperable. 8!iD Immediatviy Suspendhandling[of A.2 irradiated fuel in the primary and secondary containment). 8!iD (continued) \\ 1 i i i Unit'Name 3.8 37 7/24/90

~ DC Sources - Shutdown 3.8.5 ACTIONS (continued) s CONDITION REQUIRED ACTION COMPLETION TIME hus'>i Ae m.n 4p] u A. (continued) A.3 end operations imediately wit 1 a potential for' draining the. reactor vessel. 8!iQ (Required action A.4 is A.4 Suspend operations immediately -VS W,CE,B&W:) involving positive reactivity additions. 6!!D A.5 Initiate action to. Immediately restore required DC Power Source to OPERABLE status, i f - l Unit Name 3.8 38 7/24/90 4

r (s a f DC Sotirces - Shutdown : t 3.8.5 SVRVEILLANCE REQUIREMENTS . SURVEILLANCE FREQUENCY L .SR '3.8.5.'l Perform SR.3.8.4.1 through SR 3.8.4.8.- According to SR 3.8.4.1 through SR 3.8.4.8 CROSS-

REFERENCES:

- To Re.eReviewed Later I TITLE NUMBER 1.- ECCS Trains _- Shutdown 3.4.3 1 2. A.C. Sources'- Shutdown 3.8.2 j } 1 1. f. C .t q I l

J

-l l 't l u L!s ,,1-4 I I I E Unit Name 3.8-39 7/24/90 i ' Y. I .m.

7._ Battery Cell Parameters'C"3 3.8.6 1 3.8 ELECTRICAL-POWER-SYSTEMS ~ 3.8.6 - Battery Cell Parameters (* PENDING REVIEW OF BASES)- q .LCO 3.8.6 DC Power Source battery cell parameters shall be within g limits. l APPLICABILITY: When associated DC Power Sources are required to be OPERABLE. ACTIONS i CONDITION. REQUIRED ACTION COMPLETION TIME L

  • A.

One or more cells in A.1 Verify the pilot I hour l one or more batteries cells' electrolyte not within limits. level and float voltage meet q ' Table 3.8.6-1 Category C allowable values. AliD A.2 Verify battery cell 24 hours parameters meet Table 3.8.6 Category,C allowable values. AtlD A:3 Restore battery cell' 31 days parameters to Category A and B limits of Tabl e ' 3.8.6 1. -...y B.- Required Actu 3 w d

,1 Declare associated Immediately associated Com it a..

DC Power Source r Times not met. inoperable. ist> ] OffR

  • f A P'ldt Ce))$ I.s Crystet River Lead plant feedback to that asettery tell Parameters" is a more descriptive title

- for this chapter then "Bettery Electrolyte." l Cryetal River Lead plant fee 6 eck is that it is preferable to move " 3 averageotectrolyte [ temperature of the pilot cells is 3 (60) 'F Information back to Table 3.8.6. That view la reflected here ] for NRC and Duners Groym consideration. Unit Name 3.8-40 7/24/90 l

f : n:.' , f;. h e 5V'* Battery Cell: ParameterdC"3' e -3.8.6 -- w ~ ' SURVEILLANCE REQUIREMENTS-3 y# SURVEILLANCE ' FREQUENCY: j SR:3.8.6;1. Verify battery cell parameters meet Table 7 days 1 3.8.6-1 Category A limits. s4 P SR 3.8.6.2 Verify battery cell parameters meet Table 92 days a 3.8.61 Category B limits. E 1 f Once within 24 hours / after a battery discharge /* below [110]. 1 volts i s 1;,, O h w* Once wi hin'24 ' hours after a ba tery overcharge. above-[150) volts l '), ~h ~ (i k-g s .g J' f*Te'dwo&+ktyU.ney, 95 ) h O l 'l -1 L WRC to hours, CG went 7 de, Crystet R r sugges hours se aupcomise, htC to 24 h s, OG6s 7 days, C tel River uggests 72 rs es e e omise. Unit'Name 3.8-41 7/24/90 or

,E. J Battery Cell Parameters'"3 1 =3.8.6 Table 3.8 6 (Page 1 of'l) Battery Cell Parameter Requirements ,g l L CATETORY A CATEGORY B CATEGORY C L Parameter Limits for Limits for Allowable Each Each Value for Designated . Connected Each Pilot Cell Cell -Connected l Cell-s Electrolyte > Minimum > Minimum Above top Level level.- level of plates, l indication indication and not mark, and mark, and overflowing 2 1/4" above-2 1/4" above . maximum level maximum level indication indication mark mark Float Voltage-2 2.13 volts") -2 2.13 volts") > 2.07 volts Specifig) i 1.200]") 2 (1.195] Not more than Gravity 0.020 below the average of all connected cells E l Average of all connected cells Average of all > [1.205] connected cells 2-(1.195]") I /verag A rage 'Averge Ele to te Te er ure ' Temp ature emperat e Te eratu l1 [6 ] " 2 (60]- 1 60]*. ............................... NOTES-------------------------- a. May be corrected for average electrolyte temperature, b. Corrected for electrolyte temperature and level, c. Or battery charging current is < [2] amperes when on float charge. l-I I Unit Name 3.8-42 7/24/90 l (.

e ;- Distribution Systems - Operating 3.8.7 Lp 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems. Operatina (*PENDING REVIEW OF BASES) LC0 3.8.7-Division 1 and Division 2 Power Distribution Systems shall be OPERABLE. er i.......................................NOT[.................................. {Two] inverters may be disconnected from their associated DC buses for s 24 hours to perform an equalizing. charge on associated battery banks, providing: -a. Associated AC vital buses are energized from their (Class IE] constant voltage source transformer, and b. AC vital buses for other battery banks are energized from their associated inverters connected to their DC buses. APPLICABILITY: MODES 1, 2, 3, and 4. (VS GE: MODES 1, 2, and 3.) ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME -A. One or more required A.1 Restore required DC 2 hours-buses, load centers, buses to OPERABLE o MCCs. or distribution

status, panels except AC vital buses, in one 68D.

Division inoperable. (continued) 1 Unit Name 3.8 43 7/24/80

n

c it
;(.._.e

[r, i l-Distribution Systems - Operating ~ 3.8.7- '[ ACTIONS (continued) f 3 CONDITION REQUIRED ACTION COMPLETION TIME .3 a A.2 Restore require AC x hours g buses, load centers, MCCs, and. (Where x hours _ distribution panels .is the most f to'0PERABLE status, limiting- ) completion time _ r of all the supported m 1-systems. Furthermore, x -is not to exceed 8 hours-t -if more than .i twofsystems"are made inoperable-because of;the distribution. system inoperability.]' 4 i 4 t -n t -}t i t V i r-t.. (' -UnitLName-3.8-44 7/24/80. g L i s.;

t. + Distribution Systems.- Operating-. f 3.8.7 ACTIONS (continued)i .CONDIT10N' . REQUIRED ACTION COMPLETION TIME B. One AC. vital bus B.1: Power AC vital bus 2 hours inoperable or not from its alternate powered from its . Class IE voltage associated-inverter

source, and DC bus.

MQ B.2 Power AC vital bus 24 hours from its associated inverter and DC bus. ~ r. C. Required Actions and-C.1 Be in MODE 3 6 hours associated completion (VS GE: 12 times not met.. MD hours) 0.2 Be in MODE 5 36 hours (VS GE:_ Be in MODE 4) (continued) 3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and 7 days-voltage'to required AC and.DC Power Distribution = Systems. [SR 3.8.7.2. Verify correct AC vital bus frequency. 7 days] i Unit Name 3.8-45 7/24/80

r e er. . Distribution Systems - Shutdown 3.8.8 -3.8 -ELECTRICAL POWER SYSTEMS .3.8.8, Distribution Systems. Shutdown (*PENDING~ REVIEW 0F BASES) LC0 3.8.8. Division 1 or Division 2 Power Distribution System lshall be '0PERABLE. o. APPLICABILITY: MODES 5 and 6. (VS GE: MODES 4 and 5) When handling irradiated fuel (in the primary or secondary containment]. t ALTEANATEWdRDING su LCO 3 .8 D ision or. Divi ion 2 Dis ribution ystem sha 1 be OPE BLE g. 1.requ red non. edundant PERABLE 1 ads shall e power fr a . N his di ision, n .............................N0TE -- --------- -.------ I Red ndant-unterpa t. loads r quired to be OPERABLE.are po ered rom th necessryportjonsofth redundan( division / If the neces ary ?

p rtions f the rydundant d) ision ar4 inoeprable; the a fecte i

cipmen, is inoperable, j/ / ..............y......... P l f. L-l t ~ Unit Name 3.8 46 7/24/90 I ll > o.'. i. 1

p wy -.: ' Distribution Systems - Shutdown: 3.8.8 L ACTIONS-E 1 CONDITION; REQUIRED ACTIONz COMPLET10N TIME. L 1 l 11 A. Onelor more-required


N0 E------

L ~ .MCCs, or distribution A.3 ti tie s all t-buses, load centers, Perfo man e o A.,. A. an L: t p . panel s ' inoperable, prec ud co le ion o J act ons to st lish a f co ser ati e c ndit on. q A.1 Suspend CORE Immediately-ALTERATIONS. AND .M A.2 Suspend handling of - Immediately 8 irradiated fuel (in .g L T thetsecondary containment]. Su e e }emed41rt1f1 h avy 1 s ,1 ra ia [u o J ggg h spend op&ckicMM i4fak A.h erations Immediately ith a potential ~for ) draining the. reactor. vessel. AND 1 b [.VS =CEjW; B j W[, A.Y ) Suspend operations - Immediately-i"'"I'i"' P Siti reactivity additions. j A.6/ Initiate action to Immediately L restore required [ G. buses o OPERABLE l statu / (continued) l M Ob8 CPt e Mg ) j l lUnitName 3.8-47 7/24/90

p-- .4 ei;e s DistributionSystems-Shutddwn 3.8.8 ACTIONS-(continued) CONDITION . REQUIRED ACTION COMPLETION TIME g. [onti ed) Altd V U A. Cont ue a ion Unt rq /ed-res ore r quire .b es a be b es 19 OPE LE st to 6 atus.&' PE 6

,statu.- /

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I:i Perform SR 3.8.7.1 he) $R 3,p,7,2, ] 7 days SR 3.8.8.1 1 1 i-I l 1 'l Unit Name 3.8-48 7/24/90}}