ML20010J128
See also: IR 05000389/1981005
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
s4
.
$
p"'%,%
-
UNITED STATES
DESICIATED ORIGINAB
)
-
8 } Milg
NUCLEAR REGULATORY COMhMd BY
-
c
REGION 11
'
g-
j#
o
101 MARIETTA ST., N.W., SUITE 3100
Q
ATLANTA. GEORGIA 305o3
MAY 2 71981
l
w
l
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
I
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentlemen:
Subject: Report No. 50-389/81-05
This refers to the routine safety inspection conducted by Mr. B. R. Crowley of
this office on April 28 - May 1,1981, of activities authorized by N3C Construc-
tion Permit No. CPPR-144 for the St. Lucie facility.
Our preliminary findings
were discussed with Mr. B. J.
Escue, Site Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
-
<
In accordance with 10 CFR 2.790 of the Coin.... 31on's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure. This section further
8109290618 810918
PDR ADOCK 05000 % 9
G
_ - _ _ _ _
t'
MAY 271981
'
.
.
.
.
.
Florida Power and Light Company
'2
requires the statement'to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to'be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
_you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
~
sb?.l;
R. C.
ewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-389/81-05
cc w/ encl:
B. J. Escue, Site Manager
N. Weems, Assistant QA
Construction Manager
<
r
k
4
4