ML20010A028

From kanterella
Jump to navigation Jump to search
Forwards LER 81-049/03L-0
Date released: 01/24/2020 Download: ML20010A028


LER 81-049/03L-0:on 810724,fire Hose Station 1-RB-20 Was Inoperable Due to Station Isolation Valve Handwheel & Valve Stem Being Broken Off.Cause Undetermined.Valve Replaced. Hose Returned to Operability
ML20010A029
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/28/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010A029 (1)
Forwards LER 81-049/03L-0
ML20010A027
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/28/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010A027 (1)