Forwards IE Insp Rept 50-389/81-05 on 810428-0501 & Notice of Violation
ML20010J128
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/27/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20010J076 List:
References
NUDOCS 8109290618
Download: ML20010J128 (2)


See also: IR 05000389/1981005

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

s4

.

$

p"'%,%

-

UNITED STATES

DESICIATED ORIGINAB

)

-

8 } Milg

NUCLEAR REGULATORY COMhMd BY

-

c

REGION 11

'

g-

j#

o

101 MARIETTA ST., N.W., SUITE 3100

Q

ATLANTA. GEORGIA 305o3

MAY 2 71981

l

w

l

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

I

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report No. 50-389/81-05

This refers to the routine safety inspection conducted by Mr. B. R. Crowley of

this office on April 28 - May 1,1981, of activities authorized by N3C Construc-

tion Permit No. CPPR-144 for the St. Lucie facility.

Our preliminary findings

were discussed with Mr. B. J.

Escue, Site Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

-

<

In accordance with 10 CFR 2.790 of the Coin.... 31on's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure. This section further

8109290618 810918

PDR ADOCK 05000 % 9

G

PDR

_ - _ _ _ _

t'

MAY 271981

'

.

.

.

.

.

Florida Power and Light Company

'2

requires the statement'to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to'be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

_you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

~

sb?.l;

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/81-05