Interim Deficiency Rept Re GE Switchgear Parts Not Certified by Subsuppliers for Nuclear Use,Initially Reported 820311. Evaluation of Condition & Submittal of Final Rept Expected 820622
ML20054D670
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/07/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20651-GHD, NUDOCS 8204230257
Download: ML20054D670 (3)


Text

Docket Nos. 50-528/529/530

. T' ',

FJ

$0 55(e) Report

/

MN L F JU i.ETla8 V m 3 2 M C D d C@3NRJ P. O. BOX 216 6 6 PHOENIX, ARIZON A 85036 April 7, 1982 ANPP-20651-CHD/BSK A

U. S. Nuclear Regulatory Commission

,o s ' D, Region V Creekside Oaks Office Park 8

1450 Maria Lane - Suite 210 REC 2fygD Walnut Creek. California 94596-5368 Attention: 'Mr. T. W. Bishop, Chief

'g bh2b NumerQ Reactor Construction and Engineering Support Branch IEC fj 4

Subj ect:

Interim Report - DER 82-8

. h.4 1

A 50.55(e) Potentially Reportable Deficiency Re o

GE Switchgear Has Parts Not Certified by Subsuppliers for Nuclear Use File: 82-029-026 D.4.33.2

Reference:

Telephone Conversation between T. Bishop and G. Duckworth on March 11, 1982

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by June 22, 1982, at which time a complete report will be sub-mitted.

Very truly our,

CLLL SLLL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske vi t'o,,,

f Attachment

//...,,.

~

  • 4;j cc:

See Attached Page 2 s204980 % C 6g V

[2 'f]

.. f U. S, Nuc1cgr gagulatory Commission Attention:

Mr.

T. W. Bishop, Chief ANPP-20651-GHD/ESK April 7, 1982 1

i Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Ccmmission Washington, D. C.

20555 L

J. A. Roedel D. B. Fasnacht G. C. Andognini 4

A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General c

Bataan Memorial Building Santa Fe, New Mexico 8:303 l

Hb. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 I

4

j

. r'.

INTERIM REPORT - DER 82-8 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2 AND 3-I.

Potential Problem Section 4.12.3 of Specification 13-EM-009 requires the supplier to certify that the equipment has been manu-factured in compliance with an applicable QA program and that the equipment meets the requirements of the procurement documents.

Section SA.4.3 requires the supplier to initiate. Supplier Deviation Disposition Requests so that the project is informed of and participates in all deviations.

Contrary to the above, installed components to switchgear equipment supplied and certified by General Electric to Purchase Order 13-EM-009 were later identified by General Electric as not in compliance with the specification because vendors supplying component parts to General Electric refused to certify certain parts for Nuclear use.

II.

Approach To and Status Of Proposed Resolution Bechtel has requested assistance from General Electric in j

evaluating and dispositioning this item.

III.

Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report are forecast to be completed by June 22, 1982.