ML20036A863
| ML20036A863 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/10/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20036A864 | List: |
| References | |
| NUDOCS 9305170106 | |
| Download: ML20036A863 (5) | |
See also: IR 05000445/1993016
Text
.
g-[pR RIGgIg
UNITE D ST ATES
NUCLEAR REGULATORY COMMISSION
o
[
if
j
REGloN IV
h 1 ^[$
8
611 R Y AN PL AZA DRIVE. SUIT E 400
5,
8
AR UNGToN. T E XAS 76011-8064
"
MAY l 01993
Dockets:
50-445
50-446
Licenses:
NPF-89
TV Electric
ATTN:
W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
SUBJECT: NRC INSPECTION REPORT 50-445/93-16; 50-446/93-16
This refers to the readiness assessment team inspection conducted by Mr. W. B.
Jones, and the inspectors identified in the enclosed report, of this office,
and the Office of Nuclear Reactor Regulation, on March 24-29, 1993.
The
inspection included a review of activities authorized for the Comanche Peak
Steam Electric Station, Units 1 and 2, facility. At the conclusion of the
inspection, the findings were discussed with you, Mr. W. Taylor, and those
members of your staff identified in the enclosed report.
This special team inspection was conducted to evaluate the initial dual unit
operations and the readiness of Unit 2 for full-power operation. The focus of
the inspection was to evaluate the effectiveness of management controls and
personnel practices, the implementation of the safety assessment program, and
the actions taken by the licensee in response to one of the deficiencies
identified in NRC Inspection Report 50-446/92-201.
The team evaluated the
conduct of operational activities, including management oversight, maintenance
and surveillance scheduling, and engineering and technical support.
Plant
operational activities oF arved included the conduct of operations and the
implementation of main +
.ce and surveillance activities. Within these areas
the inspection consiste. of selective examinations of procedures and
representative records, interviews with personnel, and observation of
activities in progress.
The team concluded that your staff had demonstrated the ability to control
activities and operate both units safely in accordance with NRC requirements.
The inspection team's findings are discussed in the enclosed report.
A violation of NRC requirements was identified, as discussed in Section 4.2.2
of the enclosed inspection report.
The team determined that the work
instructions associated with the installation of the Borg-Warner pressure seal
check valve alignment device on one of the Unit 2 turbine-driven auxiliary
feedwater lines was not adequate. However, this violation is not being cited
9305170106 930510
ADDCK 05000445
G
llI
-
,
.
TU Electric
-2-
.
F
because the criteria in paragraph Vll.B(2) of Appendix C to 10 CFR Part 2 of
the NRC's " Rules of Practice" were satisfied.
!
In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a
copy of this letter and its enclosure will be placed in the NRC's Public
Document Room.
Should you have any quest ions concerning t his inspection, we will be pleased
to discuss them with you.
Sincerely.
!
C
[
}
.-
flggua
,
,hp; Division of Reacthes 'roje
. Bill Beach, Dibec or
/)
s
L'
Enclosure:
Appendix - NRC Inspection Report
50-445/93-16; 50-446/93-16 w/at t ac hment
cc w/ enclosure:
TV Electric
!
ATTN:
Roger D. Walker, Manager of
Regul atory Af f airs f or Nuclear
Engineering Organization
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
Juanita Ellis
-
'
President - CASE
1426 South Polk St reet
Dallas, Texas
75224
6
'
CDS Associates, Inc.
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
TU Electric
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland 20814
-
--
.
_ . . _
__
_
. _ .
. _ - . - _ .
_ . _ . . _ . _ . - _ _
..
_, .-
.
i
J
!
.TU Electric
-3-
j
-i
-!
!
Jorden, Schulte, and Burchette
l
ATTN: William A. Burchette, Esq.
'
Counsel for Tex-La Electric
j
Cooperative of Texas
!
1025 Thomas Jefferson St., N.W.
.
Washington, D.C.
20007
'!
!
Newman & Holtzinger, P.C.
.';
ATTN: Jack R. Newman, Esq.
t
1615 L. Street, N.W.
'
Suite 1000
i
Washington, D.C.
20036
Texas Department of Licensing & Regulation
-l
ATTN:
G. R. Bynog, Program Manager /
Chief Inspector
i
Boiler Division
-l
P.O. Box 12157, Capitol Station
Honorable Dale McPherson
$
I
County Judge
P.O. Box 851
t
Glen Rose, Texas 76043
!
Texas Radiation Control Program Director
,
1100 West 49th Street.
i
Owen L. Thero, President
!'
'
Quality Technology Company
P.O. Box 408
l
201 West 3rd
l
Lebo, Kansas 66856-0408
l
.
i
.
b
i
!
$
!
[
h
-I
!
I
-l
-
i
.
-
-
-
.
e
.TU Electric
~4-
MAY l 01993
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
TEMurley, NRR (MS: 12G18)
FJMiraglia, NRR (MS: 12G18)
WTRussell, NRR (MS: 12G18)
JGPartlow, NRR (MS: 12G18)
CERossi, NRR (MS: 9A2)
!
DPNorkin, NRR (MS: 9A1)
JNRoe, NRR (MS: 13E4)
SCBlack, NRR (MS: 13H15)
BEHolian, NRR (MS: 13H15)
,
RIV: SRI:DRP/B
SRI:DRP/Q
C:DRP/D f
LI:DRS/0)
C:DRS/05
RI:MJ
WBJones:h ,
LJSmith[
TFStetkb. JMKeetk. JLPel1[t hk
emore
I / 6 /93
f/S/9k 's / /g /93 [ r/[g /93k T/d> /k,n
57 6 /93
'
C:D M )
NRR: SIB:bRILPE:DR /B,
C:DP/B/
D b h D:DRP h
k, , ,
LAYandeh TPGwynn
ABBEACH
GLfon h e
JDWilco @ <(
TReis
j
t(/[/93
6 77 /93
f f/h/93 h f/[3 /9[
(/Jo/93
I/O/93
(,tmd aW -
f
140003
nspa l
>a
.
e
TU Electric
~4~
MAY I O 1993
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
TEMurley, NRR (MS: 12G18)
FJMiraglia, NRR (MS: 12G18)
WTRussell, NRR (MS: 12G18)
JGPartlow, NRR (MS: 12G18)
CERossi, NRR (MS: 9A2)
DPNorkin, NRR (MS: 9A1)
JNRoe, NRR 'MS: 13E4)
SCBlack, NRR (MS: 13H15)
BEHolian, NRR (MS: 13H15)
<
RIV: SRI:DRP/B
SRI:DRP/D
C:DRP/D f
LI:DRS/05
C:DRS/05
RI:)f5S7)$
WBJones:wd ,
LJSmith[
TFStetkk
JMKeetchy, JLPell[t_hb
'
emore
I/6 /93N[n
f/[3 /9Yk 5/6/93
r/h/93[a T/d>/
hl 6 /93
m
NRR: SIB RIL
PE:DR /B,
C:DNP/B/ D.k h D:DRP Y
C:DM f
k,,
LAYandek'/TPGwynn
ABBEACHbf
GLfontJMke
JDWilcodCW.,,
TReis
)
f/h/937[., i/d /9[
(/}p/93
I/O/93
(/ (, /93
6 77 /93
(tuytMcW-
l'
~ At
h (;']
4