ML20050C865

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-333/81-23 on 811007-10 & 11-13. No Noncompliance Noted
ML20050C865
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/26/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20050C870 List:
References
NUDOCS 8204090424
Download: ML20050C865 (2)


See also: IR 05000333/1981023

Text

-

-

, ., . w e

s

a

6

BAR 2 6 1982

Docket No.

50-333

,@

N

f

dN

2.

Power Authority of the State of New York

/

t[( y.'N 'gj:'A

!

F

James A. FitzPatrick Nuclear Power Plant

-

h? @.pfj'jo $

ATTN: Mr. Corbin A. McNeill, Sr.

3

Resident Manager

-

P. O. Box 41

{

g,pgj

Lycoming, New York 13093

,A

q

b/

\\

Gentlemen:

'W

W

Subject:

Inspection 50-333/81-23

This refers to the routine, safety inspection conducted by Messrs. John R. White

and D. J. Collins of this office on October 7-10 and November 11-13, 1981 of

activities authorized by NRC License No. DPR-59 and to the discussions of our

findings held by Mr. White with Mr. John D. Leonard at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr. White and Mr.

Eric Mulcahey on November 20, 1981.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by ',he inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Your cooperation with us in this matter is appreciated.

Sincerely,

W

/

T

as T. Martin

irector

Division of Engineering and

_ 7

Technical Programs

gL; /

M f ,,

iM

RI:0ET

RI:DETP

RI:DETP

F

P

.

White / gwc

Collips

Kn

(

bL bb

rlb

3/).5/82

3l2sl$1

0 FICIAL RECORD COPY

- -Oh

8204090424 820326

DR ADOCK 05000

JC

.

.

_ . . . . _

-

. _ ._

--

._.

-__

_

.

_ - - -

.-

_

.

.

i

Power Authority of the State of New York 2

RAR 2 61962

Enclosure: NRC Region I Inspection-Report Number 50-333/81-23

cc w/encls:

!

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

1

A. Klausmann, Vice. President - Quality Assurance

M. C. Cosgrove, Quality Assurance Superintendent

J. F. Davis, Chairman, Safety Review Committee

!

C. M. Pratt, Assistant General Counsel

1

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

i

State of New York

i

bcc w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

,

Director, DPRP

,

.

I

l

.

1

1

4

0FFICIAL RECORD COPY

i

i

,_

-.

. . .

. . . - - .

.

. . -

-

__.

. . _ . _ _ _ . ,

, -- , , - , _ _ .

.

. , . , - - .

_-,

-