OPERATING DATA REPORT 50-247 DOCKET NO.

DATE 6/4/cz COMPLETED BY

__E.F.

Eich TELEPilONE (914) 526-5155 OPERATING STATUS Indian Point Unit No. 2 Notes

1. Unit Name:
2. Reporting Period: May, 1982
3. Licensed Thermal Power (MWt):

2758 1013

4. Nameplate Ra, ting (Gross MWe):

O

5. Design Electrical Rating (Net MWe):

885

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Si: ce Last Report lGive Reasons:
9. Power Level To Which Restricted.If Any (Net MWe):

c.

10. Reasons For Restrictions.lf Any:

This Month Yr.-to-Date Cumulative 3 623 69 408

11. Ilours in Reporting Period
12. Number Of Hour 5 Reactor Was Critical 3 355.95 45 677.48 0

51.08 1 578.51

13. Reactor Resene Shutdown liours
14. Ilours Generator On-Line 556.80 3 319.34 44 430.34 0

0 0

15. Unit Reserve Shutdown flours
16. Gross Thermal Energy Generated (MWil) 1 478 462 8 930 063 115 ? <! 4 638
17. Gross Electrical Energy Generated (MWH) 457 99.0.

2 807 080 35 646 396

18. Net Electrical Energy Cenerated (MWil) 436 201 2 690 396 33 975 054 i
19. Unit Senice Factor 74.8 91.6 64.0
20. Unit Availability Factor 74 R 41 6 Aa n
21. Unit Capacity Factor (Using MDC Neti 69.1 BG.3 56.9 67.2 85.1 56.1 l
22. Unit Capacity Factor (Using DER Net) 25.2 8.4 10.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):

Refuelina Outace -

Sentember 1982 l

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast.

Achieved

\\

INITIA L CRITICA LITY

\\

\\

INITIA L ELEC1 RICI FY

\\

\\

g','

\\

\\

COMMERCI A L OITR ATION ni l

l 8206220416 820615 PDR ADOCK 05000247 R

PDR (9/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 247 UNIT IP Unit No. 2 DATE 6/4/82 COMPLETED BY E.F.

Eich TELEPHONE (914) 526-5155 MONTH flay 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 3 826 37 174 2

837 18 0

3 834 0

9 4

838 20 0

5 640 21 0

6 609 22 0

7 839 23 0

8 854 24 0

829 9

25 662 0

8M 26 804 11 837 27 816 832 g,

28 813 13 831 29 822 14 837 30 448 15 824 31 817 16 832 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to the nearest whole rnegawart.

(9/77)

~ -

i l

50-247 UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME I.P. Unit No. 2 DATE 6/4/82 COMPLETED BY E.P.

Eich REPORTMONTil May 1982 TELEPHONE f 914);?6-si c.;

i w.

2 eu E E

c ee i

.E e E

-> s "4 Licensee

= %,

k4 Cause & Conective No.

Date

(

3g g

,g g y Event 3T l

Action to c$ 5 5

j5g Report as s50 0

Present Recurrence 6

1 N/A 5/5/fs2 F

O D

4 82-017-OlT SG Blower Reduce load due to CCR ventilation requirements 3

5/17/82 F

179.45 G

3 N/A ZZ ZZZZZZ See Summary of Operating Experience 4

'5/24/82 P

3.75 A

3 N/A CII

!!TEXCH 22 S/G High Level F

5 5/30/82 F

4.00 A

3 N/A CH Pump XX 22 Main Boiler Feed Pump Trip B

i i

2 3

4 F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LERI File tNUREG-D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & Ucense Examination F-Administ rative 5

G-Operational Ee ror (ExplJin)

Exlubit 1 Same Source 19/77) 11-O her(Explaint

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-247 Date:

4/12/82 Completed by:

J. Curry Telephone:

(914) 526-5235 Indian Point No. 2 began the month of May, 1982 operating at 100% reactor power.

At approximately 2:20 P.M. on Wednesday, May 5, a controlled plant shutdown was initiated due to failure of equipment associated with the control room air conditioning / filtration system.

Concurrent with the load reduction, repairs were successfully completed and the shutdown process was terminated at approximately 25% reactor power.

Unit output was then increased to the 100% reactor power level on May 6.

Unit No. 2 tripped automatically from full load at 5:40 A.M. on Monday, May 17.

The initiating cause of the trip was perturbation in the feedwater system that was induced in the course of investigating a problem with the containment weld channel and piping penetration pressurization system.

Shortly after the unit trip, No. 23 motor driven auxiliary boiler feedwater pump was removed f rom service to investigate and correct the cause of an overheated pump thrust bearing.

I I

Subsequently, No. 22 turbine auxiliary boiler feedwater pump was removed f rom service on Wednesday, May 19, due to governor control oscillations.

Investigation revealed overheating of both the turbine governor and pump end bearings. With two of the three auxiliary feedwater pumps out of service, the reactor coolant temperature was reduced to less than 350 F in accordance with station operating procedure.

Following completion of repairs to Nos. 22 and 23 auxiliary boiler feedwater pumps, Unit No. 2 was returned to service at 5:07 P.M. on Monday, May 24.

Approximately one hour later, the Unit tripped automatically due to high level in No. 22 steam generator.

The Unit was again synchronized to the bus at 10:00 P.M. and output raised to the 100%

reactor power level on May 25.

Unit No. 2 tripped automatically at 7:45 A.M. on Sunday, May 30 as a result of a spurious trip of No. 22 main boiler feedwater pump.

The Unit was returned to service at 11:45 A.M. that same day and the unit output raised to the 100% reactor power level.

1 l

l

't

j l\\

l(>

li\\\\l 1lllilIllllj 7

4 2

0 5

y b

o de2 N

en8 t o9 t

eh1 e

l p

  • pe tt c

ml y o*oea D

CTM ECN A

W R

E O

T F

N I

D A

E M

TR L

O A

P2 C

E8 I

R9 R

1 T

S C

M O

E EY L

TA E

I M D

EF N

LO A

BAD L

CO A

I I C

LR I

PE N

PP A

A E I

IC OH E

NT M

2 o

N t

in U

tn i

o P

na i

dn I

1 llt I1lll

,1lll 1:llll'

!l l

l l