Docket Nos. 50-528/529/530
.s l
40 50.55(e) Report i
1
.. A,
1.PUiWlnWD M13BDiN$ CDMrM M WM PHOENIX. ARIZON A 85036 P. O. BOX 216 6 6 May 6, 1982 ANPP-20905-GHD/BSK U. S. Nuclear R."galatory Commission Region V y C.C.
Creekside Oaks Office Park fG g 1450 Maria Lane - Suite 210
$Y 13 g Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop, Chief Reactor Construction Projects Branch Subj ect:
Interim Report - DER 82-14 A 50.55(e) Potentially Reportable Deficiency Relating to Units 1 and 2 Instrument Installation Bolting Procured To ASME III Code Was Used Without Issue Control File:
82-019-026 D.4.33.2
Reference:
Telephone Conversion between J. Eckhardt and G. Duckworth on April 8, 1982
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) j days.
Due to the extensive investigation and evaluation required, an Interim l
Report is attached.
It is now expected that this information will be finalized by July 7, 1982, at which time a complete report will be j
submitted.
Very truly your f E cut -d b l
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director i
.EEVBJr/GHD:ske Enclosure cc:
Sc. Attached Page 2 820526001 4f 71Do
U. S, Nuclear gagulatory Commission Attention:
Mr.
T. W. Bishop, Chinf ANPP-20905-GHD/BSK May 6, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Euforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht C. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson
~
L. E. Vorderbrueggen G. A. Florelli R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Pe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 l
l
t INTERIM REPORT - DER 82-14 POTENTIAL REPORTABLE DEFICIENCY-ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNCS UNITS 1 AND 2 I.
Potential Problem A Field Engineering review of the installation documents for compliance with ASME III NF requirements revealed that some of the bolting material used throughout Units 1 and 2 instru-ment installations is indeterminate.
Th'e bolting material was procured to NA-3766.6 e
(1) and (4), but issuance to field use was not controlled in accordance with NA-3766.3(b).
e Code Case 1644-7 allows use of ASTM A-307, Grade A, bolts; however, once the bolt is withdrawn from the marked box, it loses its traceability to the C of C because each indi-vidual bolt is not marked by the supplier.
II.
Approach To and Status Of Proposed Resolution This condition is being evaluated by Bechtel-Engineering and Construction.
Currently, only bolting material which has a die mark, identifying it as being provided by an authorized Code supplier, is being installed.
III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by July 7, 1982.