Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 1 Core Operating Limits Rept for Fuel Cycle 15, for May 1993
ML20044F578
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/21/1993
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044F579 List:
References
HL-3314, NUDOCS 9305280274
Download: ML20044F578 (2)


Text

Georgia Power Company 40 invemess Center Parkway Post Office Box 1295 .

Birmingham, Alab:ma 35201e Telephone 205 877 7279 m

J. T. Beckham, Jr. Georgia Power Vce President - Nuclear Hatch Project tN soutvm awvc system May 21, 1993 Docket No. 50-321 HL-3314 005464 ,

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 15 Core Operatina Limits Report Gentlemen:

By Amendment 168 to the Unit 1 Technical Specifications, the NRC authorized relocation of certain fuel-related limits from the Technical Specifications to the adjunct Core Operating Limits Report (COLR). This letter transmits an information copy of Revision 1 of the COLR for Hatch 1 Cycle 15.

Revision 0 was issued on May 6, 1993, with a typographical error on figure 3-8, " Average Planar Linear Heat Generation Rate Limit vs. Average Planar Exposure," for fuel type GE13LUA at an exposure of 35 GWd/st. Since all-fuel bundles of this type were new when installed in the Unit 1 cycle 15 core, this exposure will not be reached during this cycle, and this error could not have had any impact on safety. The correct thermal limit data was entered into the Unit I process computer prior to beginning of cycle 15 startup.

If further changes to the core operating limits contained in this report are required during the operating cycle, a complete revised COLR will be issued and the appropriate procedures revised.

If there are any questions regarding this report, please contact this office.

Sincerely, 0 $

.T.Beckham,JI MCM/cr )

l

Enclosure:

Unit 1 Cycle 15 Core Operating Limits Report, Revision 1 cc: (See next page.) j i

9305280274 930521 O O fi2 a \ 1 i DR ADOCK 05000321 p t ,

PDR J

(3corgia Roveer J bi i

i U.S. Nuclear Regulatory Commission Page Two May 21, 1993_

cc: Georaia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant (w/o encl.)

NORMS (w/o encl.)

U.S. Nuclear Reaulatory Commission. Washinaton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion II Mr. S. D. Ebneter, Regional Administrator (w/o encl.) -

Mr. L. D. Wert , Senior Resident Inspector - Hatch F

1 h