ML20030E134

From kanterella
Jump to navigation Jump to search
Forwards Revision to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790)
ML20030E134
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/15/1981
From: Bowmaker N
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8109180003
Download: ML20030E134 (2)


Text

.

4 BALTIM ORE GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARYLAND 21203 4

NORMAN J. BoWMAMER VICE PRES 6 DENT 8

dg

.Sepfember 15,1981 p

cE~E m s o cEs JA.

G-Docket Nos. 50-317/318 f,

9 8

Mr. Robert A. Clark, Chief Operating Reactor Branch #3

' 's pp' Division of Licensing n

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Clark:

In accordance with the provisions of 10CFR50.54(p), the enc 1csed revision (5 copies) to the Safeguards Contingency Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2, is submitted. This change is Revision 2 to the Plan.

The revisions are necessitated by changes in implementation proce-dures and organizational changes, as a result of further refinement of the security program at the Calvert Cliffs Nuclear Power Plant by the Baltimore Gas and Electric Company.

In addition, the Matrices of the Plan have been placed in a revised format for greater ease in representing the actual flow of safeguards events.

All changes have been underlined for ease of reference.

A summary of other major changes is as follows:

I All title cnanges nocessitated by recent organizationai revisions have been reflected in the Plan.

l Definitions have been added to Section 1.4.

All references to " industrial" sabotage have been changed to " radiological" sabotage.

Section 1.1 has been revised to reflect the threat defined in 10CFR73.1.

l i

Where appropriate, the Plan has been changed to reflect changes resulting from the publication of 10CFR73.71(c) and Regulatory Guide 5.62, regarding reporting of safe-guards events.

l 8109180003 810915~

PDR ADOCK 05000317 hi F

PDR

Events 3-A, 3-B, 3-C, 3-D, 6-A, 6-B, and 6-C have been consolidated into Events 3-A~through 4.

Editorial and gramatical changes have been made, wherd appropriate.

This revision does not decrease the effectiveness of safeguards at the Calvert' Cliffs Nuclear Power Plant.

Sincerely, 1

O gh?%p VVy1^

Normanb.Bowmaker Vice-President, General Services Enclosures cc: -Region ', USNRC, Office of Inspection and Enforcement Messrs. A. E. Lundvall (with enclosures)

R. L..C. Olson J. A. Tiernan R. C. Dernoga J. G. Deegan y

.-,+-_g

+-.--w

---,-,,--,,. + - -, -. -

y-