ML20043D461

From kanterella
Jump to navigation Jump to search
Suppl 16 to Startup Test Rept, for Period Through 900530. W/900601 Ltr
ML20043D461
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/30/1990
From: Odell W
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.016, RTR-REGGD-1.016 RBG-32932, NUDOCS 9006080072
Download: ML20043D461 (4)


Text

,-

a

'Ia[n ,I, nW:

'b' o,

.G.

p"4 , , .

6. ,  ;

t

{ .

m . - GULF ST21TES UTILITIES COMP 21NY 'l s

RIVCR B( AD ST AilDS POS1 Of f 4Ci B04 720 57 MANC'5Vitti. LOW 5tAAA 70T/5 Apt A (ODE $04 (36 BM S46860

.,b June 1, 1990 RBG- 329 32 File Nos. G9.5, G9.25.1.5  !

Q U. S. Nuclear Regulatory Cm mission ,

2.ik a Document Control. Desk -l

^' Washington, D. C. 20555 I s; i Gentlenent l l'

River Bend Station - Unit 1 Docket No. 50-458 I

i Enclosed is Supplanent 36 to the Startup Test Report for River 1 Bend Station - Unit 1. This report covers the period through May 1 30, 1990. This infornation is provided pursuant to Technical '

Specifications 6.9.1.2 and 6.9.1.3 and Regulatory Guides 1.16 and 1.68. This report - closes all renaining test exceptions and is .

the final Startup Test Report for River Bend Station - Unit 1.

Sincerely, i q

l

, W. H. Odell' j Manager-Oversight l River Bend Nuclear Group l TFP/ 1 /pg Enclosure '

cc U. S. Nuclear Regulatory Cmmission Region IV .;

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 )

NRC Resident Inspector _;

P. O. Box 1051

~

p St. Francisville, IA 70775 i Mr. Walt A. Paulson' Project Manager, River Bend Station u Docununt Control Desk washington, D.C. 20555 90060s0072 900601 PDR ADOCK 05000459 ih \\

i P PDC /

I

,g':

- I j

'9' ,

s , 3 E6 , #2 i s 1. g .

t GULF STATES UTILITIES C00@ANY RIVER BEND STATION - UNIT 1 STARTUP TEST REPORT (SUPPLEMENT 16) 30 MAY 1990 3

k

)

2: ;t i

k 3

J

'i-i TUq.

/T; " . ,.

>i sI f ' .:, _

+

m . -

l.l ,

5 m

4 STARTUP TEST REPORT (SUPPLEMENT 16)-

,, c

1. The River Bend - Unit 1 Startup Test Program was concluded on June 16, 1986. fThis supplemental report provides the current status of open test exceptions fromLthe April 27, 1990 supplement of the ' Gulf States Utilities Company. River Bend Station - Unit 1, Startup Test Report.

Since the January 27,~1990' report,'theLlast three test exceptions have

-been closed completing the Startup. Test Program.

L$

ji}

lin i

N 1

<! l,,

'h' l I

n ,

1

- ~ ST-22 Pressum Asgulator i TTl-17: Status: Closed Pressure regulator failed Invel 2 criteria for incrmental regulation.

Operation of the systen through numerous actual plant transients has been satisfactory.- Engineering has evaluated data collected during plant power maneuvers and determined that this Test Exception can be closed. The pressure regulator has provided reliable control and has not caused any operational problems. This 7bst Exception is closed..

SP-25C/D Main Stean Line Flow Instruneritation TFr3: Status: Closed The elbow tap flow versus delta P curves are not within + 5% of the design  ;

curves. Elbow tap flow data was taken during power ascelision following the  ;

Refueling Outage (RF-1). General Electric has evaluated this data and  !

agreed that- this level 2 test exception does not impact safe, full power  :'

operation. Engineering has evaluated field calibration changes- and detennined that no changes are required. The present calibration provides appropriate indication and control and is proven to be reliable. This 1bst '

Exception is closed.

SP-30C Recirculation Systen Perfonnance 7Fe3: Status: Closed The Flow Control Valve mismatch that existed was o'uced fran 14% to 7% and the core and drive flow shortfalls have been resolvec'. Evaluation of data obtained during plant power maneuvers has led to tle conclusion that the grtem is acceptable as is. New data has shown the M ratio values to be acceptable. This is attributed to re-calibration of associated instruments. This Test Exception is closed.