4 MAINE YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-6 FOR TiiE MONTH OF JUNE, 1981 8204090376 810710 PDR ADOCK 05000309 R
PDR l
OPERATING DATA REPORT DdC'KET NO. 50-309 DATE 810710
~
COSIPLETED BY D. M. Bernard TELEPliONE 617-872-8100 X2390 OPERATING STATUS
- 1. Urd Name:
Maine Yankee Notes June, 1981 Power 1cvel restricted by
- 2. Reportin: Period:
2630 steam flow through the low
- 3. Licensed Thermal Power (51Wt):
864 pressure turbines.
- 4. Nameplate Ratin;(Gross.\\lWe):
825
- 5. Desi;n Electrical Ratin;(Net SIWE):
850
- 6. Sf aximum Dependable Capacity (Gross 51We):
810
- 7..%Isximum Dependable Capacity (Net SIWE):
- 8. If Chan;es Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
a
~ 9. Power les el To Which Restricted,If Any (Net 51We):
864 MNe (%970 See Notes
- 10. Reasons For Restrictions. If Any:
This 5fonth
.Yr.. :o.Da t e Cumulative 720.00 4.343.00 II. Ilours In Reportin; Period
- 12. Number OfIlours Reactor Was Critical 0.00 3.065.17 60.821.14
- 13. Reactor Reserse Shutdovm flours 0.00 0.00 0.00 58.923.33
- 14. Ilours Generator On Line 0.00 3,065.08 0.00 0.00 0.00
- 15. Urdt Reserve Shutdown Ilours 0.00 7.801.293.00 _-127.179.522.00
- 16. Gross Thermal Energy Cencrated (alWil)
- 17. Cross Electries! Ener;y Generated (.\\lWil) 0.00 _ _.
2.587.760.00 -
41.789.920.00
- 18. Net Electrical Ene ;y Generated (51Wil) 0.00 2.471.275.00
_39.702.600.00 0.00 70.58_
77.79
- 19. Unit Service Tactor 0.00 70.58 _
77.79
- 20. Unit Assi! ability Factor 0.00 70.25 67.53
' 21. Urdt Capacity factor (Usin; 51DC Net) 0.00 68.97__
65.40
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit forced Outa e Rate 0.00 0.00 7 17
- 24. Shutdowns Scheduled Over Nest 6 Slonths (Type. Date.and Duration of Eacht:
N0ne July 21 1981
- 25. If Shut Down At End Of Report Period Estir.isted Date of Startup: -
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY C051.\\lERCI 4 L OPER ATION
"(Q/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-309 UNIT Maine Yankee DATE 810710
~
~
COMPLETED BY D. M.
Bernard 617-872-8100 X2390 TELEPHONE MONTl!
JUNE. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 0 37
)
1 2
18 3
19 4
4 20 5
21 6
22 7
23 8
24 9
25 10 26 II 27 12 28 13 29 l
14 30 V
15 31 16 N/
INSTRUCTIONS On this formst. list the average daily unit power leselin MWe Net for es:h day in the reporting month. Compute to the nearest whole megawatt.
19/77) e
,-y
,y.
--,--em r-.
+ -
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-309 UNIT NAME Maine Yankee DATE 810710 REPORT A!ONTig JUNE, 1981 COMPLETED 11Y D. M. Bernard TELEPil0NE 617-872 8100 X2390 e.
,!E
.Y4 Licensee E r, Cause & Gutective N. i.
Date g
3g jjs Event g?
e3 Action in H
fE 5, 35y Report
- mo gu Prevent itecurrence
=
Q Core 5/8/81 S
720 C
1 NA ZZ NA Shutdown for 1981 refueling outage 5/6 Core 5/6.
1 i
i 2
3 4
F: Fins ed Iteason:
Meilnid:
Exhibit G Instructions S: Sdicduleil A Equipment Failure (Explain) 1 Manual for l'icparation of Data II. Maintenance niTest 7-Manual Scrain.
Entry Shecis for Licensee C Itefueling 3 Automatic Scram.
Event Itepori (Ll!!t) File INUlti'.G-D Itegulatoiy Itestriction 4 Other (Explain) 0161) li Opciator Tsaining & License Examinailon I: Ailminisseative 5
G Operational I.is.. (linplain)
Exluleit I Same Souru l'r/ 77)
Il Othes (limplain)
,. s DOCKET NO.
50-309 UNIT Maine Yankee DATE R10710 COIPLETED BY D. N. Bernard TELEPif0NE 617-872-8100 X2390 REPORT MONTH JUNE, 1981 SU't!ARY OF OPEPATING EXPERIENCES The plant was in a shutdown status on June 1 for Core 5/6 refueling outage and remained shutdown through the end of the month.
t 4
e