y,

~.:

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION 4

THE CLEVELAND ELECTRICAL ILLUMINATING COMPANY, ET A1.

DOCKET NO. 50-440 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U.S. Nuclear Regulatory Commission (Comission) has issued Amendment No, to Facility Operating License No. NPF-58, issued to the C1'.veland Electric. Illuminating Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licensees), which revised the Technical Specifications for operation of the Perry Nuclear i

Power Plant Unit No. 1, located in Lake County, Ohio. The amendment was effective as of the date of issuance.

The amendment modified the Technical Specifications (TS) to revise the Setpoint and Allowable Values for the Turbine First Stage Pressure Trip in notes (h) and (b) of Tables 3.3.1-1 and 3.3.4.2.1 of the-TS.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations

.in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for 1

Hearing in connection with this action was published in the FEDERAL REGISTER i

en March 30, 1990 (55 FR 12075). No request for a hearing or petition for leave to intervene was filed following this notice.

l l

r o227 900307 p$51jDOCK03000440 L

l-PDC

u

(

  • The Commission has prepared an Environmental Assessment related to the action and has determined not to prepare an environmental impact statement.

O Based upon the environmental assessment, the Commission has concluded that the

-i.suance of this amendment will not have a significant effect on the quality of the human environment.

For further details with respect to the action see (1) the application for amendment dated May 20, 1988, as supplemented November 27, 1989, (2)AmendmentNo.29toLicenseNo.NPF-58,(3)theCommission'srelated Safety Evaluation dated May 7,1990, and (4) the Environmental Assessment dated April 27, 1990 (55 FR 18990). All of these items are available for.public inspection at the Commission's Public Document Room, Gelman Building, 2120 L Street N.W., and at the Perry Public Library, 3753 Main Street, Perry, Ohio 44081. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Director, Division of Reactor Projects III, IV, Y and Special Projects.

Dated at Rockville, Maryland this 7th day of May 1990.

FOR THE NUCLEAR REGULATORY COMMISSION l

John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation j