LAP-1200 d R;visies 1

p April 21,' 1990
n '

27 4

t

\\'

b ATTACHMENT B

.i Core Operating Limite Report

. 3 for LaSalle County Station l

l; Unit 2, Reload 3 (Cycle 4) 4 l-

,[

.. i k

\\

-t i

1 ZWLAP 4 -

4 rv 9006060228 900601ADOCK 05000374 r

PDR

. PDC P

E

LAP-1200-16 Revision 1

~*

g,,

April 21, A990 28 i

I I

CORE OPERATING LIMITS REPORT l

1 l

ISSUANCE OF CHANCES

SUMMARY

l l

1

[

m Affected Affected Date

'l 4

Section Paoes Summary cf Chances l'-

I All All Oricinal Issue (Cycle,4) 4/90 l

l l

l-1 I

I l

1

'l l

l

.I 1.

t i

I I

I l

l l

l l

l I

I I

l l

1 I

I I

I LaSalle County - Unit 2

.1 Cycle 4 l

.I ZWLAP

LAP-1200-16~

u' R; vision l' April 21, 1990 29~

I I

CORE OPERATING LIMITS REPORT l-I

-l TABLE OF CONTENIS I

I I

I Page l 1

REFERENCES...

111 l

-l iv l

LIST OF FIGURES i

LIST OF TABLES.

v I.

1.0 AVERAGE DLANAR LINEAR HEAT GENERATION RATE ( 3/4. 2.1). -.

1-1 l l

1.1 Tech Spec Reference.

1-1 1 1.2

')escription.

1-1 l l

2.0 MINIMUM CRITICAL POWER RATIO (3/4.2.3).

2-1 l 1

l 2.1 Tech Spec Reference 2-1 l-2-1 l 2.2 Description.

.......~...........

l-3.0 LINEAR HEAT GENERATION RATE (3/4.2.4) 3-1 I I

3.1 Tech Spec Reference 3-1 l 3.2 Deacription.

3-1 l I

4.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION ( 3/4.3. 6).

4-1 l i

4.1 Tech Spec Reference.

4-1 l 4.2 Description.

4-1 l 1

I l

l l

l-L i

l l

l l

l l

1 i

LaSalle County - Unit 2 11 Cycle 4 l

1 ZWLAP 4

LAP-'1200-16

  • ~

Revision 1 April 21, 1990 30 l

l CORE OPERATING LIMITS REPORT I

I I

REFERENCES l

1 l

' l 1.

Commonwealth Edison Company Docket No. 50-373, LaSalle County Station, l

Unit 2 Facility. Operating License, License No. NPT-18.

l

- l 2.-

Letter from D. M. Crutchfield to All Power Reactor Licensees and l

Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific l

- Parameter Limits f rom Tech Specs, dated October 4, 1988.

l I

3.

Supplemental Reload. License Submittal fer LaSalle County Station, Unit 2, I

f Reload 3 (Cycle 4), 23A5973, Rev. O, December 1989.

l l

-LaSalle County Station, Units 1 and 2, SAFER /GESTR LOCA I

4.

Loss-of-Coolant-Accident Analysis, NEDC, 31510P (latest approved version). l I

S.

General Electric Standard Application for Reactor Fuel (GESTAR),

l 1

NEDE-24011-P-A (latest approved version).

I I

I I

I I

J l

I I

I I

l I

I l

1

^

1 l

I 1

I I

l 3

i LaSallt :ount.

2 111 t-4 l

1 ZWLAP i

s

.....--...-,-,..~m

i LAP-1200-16 e

R; vision 1 J.'.

April 21, 1990 1

.31 I

I CORE OPERATING LIMITS REPORT

-l l

.t LLEI Qf, FIGURES l

3 l

I FIGURE TITLE / DESCRIPTION PAGE l--

I

2. 2.1 Power Distribution Limits, MCPR vs. t at Rated Flow.

.' 2 l

I i

?.2-2 Power Distribution Limits, MCPR vs. t at Rated. Flow, 2-3 l

EOC-RPT_ Inoperable and Main Turbine l Bypass Inoperable.

-l l

2.2-3 Kf Factor vs. Core Flow %

2-4 I

l' t

i.

l l

l l

I I

I I

I l

l l

l I

l 1

l l

l l

l I

I i

l i

i I

l l

LaSalle County - Unit 2 iv Cycle 4 I

I ZWLAP L

x, LAP-1200-16 7. ' '

Revision 1

~~

April 21, 1990 32 I

l CORE OPERATING LIMITS REPORT l

1 l

LIST OF TABLES l

1 I

TABLE TITLE / DESCRIPTION EAGE I l

'l.2-1 Maximum Average: Planar Linear Heat Generation. Rate 1-2 l

(MAPLHGR) vs. Average Planar Exposure, Initial Core l

Fuel Type BCRb219.

I i

1.2-2 Maximum Average Planar Linear Heat Generation Rate 1-3 I

(MAPLHGR) vs. Average Planar Exposure for Fuel Type l

BP8CRB299L.

I i

1.2-3 Maximum Average Planar Linear Heat Generation Rate 1-4 l

(MAPLHGR) vs. Average Planar Exposure for Fuel Type l

BC320C.

I 1.

1.2-4 Maximum Average Planar Linear Heat Generation Rate 1-5 1

(MAPLHGR) vs. Average Planar Exposure for Fuel Type l

BC300D.

I I

1.2-5 Maximum Average Planar Linear Heat Generation Rate 1-6 I

(MAPLHGR) vs. Average Planar Exposure for Fuel Type I

P8CWB303-9GZ.

I i

1.2-0 Maximum Average Planar Linear Heat-Generation Rate 1-7 l

(MAPLHGR) vs. Average Planar Exposure for Fuel Type 1

PBCWB303-10GZ.

l 1

4.2-1 Control Rod Withdrawal Block Instrumentation Setpoints.

4-1 l

l' l

I l

l I

I LaSalle County - Unit 2

's Cycle 4 l

l 1

ZWLAP

LAPd200 -

c,f,

Rovision'1 April 21,l1990 33 I'

l CQRE' OPERATING LIMITS REEQRT l

l l

_ (3/4.2.11 1'

1.0 AVERAGE FLANAR LINEAR HEAT GENERATION RATE l

1.1-Tech Soec

REFERENCE:

I

~

l:

Tech Spec 3.2.1.

I i

1.2 DESCRIPTIGI l

1 The Maximum Average Planar Linear Heat Generation Rates l

(MAPLHGR) versus Average Planar Exposure for. fuel type II 8CRB219 's determined from Table 1.2-1.

l I

The Maximum Average Planar Linear Heat Generation Rates I

(MAPLHGR) versus Average Planar Exposure for fuel type l

BP8CRB299L is determined from Table 1.2-2.

l l

The Maximum Average Planar Linear Heat Generation Rates I

(MAPLHGR) versus Average Planar Exposure for fuel type l

BC320C is determined from' Table 1.2-3.

l' I

The Maximum Average Planar Linear Heat Generation Rates ~

l (MAPLHGR) versus Average Planar Exposure for tuel type l

BC300D is determined from Table 1.2-4.

l l

The Maximum Average Planar Linear Heat Generation Rates l

(MAPLHGR) versus Average Planar Exposure for fuel type I

P8CWB303-9GZ is determined from Table 1.2-5.

l l

The Maxicaum. Average Planar Linear Heat Generation Rates l

(MAPLHGR).versus Average Planar Exposure for fuel type l

P8CWB303-10GZ is determined from Table 1.2-6.

l l

l l

l-l I

l l

l 1

I l

LaSalle County - Unit 2 1-1 Cycle 4 l

l ZWLAP

LAP-1200-16

-RGvision.1 April 21, 1990 L(,.

34 4

MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) l vs. AVERAGE PLANAR EXPOSURE-FOR FUEL TYPE 8CRB219 I

I

-CORE OPERATING LIMITS REPORT l

l.

TABLE 1.2-1 l

'l.

I Exposure (mwd /ST)

LATTICE SPECIFIC MAPLHGR (kw/ft) i I

BCIL232 l

l 200 11.90 l

1000 12.00 l_

5000 12.10 l-10000 12.20 l

15000 12.20

'l '

20000 12.10 l

25000 11.60-I 30000 11.20 l

37200-10.00 l

l' l.

I-1 I

I I

I

.I I

l l

I I

I I

I I

I I

I I

l-I i

LaSalle - Unit 2 1-2 Cycle 4 I

I ZWLAP

LAP-1200-16

'f

' Revision 1 April 21, 19GO 35 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) l vs. AVERAGE. PLANAR EXPOSURE FOR FUEL TYPE BP8CRB299L l

l CORE OPERATING LIMITS REPORT.

l

[

TABLEE 1.2-2 l

l I

u Exposure (mwd /ST)

LATTICE SPECIFIC MAPLHGR (kw/ft) l o'

P8CRL319 I

I 200 10.80 l

1000 11.00 l'

5000 11.80 l

10000 12.30 l

15000 12.40 l

20000 12.30 l

25000 11.80 l

30000 11.25 1

35000 10.70 l

45000 9.20 l

i I

l-1 I-1 I

I I

i I

l l

1 I

l I

I I

I 1

I I

I I

LaSalle - Unit 2 1-3 Cycle 1 l

1 ZWLAP

LAP-1200-16 Revision 1 i,-

April 21, 1990 36 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) l vs. AVERAGE PLANAR EXPOSURE FOR FUEL TYPE BC320C ll' CORE OPERATING LIMITS REPORT l-I FIGURE 1.2-3 l

l l

l Exposure (mwd /ST)

LATTICE SPECIFIC MAPLHGR (kw/ft)

I l'

P8 COL 340-7G4.0 P8 COL 340-7G3.0 P8COLO71 l

1 0.0 11.57 11.63 12.44 l

12.36 200 12.15 l

1000 2000 12.08 l

3000 12.21 12.08 I

4000 12.25 12.41 12.10 l

6000 12.57 12.83 l

8000-12.94-13. ')6 -

l 10000 13.12 12.25 l

12500 13.03 13.04 l

15000 12..* 1 12.72

'l:

10.11-l 25000-35000 10.15 10.16 8.53 l-45000 8.50 8.55 l

45600 5.09 l

50000 6.08 6.12

'l

_1 I

I I

I I

l l

l l

l l

I I

l

-l 1

I I

LaSalle - Unit 2 1-4 Cycle 4 l

1 ZWLAP

LAF 1200 Rovision 1' April 21, 1990.

37-MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR)

I vs. AVERAGE PLANAR EXPOSURE FOR FUEL TYPE bC300D l

1 CORE OPERATING LIMITS REPORT I

I FIGURE 1.2-4 I

I Exoosure (mwd /ST)

LATTICE SPECIFIC MAPLHGR (kw/ft)

.l l

P8 COL 319 PBCOLO71 1.

6G3.0 l

1 0.0 11.77 12.44 l

200 12.36 l

1000 12.15 l

2000 12.33 12.08 I

3000 12.61 12.08 l-4000 12.91 12.10 1

5000 13.22 l

10000 13.45 12.25 l

15000 13.17 l

25000 10.11 35000 10.65 8.53 l

45000 8.73 l

45600 S.09 l

50000 6.62 l

I l

l<

l I

I l

I

'l l

i I

I I

.I 1

i I

LaSalle - Unit 2 1-5 Cycle 4 l

l ZWLAP t

LAP-1200-16 Ravision 1 April 21,~1990 3B MAXIMUM AVERAGE PLANAR LINEAP HEAT GENERATION RATE (MAPLHGR) l vs. AVERAGE DLANAR EXPOE:WE FOR TUEL~ TYPE P8CWB303-9GZ l.

I-CORE OPERATING LIMITS REPORT 1 l

I TABLE 1.2-5 l

l-I DP9EIR LATTICE SPECIFIC MAPLHGR (k @

l-(mwd /ST) l P8CWLO71 P8CWL327 P8CWL333 P8CWL327 P8CWLO71 l

NOG 9G5.0 405.0/5G4.0 4GS.0/5G4.0 9GE-l.

I 0. 10 12.74 11.98 11.35 12.01 12.74

'l 200 12.67 12.05 11.39 12.08 12.67 l

1000 12.48 12.17 11.48 12.22 12.48 l

2000 12.42.

12.37 11.67 12.43 12.42 l.

.3000 12.41 12.56 11.90 12.61 12.41 l

4000 12.44 12.69 12.16 12.78 12.44 l

5000 12.~46 12.81 12.38 12.91 12.46 l-6000-12.49 12.92 12.56 13.03 12.49 l

7000 12.51 13.04 12.75 13.15 12.51 l

8000 12.54 13.16 12.94 13.27 12.54 l

9000 12.55 13.29 13.13 13.37 12.55 l-10000.

12.57 13.41 13.29 13.47 12.57 l'

12500 12.41 13.49 13.33 13.51 12.41 l-15000 12.04-13.18 13.05 13.20 12.04-l 20000 11.27 12.54 12.46 12.55-11.27 l

25000-10.49 11.84 11.87 11.84 10.49 l

35000 8.95 10.35 10.54 10.36 8.95 1l' 45000 6.15 9.02 9.14 9.02 6.15 l

5.21 l

46900 5.21 5.90

.l 51500 51800

.5.82 5.81 l-1 I

I I

I I

I l-l I

I l

LaSalle - Unit 2 1-6 Cycle 4 l

l ZWLAP

LAP-1200-16 S

Revision 1 April 21, 1990

~39 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE-(MAPLHGR) vs. AVERAGE PLANAR EXPOSURE FOR FUEL; TYPE P8CWB303-10GZ CORE OPERATING LIMITS REPORT TABLE 1.2-6 Eroosure LATTICE SPECIFIC MAPLHGR (kw/ft)

IMWd/ST)

PBCWLO71 P8CWL326-P8CWL338 PBCHL326 P8CWLO71 NOG 6C5.0/4G4.0 10G4.0 10G4.0 10GE 0.0 12.74 12.02 11.69 12.07 12.74 200 12.67 12.08 11.75 12.14 12.67 1000 12.40 12.23.

11.91 12.30 12.48 2000 12.42 12.44 12.09 12.55 12.42-3000 12.41 12.68 12.25 12.81 12.41 4000 12,44 12.89 12.40 12.98 12.44 5000 12.46 13.04 12.56 13.15 12.46 6000 12.49 13.18 12.72 13.29 12.49 7000

'12.51 13.33 12.88 13.36 12.51 8000 12.54 13,49

.13.05 13.44 12.54 9000 12.55 13.57 13.21 13.53 12.55 10000 12.57 13.54 13.33 13.60 12.57-12500 12.41 13.61 13.29 13.63 12.41 15000 12.04 13.29 12.97 13.31 12.04 20000 11.27 12.63 12.33 12.64 11.27 25000 10.49 11.84 11.70 11.85 10.49 35000 8.95 10.35 10.40 10.36 8.95 45000 6.15 9.00 8.97 9.01 6.15 46900 5.21 5.21.

51100 5.90 51900 5.78 32000 5.79 LaSalle - Unit 2 1-7 Cycle 4 ZWLAP a

.1 LAP-1200 1 ROvisica 1 April 21, 1990 40 i

I I

CORE QPIRATING LIMI*1S REPORT

-l l

l 2.0 MINIMUM CRITICAL PONER RATIO (3/4.2.3) l 2.1 Tech Spec

REFERENCE:

l I

s Tech Spec 3.2.3.

l l.

2.2 DESCRIPTION

-l '

I a.

Single Recirculation Loop Operation l

t i

The MCPR limit when in Single Recirculation Loop l

Operation is determined from Floure 2.2-1 plus 0.01, l

times the Kf factor determined from Figure 2.2-3.

l l

b.

Two Recirculation Loop Operation l

1 The MCPR limit when in Dual Recirculation Loop l

Operation is determined from Figure 2.2-1 times the Kf l factor determined from Figure 2.2-3.-

l

-l c.

Two Recirculation Looo Operation with Main Turbine l

Byuass Inoperable l

l l

The MCPE limit when in Dual Recirculation Loop l

Operation with the Main Turbine Bypass Inoperable (per I Tech Spec 3.7.13) is determined from Figure 2.2-2 l

times the Kf factor determined from Figure 2.2-3.

I l

i l:

d.

Two Recirculation Looo Ooeration with End-of-Cvele l

Recirculation Pump Trip System Inoperable l

l l

The MCPR limit when in Dual Recirculation Loop.

l Operation with the=End-of-Cycle Recirculation Pump l

Trip System (RPT) Inoperable (per Tech Spec 3.3.4.2) l 1s determined from Figure 2.2-2 times the Kf factor l

determined from Figure 2.2-3.

.I p

l l

I l

1 i

LaSalle County - Unit 2 2-1 Cycle 4 l

I ZWLAP

h.

~

Power Distribution Limits st MCPR 3

y g

=

iC-1.340--

/

E g

P8CRB303-9GZ/P8CRB303-10GZ /

s 2

1.320 -

f y

/

'/

'/

1.300-E

,/ y Y

C.)

~

N

,/

8CRB219/BP8CRB299L/BC300D/BC320C 1.280 1.260 -

57 1.240 i

I I

.687

.700

.720

.740

.760

.780

.800

.820

.840 JE0 e.g g g WCPR versusYal Rated flew EE Figure 2.2-1

i!

.4-Power Distribution Limits o

MCPR - E00S

.I.

c h~

(All fuel types) r 1.380

t.

a E-E 1.370 -

,m i

1.360 -

y

/

  • ~

E00-RPTInoperable~/

y/

1.340 -

l

' ~ ~.

m E5 1.330- #

7

~T' '_,

1 1.320 -

Main Turbine BypassInoperable l

1.310 -

1 1.300 -

1.290 -

y 1.280 I-

.687

.700

.720

.740-

.760

.780

.809

.820

.840

.860 0 { j' S WCPR versus'r a Rated Flow CEE Figure 2.2-2 Bll

~

Kf Factor g

g

{

J 1.50 g

A N

Jr s

S N

lie-e 1.40 N

=

N

\\

\\ s '

\\

1.30 N 's AUTOMAil0 FLOW CONTROL Kf CEVE s N N

e 1.20 -

y

\\

\\

^

s

\\

1.10 N

' 's HANUAL FLOW CONTROL Kf CEVE

\\

s 's I

s N

N 1.00 1

0.90 25 30 40 50 60 70 80 90 100 Core ow %.

r e

p Figure 2.2-3 Eli

.9

=

~%

~

5:

LAP-1200 -

Rovision 1.

April 21, 1990 44 l

l CORE OPERATING LIMITS REPORT 1

l l-3.0 LINEAR HEAT GENERATION RATE (3/4.2.4) l 1

- 3.1 -

Tech SDts_2EFERENCE:

l l

Tech Spec 3.2.4.

l-l

3.2 DESCRIPTION

-l l

a.

The LHGR limit is 13.4 kw/ft for fuel types I

I 1.

8CRB219 l

2.

BP8CRB299L I

I

'b.

The LHGR limit is 14.4 kw/ft for fuel types:

l l

1.

BC300D l-2.

BC320C li 3.

P8CWB303-9GZ l

4.

P8CWB303-10GZ l

I l-1 I

I I

I I

I l

I I

I I

l l

1 1

I l

1 l

1 LaSalle County - Unit 2 3-1 Cycle 4 l

l

=

ZWLAP mammmene a