Text
_ - - - _ - _ _ _ _ - - -.
' NORTHEAST UTILITIES cene,ei Omcee seicen street. Bernn. Connecticut v.e um cwi on..o uw cw.c 1
.u i%..ss.ws acw c"**
P.O. BOX 270
[I[dYsN 1, H ARTFORD. CONNECTICUT 06141-0270 k
k J
(203) 665-5000 ow.r,m,ca
..:.. r.~
l April 8, 1993 MP-93-274 l
Re:
10CFR50.71(a) l U.
. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555 l
l
Reference:
Facility Operating License No. DPR-21 Docket No. 50-245 I
l l
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6. 9.1. 6, the j
following monthly operating data report for Millstone Unit 1 is enclosed.
j One additional copy of the report is enclosed.
l l
l l
Very truly yours, i
NORTHEAST NUCLEAR ENERGY COMPANY (a s Stephen E Scace Vice President - Millstone Station l
l SES/GSN 1
cc:
T.
T. Martin, Region I Administrator J.
W. Andersen, NRC Project Manager, Millstone Unit No. 1 P.
D.
Swetland, Senior Resident Inspector, Millstone Unit Nos.
1, 2 & 3
)
T 9304120152 930331 l' 1 j
PDR ADOCK 0500 5
R t
l
OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 930405 i
COMPLETED BY G. Newburch TELEPHONE (203) 447-1791 EXT 4400 OPERATING STATUS
+----------------------------+
1.
Docket Number:
50-245 Notes:
2.
Reporting Period:
March 1993 3.
Utility
Contact:
G.
Newburgh 4.
Licensed Thermal Power (MWt);
2011 5.
Nameplate Rating (Gross MWe):
662 6.
Design Electrical Rating (Net MWe):
660 I
Maximum Dependable Capacity (Gross MWe):
684
+----------------------------+
j 8
Maximum Dependable Capacity (Net MWe) :
654 l
l 9.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
l Y!A l
- 10. Power Level To Which Restricted, If any (Net MWe):
N/A
- 11. Reasons For Restrictions, If Any:
N/A This Month Yr.-To-Date Cumulative
- 12. Hours In Reporting Period 744 2160 195816
- 13. Number Of Hours Reactor Was Critical 744 2160 151629.4
- 14. Reactor Reserve Shutdown Hours 0
0 3283.3
- 15. Hours Generator On-Line 744 2160 147935.8
- 16. Unit Reserve Shutdown Hours 0
0 93.7
- 17. Gross Thermal Energy Generated (FDG) 1481151 4286734 278153607.0
- 18. Gross Electrical Energy Generated (MWH) 493818 1429516 93840512.0
- 19. Net Electrical Energy Generated (MWH) 472578 1367955 89520866.0
- 20. Unit Service Factor 100 100 75.5
- 21. Unit Availability Facter 100 100 75.6
- 22. Unit Capacity Factor (Using MDC Net) 97.1 96.8 69.9
- 23. Unit Capacity Factor (Using DER Net) 96.2 96.0 69.3 l
- 24. Unit Forced Outage Rate 0
0 12.3
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each).
N/A
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
N/A 27.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALIIT N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
--n.
..,.g
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-245 UNIT:
Millstone Unit 1 l
DATE:
930405 l
I COMPLETED BY:
G.
Newburoh I
TELEPHONE:
(203) 447-1791 EXT:
4400 MONTH:
MARCH 1993 i
DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 643 17 641 2
642 18 641 3
637 19 641 4
641 20 641 l
5 640 21 641 6
640 22 641 7
641 23 641 8
640 24 520 9
641 25 641 10 633 26 641 11 640 27 641 12 640 28 641 13 641 29 641 14 602 30 641 15 640 31 637 16 641
)
i INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
e DOCKET NO.
50-245
~
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 \\
DATE 930405 COMPLETED BY G.
Newburch TELEPHONE (203) 447-1791 REPORT MONTH MARCH 1993 EXT.
4400 l
2 No.
Date Type Duration Reason Method of License System Component Cause & Corrective 4
5 (Hours)
Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence 4
N/A r
2 3
4 1 F: Forced Reason:
Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for License C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61)
E-Operator Training & License Examination Previous month 5
F-Administrative 5-Power Reduction Exhibit 1 - Same Source G-Operational Error (Explain)
(Duration =0)
H-Other (Explain) 6-Other (Explain)
e l
s REFUELING INFORMATION REOUEST 1.
Name of facility:
Millstone 1 2.
Scheduled date for next refueling shutdown:
February 1994 I
3.
Scheduled date for restart following refueling:
April 1994 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Chances Recarding:
(1) Maximum Averace Planar Linear Heat Generatina Rate and (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting i
information:
j Summer 1993 a
l 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
188 GE10 Fuel Assemblies i
i 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage cool:
i In Core: (a) 580 In Spent Fuel Pool: (b) 2116 (unconsolidated) i B.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present capacity: Maximum 3229 fuel assembly locations.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1997. Spent Fuel Pool Full, Core Off Load capacity is reached.
. - -.., ~,,.. -.