r VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH May YEAR 1982 i

i l

APPROVED:

?

. V

. STATION MANAGER (.)

i l 8207090035 820615 PDR ADOCK 05000338 R PDR i

g .

Ol'ERATING DATA REPORT DOCKET NO. 50-338 DATE 06-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 1
2. Reporting Period: May 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross NWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net NWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 3,623 34,944
12. Number of Hours Reactor Was Critical 289.5 3,129.9 26,958.2
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 204.5 3,022.9 26,375.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 463,553 7,941,328 68,255,580
17. Gross Electrical Energy Generated (MWH) 145,374 2,537,888 21,783,410 l 18. Net Electrical Energy Generated (MWH) 135,889 2,396,973 20,519,889 l 19. Unit Service Factor 27.5 83.4 75.5
20. Unit Availability Factor 27.5 83.4 75.5
21. Unit Capacity Factor (Using MDC Net) 21.1 76.5 67.9
22. Unit Capacity Factor (Using DER Net) 20.1 72.9 64.7
23. Unit Forced Outage Rate 47.5 7.3 5.1
24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

Fall Maintenance Outage 11-05-82 thru 11-15-82

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 08-03-82
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved l

INITIAL CRITICALITY

! INITIAL ELECTRICITY COMMERCIAL OPERATION l

L

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna 1 DATE 06-07-82 REPORT MONTH MAY COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective

^' I "

(Hours) Shutting 3

Down Reactor Report #

  • 4 *5 Prevent Recurrence 82-08 820501 F 30.3 A 1 NA NA NA Normal rampdown to repair SB feedwater heater, followed by a reactor trip while adjusting the trip set points of power range nuclear instruments.

82-09 820508 F 154.7 A 1 NA NA NA Normal rampdown and reactor shutdown. Perform mainten-ance in containment on S/G "C" manway and various valves.

82-10 820517 S 354.5 C 1 NA NA NA Normal rampdown and reactor shutdown due to noise in "A" steam generator. Cool-down and refueling outage commenced.

! 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other 5

G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 06-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH May i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 22 17 87 2 297 18 0 3 830 19 0 4 837 20 0 2

5 839 21 0 6 838 22 0 7 838 23 0 8 307 24 0 9 0 25 0 l

10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 7 30 0 1 15 216 31 0 16 544 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH May UNIT NAME NA-1 YEAR 1982 DATE 06-07-82 COMPLETED BY G. D. Schmitendorf 82-08 (A) (1) At 0000 on May 1,1982 the unit was at 50% power and continuing the rampdown, at 150 mwe per hour, to off the line for repair of the 5B feed water heater. The generator / turbine was taken off the line at 0241 with the reactor maintained critical in Mode 2. At 0934 an automatic reactor trip occurred. While adjusting the power range nuclear instrument trip setpoints a high flux rate trip was not cleared prior to exiting the channel. The trip occurred while adjusting and testing another channel due to the 2 of 4 logic being satisfied for the high flux rate trip.

82-09 (A) (1) At 0600 on May 8 with the unit at 100% power a rampdown, at 150 mwe per hour, followed by a normal reactor shutdown was commenced. The generator / turbine was taken off line at 1128. The reactor shutdown was commenced at 1627 by driving the control rods in placing the unit in Mode 3. The unit was taken to cold shutdown (Mode 5). The unit was shutdown in order to repair a manway on "C" S/G.

82-10 (C) (1) At 2320 on May 16 with the unit at 94% power a rampdown, at 150 mwe per hour, followed by a normal reactor shutdown was commenced. The generator / turbine was taken off line at 0530 on May 17. The reactor shutdown was commenced at 0647 by driving the control rods in; placing the unit in mode 3.The unit was shutdown due to "A" S/G loose parts monitor in alarm.

A decision was made to commence the refueling outage. The normal refueling outage had been scheduled to start on May 21.

e OPERATING DATA REPORT DOCKET NO. 50-339 DATE 06-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 2
2. Reporting Period: May 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative Hours In Reporting Period 744 3,623 12,815 11.

0 1,481.7 8,896.5

12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 46.4 1.679.6 0 1,437.1 8,667.2
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 3,727,204 22,510,045
17. Gross Electrical Energy Generated (MWH) 0 1,233,691 7,570,923
18. Net Electrical Energy Generated (MWH) 0 1,171,660 7,174,076 l

0 39.7 67.6

19. Unit Service Factor l

1 20. Unit Availability Factor 0 39.7 67.6

21. Unit Capacity Factor (Using MDC Net) 0 36.3 62.9 0 35.7 61.7
22. Unit Capacity Factor (Using DER Net) 0 7.1 16.9
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

1 Fall Maintenance Outage 10-15-82 thru 10-25-82

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 06-11-82
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY l INITIAL ELECTRICITY l COMMERCIAL OPERATION i

i l

~.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 06-07-82 REPORT MONTH May COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502

- ae YPel Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report # Prevent Recurrence 82-09 744 The scheduled refueling outage continues.

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other 5 G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 06-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 ~

2 0 18 0 ,

3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 , , ._.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

4