MAY 121932
Docket No. 50-333
Power Authority of the State of New York
James A. Fit: Patrick Nuclear Power Plant
ATTN:
Mr. Corbin A. McNeill, Jr.
Resident Manager
P. O. Box 41
Lycoming, New York 13093
Gentlemen:
Subject:
Inspection No. 50-333/82-09
This refers to the routine safety inspection conducted by Dr. Jin W. Chung
of this office on April 19-23, 1982 at James A. Fitzpatrick Nuclear Power
Plant, Scriba, New York of activities authorized by NRC License No. DPR-59
and to the discussions of our findings held by Dr. J. W. Chung with
Mr. C. A. McNeil and other nembers of your staf f at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and repre-
sentative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this
office, by telephone, within ten days of the date of this letter and submit
written application to withhold information contained therein w; thin thirty
days of the date of this letter.
Such application must be consistent with
the requirements of 2.790(b)(l).
The telephone notification of your intent
to request withholding, or any request for an extension of the 10 day
period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
OFFICIAL RECORD COPY
\\
,o
\\
F206030234
03 3
PDR ADOCK 0
C
.
.
FitzPatrick Nuclear Power Plant
2
No reply to this letter is required.
Your cooperation with us in this
matter is appreciated.
Sincerely,
original Sist oa Sy
hwf
-
homas T. Martin, Director
5 Division of Engineering and Technical
Programs
Enclosure:
NRC Region I Inspection Report Number 50-333/82-09
cc w/ encl:
L. W. Sinclair, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Vice President - Quality Assurance
M. C. Cosgrove, Quality Assurance Superintendent
J. F. Davis, Chairman, Safety Review Committee
C. M. Pratt, Assistant General Counsel
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bcc w/ encl:
Region 1 Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
H. B. Kister, CPRP
%
RI:DETP3p
RI:DETPyjfL RI:DE'P
Chung:as *x
Bettenhausen
Ebne er
it/$/82
5/g
( l( 3,
0FFICIAL RECORD COPY