Forwards IE Insp Repts 50-438/82-03 & 50-439/82-03 on 820209-12 & Notice of Violation
ML20054D752
Person / Time
Site: Bellefonte  
Issue date: 03/05/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20054D743 List:
References
NUDOCS 8204230350
Download: ML20054D752 (2)


See also: IR 05000438/1982003

Text

)

~

^

g//oa,

.

_

!

!

l

i

l

MAR 0 51982

r

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nosh 438/82

50-439/82-03

This refers to the routine safety inspection conducted by Mr. R. W. Wright of

this office on February 9-12, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility.

Our preliminary

j

findings were discussed with Mr. W. R. Dahnke, Project Maager, at the conclusion

of the inspection.

[

Areas examined during the inspection and our findings are discussed in the

l

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

j

personnel, and observations by the inspector.

i

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

,

requirements are listed in the Notice of Violation enclosed herewith as

,

!

Appendix A.

Elements to be included in your response are delineated in

l

Appendix A.

We have examined actions you have taken with regard to previously identified

i

j

enforcement matters. These are discussed in the enclosed inspection report.

f

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

1

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

.

date of this letter. Such application must be consistent with the requirements

I

of 2.790(b)(1).

j

The responses directed by this letter and the enclosures are not subject to the

j

clearance procedures of the Office of Management and Budget as required by the

j

Paperwork Reduction Act of 1980, PL 96-511.

!

N

i

3204230 3 65

- - - . - -

. . - - - - - . . - -

-

..

_

-

-

- . - - . ~

-

.. -..-.

.-

,.-

.r

-

MAR 0 51982

Tennessee Valley Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-438/82-03,

50-439/82-03

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

Review Staf f

bcc w/ encl:

Document Management Branch

State of Tennessee

NRC Resident Inspector

R

I

RII

,

RII

.

RII

RWWright:es

CMUpright

ARHe dt

RVCr e jak

FSCantrell

/ S/82

/82

/82

}/

82

/82