MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N, MISSISSIPPI 39205 NUCLE AH PRODUCTION DEPARTMENT March 5, 1982
<h U.S. Nuclear Regulatory Commission
.\\
Office of Nuclear Reactor Regulation N
Washington, D.C.
20555
,N h:Q q
~.
19p 2
b
m lE, % y[
Attention:
Mr. Harold R. Denton, Director u.
\\L,
lef" %
s
Dear Mr. Denton:
/ <^%/
A)
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0272/L-334.0/L-860.0 SER Confirmatory Item 1.10(4)
AECM-82/81 Consistent with our commitment on the subject, the Safety Evaluation Report (SER) on Grand Gulf Nuclear Station (GGNS),
NUREG-0831, requires additional analysis dealing with soil-structure interaction to be provided for your review by March 1, 1982.
This analysis has been delayed and will be reported to you no later than March 31, 1982.
This issue is addressed in the GGNS SER as Confirmatory Item 1.10(4).
Please advise if further information is required.
Yours truly, 4r
/. F. Dale
[ Manager of Nuclear Services JGC/JDR:Im cc:
Mr. N. L. Stampley Mr. G. B. Taylor Mr. R. B. McGehee Mr. T. B. Conner 0/
.c Mr. Richard C. DeYoung, Director 1
Office of Inspection & Enforcement
/
D 1
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8203090289 820305 PDR ADOCK 05000416 E
PDR AE1H1 Member Middle South Utilities System
-