.A Beaver Valier Power Station Stuppmgport. PA 15077-0004 a
August 6, 1993 JOHN D. SIEBER (412) 393-5255
[
Seruot Vice President and Fax (412) 643-8069
-l ChWf Nuclear Officer i
Nuc. ear Power Division U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Revised Response to NRC Bulletin 93-02:
Debris Plugging of Emergency Core Cooling Suction Strainers Attached is a
revised Duquesne Light Company (DLC) response to Nuclear Regulatory ' Commission (NRC)
Bulletin No.
93-02,
" Debris Plugging o f. ' Emergency Core Cooling. Suction Strainers."
The original response was provided by. letter dated June 10, 1993.
This response has been revised to correct the volumes-of certain fibrous' air filters located in the Beaver Valley Power Station (BVPS) Unit'No. 1 l
and No. 2 primary containments.
Although the volumes of fibrous material present in-the primary containments are greater than' originally reported, they.are still considered to be. adequately installed and confined and.will not be dislodged during a Loss of Coolant Accident (LOCA).
No compensatory 1 1
t action is necessary to address the presence of these materials'in containment.
If you have any questions concerning this
- response, please contact-Drexel Williams at (412) 393-5226.
Sincerely, k{
J.
D.
Sieber Attachment cc:
Mr. L. W.
Rossbach,-Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. G. E. Edison, Project Manager 120070 9308130061 930906 33 l
PDR ADOCK 05000334 l
0 PDR
w.
/
. AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA)') SS:
COUNTY.OF BEAVER
)
L
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 q
BV-1 Docket No. 50-334, License Eo. DPR-66 BV-2 Docket No. 50-412, License'Eo. NPF-73
.j Revised Response to NRC Bulletin 93-02:
Debris Plugging of Emergency Core Cooling Suction Strainers-d 1
~
Before me, the undersigned notary public, in and for.the County' and Commonwealth aforesaid, this day personally ~ appeared John D..
Sieber,. to ~
known, who being duly sworn according'to'. law, deposes.
.t me and says. that 'he is Senior Vice President and Chief Nuclear Officer l{
of the Nuclear Power
- Division, Duquesne Light. Company, he is duly.
authorized to. execute' and file the foregoing submittal on behalf:of r
said
- Company, and-the statements set forth in the. submittal are:true
-and correct to'the best of his knowledge, information and belief.
1 Q
f) AA a
%.J
^
John D.:Sieber
/
. Subscribed and sworn.to'before me d(/
on'this day of ~
/
~
-l 1 lb b
QW/7D d
Notary Putilic[
~
manaisent.
' SteiaM.Fauore.NotantPublic
' i SNpprgpon Boro BemerOwW My Conmmon EdesSept 26.1994
.j Mmtzr Permwwm4=nessunuiisaanse z V
f;
'l
^
DUQUESNE LIGHT COMPANY Nuclear Power Division i
ATTACHMENT Response to NRC Bulletin 93 Debris Pluaaina of Emeraency Core Coolina Suction Strainers t
Reauested Actions Identify fibrous air filters or other temporary sources of fibrous material, not-designed to withstand a LOCA, which are installed or stored in your primary containment.
BVPS Unit 1 It has been determined through design reviews that the only fibrous air' filters permanently installed in primary containment are the Containment Iodine Filtration System pre-filters and High Efficiency Particulate Air (HEPA) filters (VS-FL-10, 11, 13 and 14),
the Post Design Basis Accident (DBA) Hydrogen Control System sample filters (HY-FL-3A, 3B, 3C and 3D) and the Containment Instrument Air System filters (IA-FL-5A, SB, 18A and 188).
No other temporary sources of fibrous material have been identified as being installed or stored in_ the primary-containment.
BVPS Unit 2 i
It has been determined through design review that the only fibrous air filters permanently installed in the primary containment are the Containment Iodine Filtration System pre-filters and HEPA filters (2HVR-FLTA210A, 210B, 212A and l
212B).
No other temporary sources of fibrous material have been_ identified as being installed or stored in the primary containment.
l l
Reauested Actions Take any immediate compensatory measures which may be required to assure the functional capability of the Emergency Core Cooling System (ECCS).
BVPS Unit 1 The station was in a refueling outage (i.e., ECCS not required to be operable) at the time. the bulletin was issued. Thus, it was unnecessary to take any specific short term action to address ECCS operability because of this specific issue-until a permanent correction could be' implemented.
BVPS Unit' 2
=The design of the Containment Iodine Filtration System has been reviewed. The-L fibrous filters -(2HVR-FLTA210A, 2108, 212A and 2128) are adequately installed and confined and would not become dislodged following a LOCA.
No compensatory _ actions-are required to assure the functional capability of the ECCS.
.)
~
~
Attachment i
Response to NRC Bulletin 93-02 Page 2-Recuested Actions l
Take prompt action to remove any such material.
Because of the low probability of a LOCA event, the staff considers removal of this material at the next shutdown, or within 120 days, whichever comes first, to be j
sufficiently prompt.
If the facility is currently in a shutdown, you are requested to remove such material prior to restart.
BVPS Unit 1 It has been determined by a design review and system walkdown that the Containment Iodine Filtration System HEPA filters (VS-FL-11 and 14); are-adequately installed and confined and would not be dislodged following a LOCA.
1 No action or removal is required for these filters.
Since the Containment-Iodine Filtration System prefilters (VS-FL-10 and 13) were not adequately contained a Design Change Package was implemented for removal of the prefilters (VS-FL-10 and
- 13) prior to the Station entering Mode 4 (Hot Shutdown).
This action is complete.
The review of the Post DBA Hydrogen Control System sample filters (HY-FL-3A, 3B, 3C and 3D) design determined they would not be sprayed on by the quench or recirculation spray.
Since they are in-line filters and would not be dislodged-following a LOCA, no action (removal of these filters) is required.
j The review of the Containment Instrument Air System filters (IA-FL-5A, 58, 18A and 18B) design determined that since they are in-line filters they would not be wetted ~ or dislodged following a LOCA ard thus, no action (removal of these-filters) is required.
BVPS Unit 2 The review of the Containment Iodine Filtration System pre-filters (2HVR-FLTA210A and 210B) and HEPA filters (2HVR-FLTA212A and 2128) designs determined that these filters are adequately installed and confined and would not be dislodged following a LOCA. No action (removal of these filters) is required.
Reportina Recuirements 1.
Within 30 days of the date of this bulletin, a written response stating whether the actions requested above have been or will be performed.
If the use of such material is identified, this written response shall also' include the locations and quantity of use, any immediate compensatory measures taken, and the current schedule for removal of the material.
Attachment Response to_NRC Bulletin 93-02 Page 3-
-DVPS Unit 1 BVPS Unit I has removed the fibrous air filters (VS-FL-10 ano' 13) that could have been dislodged during a LOCA. This action was completed before entering Mode 4 i
at the end of the ninth refueling outage.
It has been identified that other fibrous air filters (VS-FL-11 and 14; HY-FL-3A, 3B, 3C and 3D and IA-FL-5A, 58, 18A and 18B) are located in primary containment and it has been determined, by i
review of the designs of the systems, that these fibrous air filters will not be dislodged during-a LOCA.
No compensatory actions are required to address their presence in primary containment. No temporary sourcec of fibrous material have been identified as installed or stored in primary containment. The removal of temporary sources of fibrous material from primary containment is adequately addressed in the existing procedures for containment walkdown and closeout prior to a startup and no further action is required to adaress temporary fibrous materi al.
The quantities and locations of the fibrous air filters in primary containment are indicated below:
i i
Name and Mark No.
Locations Ouantities 3
Size (in.)
Vol(ft )
Containment Iodine Filtration System Pre-filters (VS-FL-10 and 13)
El.692'-11" 24x24x12 16 total
- l each (2 filters /
assembly)
HEPA Filters (VS-FL-11 and 14)
El.692'-ll" 24x24xil.5 15.2 total l
I each t
(2 filters /
assembly)
Post DBA Hydrogen Control System Containment Dome Sample Filters El.720'-6" 5DIAx18
.4 total (HY-FL-3A and 3C) each Przr. Cubicle Sample Filters El.720'-6" 5DIAx18
.4 total l
(HY-FL-3B and 3D) each l
Containment Instrument Air System Compressor Filters (IA-FL-5A and 5B)
El.692'-11" 100.D.x7.51.D.
.1 total-x2.75 each Air Filters (IA-FL-18A and ISB)
E1.692'-11" 4DIAx17.25
.25 total-each I
- Have been removed, f
L h
Attachment Response to NRC Bulletin 93-02 Page 4' BVPS Unit 2 It has been identified that the Containment Iodine Filtration System pre-filters and HEPA filters. (2HVR-FLTA210A,
- 210B, 212A and 2128) are the only fibrous air filters in primary containment.
A review of the design of the system has determined i.nese filters will not be dislodged during a LOCA. No compensatory action is needed to address their presence in primary containment. No temporary i
sources of fibrous material have been identified as installed or stored in primary j
containment.
The removal of temporary sources of fibrous material from primary t
containment is adequately addressed in the existing procedures for containment l
walkdown and close out prior to a startup and no further action is required to address temporary fibrous material.
The quantities and location of the fibrous air filters in primary containment are indicated below:
Name and Mark No.
Locations Quantities i
3 i
Size (in.)
Vol(ft )
Containment Iodine Filtration System Pre-filters (2HVR-FLTA210A El.692'-ll" ll.75x24 70.2 total l
l and 2108) x23.87 each (9 filters /
assembly)
HEPA filters (2HVR-FLTA212A El.692'-11" 24x24x12 72 total l
and 2128) each (9 filters /
assembly)
Reportino Reauirements 2.
Within 30 days of completion of the requested actions, a report confirming completion.
BVPS Unit 1 All actions required have been completed.
No further action is planned to address this bulletin.
EVPS Unit 2 All actions required have been completed.
No further action.is planned to address this notice.
Reportino Reouirements.
3.
If the addressee proposes not to take the actions rcquested in this bulletin, provide to the NRC staff, within 30 days of the date of this bulletin, your i
proposed alternative course of action and a justification for any deviations from the requested actions.
j
.~
1
~
L.-
L Attachment l.
Response to NRC Bulletin 93-02
'.Page > 5 '
l l
BVPS Unit 1 Since the fibrous air filters (VS-FL-10 and 13) which could be dislodged during a I
LOCA have been removed, BVPS Unit I has complied with the actions requested by this bulletin.
The remaining fibrous air filters in primary containment will not j
be dislodged during a LOCA and need not be removed.
No temporary sources of j
l fibrous material were installed or stored in primary containment. All actions are complete. No alternatives are proposed and no justifications are required.
BVPS Unit 2 The system design has been reviewed and it has been determined that the fibrous air filters (2HVR-FLTA210A, 2108, 212A and 2128) located in primary containment will not be dislodged during a LOCA.
No temporary sources of fibrous material were installed or stored in primary containment. All actions are complete and no 1
alternatives are proposed and no justifications are required.