me Portland General Electric Company James E. Cross Vice President and Chief Nuclear Officer February 25, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Dear Sirs:
Regulatory Guide 1.97 Updated IJnplemenMi_on_Slatits The purpose of this letter is to provide the final status of Regulatory Guide 1.97 implementation at the Trojan Nuclear Plant (TNP). Based on updated information, Portland General Electric Company (PGE) has identified that only two design change commitments remain to_be implemented:
(1) Reactor Coolant Syst,em Wide-Range Hot-Leg and Cold-Leg Temperature, and (2) Steam Generator Wide-Range Level. As a result of PGE's submittal of January 27, 1993, which stated PGE's intent not to restart the 174P, the remaining design changes will not be implemented.
If in the future PGE's decision to close the TNP is reversed, these commitments will be revisited.
Sincerely, L
(A w sc W. R. Robinson for J. E. Cross c:
Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. Kenneth Johnston NRC Senior Resident inspector Trojan Nuclear Plant 9303090028 930225 gDR ADOCK 05000344 4
l Q U o v u v fDR 121 SW Salmon Street, Portland, OR 97204 503/464-8897